Amend 01 attach.docx
DOCX document 15 KB Posted
- Attached to
- Recovery**Access Management Implementation, Idaho-Panhandle NF Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0272
About this file
Amendment 001 (cont)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| amend 02 0272.pdf | ||
| amend001.pdf | ||
| AG-82B1-S-10-0272.doc | DOC document | |
| specifications.doc | DOC document | |
| Wage Determination.docx | DOCX document | |
| AG-82B1-S-10-0272.pdf | ||
| drawings.pdf | ||
| fire precautions.doc | DOC document | |
| FS ARRA SIGN DETAILS 2apr09.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment to Amendment No. 1, Solicitation AG-82B1-S-10-0272
These changes are made in the following locations and wherever they may appear in this solicitation.
1. Change Ecology block size from 3’x3’x6’ to 2’x2’x6’. Pay Items 65003B1 and 72501, delete the words “size 3’x3’x6’” and replace with “size 2’x2’x6’”. This change applies to:
Section B – 1, SCHEDULE OF ITEMS
Page 2 of 28 of drawings, Summary of Estimated Quantities
Page 4 of 28 of drawings, Road 209, Work Description.
Page 5 of 28 of drawings, Trail 30.A and Trail 30.6, Work Descriptions.
Page 11 of 28 of drawings, Road 911G, Work Description.
Page 13 of 28 of drawings, Road 452, Work Description.
Pages 26 of 28 of drawings, Construction Notes.
2. Change road closure type at Glidden Lakes Area from a rock barrier to a motorcycle block gate. This change applies to:
Section B – 1, SCHEDULE OF ITEMS and page 2 of 28 of drawings, Summary of Estimated Quantities; add 1 Pay Item 65001G4 Furnish and install road closure device type, gate, size motorcycle block(EST QTY is now 2). Delete 1 65001B2 Furnish and install road closure barrier type, rock, size large (EST QTY is now 4).
Section C – 1(b) Project Location, Glidden Lakes Area, Road 615; delete the word “barrier” and replace with the word “gate”.
Section C – 1, Add the following sub-section (h) Resource Concerns. Due to weight restrictions on the bridge in the Glidden Lakes Area, Road 615 construction equipment is allowed one stream crossing to move into the site and one stream crossing to move out of the site. Stream crossings are only allowed after July 15th. A mini-excavator is recommended for this job. Bridge length is 28.5’ and out to out bridge width is 13’.
After work is completed restore stream banks restored to an acceptable condition as determined by the Contracting Officer.
Page 7 of 28 of drawings, Road 615, Work Description; delete the words “Item 65003B2, road closure barrier type, rock, size large” and replace with “Item 65001G4 road closure device type, gate, size motorcycle block”.
3. Change the description of rock size in the Magee Ranger Station Area, Road 925. This change applies to:
Page 11 of 28 of the drawings, Road 925, Work Description; delete the words “size 3’x3’x6’” and replace with “size large”.
4. 4 in 1 loader bucket is not required for Endloader/Backhoe. This change applies to:
Sub-section 622.02 Rental Equipment, Endloader/Backhoe; delete the words “4 in 1 loader bucket”.
File details come from the government source that posted it. Updated .