Drawings.pdf
PDF 2 MB Posted
- Attached to
- RECOVERY - Trailhead Bulletin Boards Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0349
About this file
Drawings 22 Pages
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 18.pdf | ||
| chap_14_manufacturing_specification.pdf | ||
| s-10-0349 BILLBOARDS.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clearwater National Forest
Recreation Bulletin Boards
February 22, 2010
Palouse District - Recreation Site Signing
North Fork District - Recreation Site Signing
At 4th of July Trail-head.
At Fish Lake/ Goose Creek combined trailhead.
At Fish lake.
At Isabella Point Trail-head.
At Sta-tion Creek Camp
Lochsa District - Recreation Site Signing
Two signs will be need-
ed. One at the old camp-ground and one at the Eldorado site.
At the Lolo Creek Trail-head.
At the Mus-sellshell Trail-head
At Wilder-ness Gate-way Camp-ground.
Powell District - Recreation Site Signing
At Colt Creek Trailhead.
Fr am ed -T w o
P an el S he et
4” x
” p re ss ur e tre at ed b oa rd fra m ed _t w op an el
_s he et ta ll
1/ 2” o r 3
/4 ” D ig id ita l l am in at e, /2
” o r
3/ 4”
C om m er ci al s ig n bo ar d:
M D
O
H D
O , o r M ed
E x
G ra ve l
C on cr et e fo ot in g
2” x
” w oo d tri m
6” x
” p re ss ur e tre at ed po st o r 8 ”x
8”
2” x
” w oo d tri m at ta ch ed to p os ts an d to p an d bo tto m ra ils a nd pa ne ls w /2
” s s de ck s cr ew s o.
c.
1/
2” x
” s s ca rr ia ge bo lt w
/lo ck w as he r
3/ 4” x
2” g al v.
la g sc re w w
/w as he r co un te r-si nk h ea d pl ug h ol e w
/w oo d pl ug
1/ 2” x
” s s ca rr ia ge bo lt w /lo ck w as he r
S ec ti on
2’ 6”
7’ -6
” t al l
3’ -6
” d ee p
A t l ea st w id th
File details come from the government source that posted it. Updated .