Supplemental Specifications.pdf

PDF 412 KB Posted

Attached to
Fishtrap Gravel Crushing and Placement Federal contract opportunity
Solicitation number
AG-82B1-S-10-0205
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Intermountain

About this file

Supplemental Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Fishtrap Gravel Crushing and Placement, newest first.
File Type Posted
S-10-0205_abstract.xls XLS spreadsheet
Maps.pdf PDF
AG-82B1-S-10-0205.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Forest Service Supplemental Specifications

FISHTRAP GRAVEL CRUSHING AND PLACEMENT

Lolo National Forest

Plains/Thompson Falls Ranger District

Sanders County, Montana

Table of Contents

Forest Service Supplemental Specifications

Table of Contents

Preface

101 - Terms, Format, and Definitions

102 - Bid, Award, and Execution of Contract

103 - Scope of Work

104 - Control of Work

105 - Control of Material

106 - Acceptance of Work

107 - Legal Relations and Responsibility to the Public

108 - Prosecution and Progress

109 - Measurement and Payment

151 - Mobilization

155 - Schedules for Construction Contracts

320 - Stockpiled Aggregates

321 - Major Aggregate Courses

625 - Turf Establishment

651 - Development of Pits & Quarries

703 - Aggregate

718 - Traffic Signing and Marking Material

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of

National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association

Mine Safety and Health Administration

National Institute of Standards and Technology

National Electrical Safety Code

West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the ―purchaser‖.

Culvert--No definition.

http://www.nist.gov/

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--―Equitable adjustment,‖ as used in the Federal Acquisition

Regulations, or ―construction cost adjustment,‖ as used in the Timber Sale Contract, as applicable.

Change--―Change‖ means ―change order‖ as used in the Federal Acquisition Regulations, or

―design change‖ as used in the Timber Sale Contract.

Design Quantity--―Design quantity‖ is a Forest Service method of measurement from the FS-96

Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term will replace the term ―Contract Quantities‖.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the

Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36

CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

Exact time and location of spill including a description of the area involved.

Containment procedures.

Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

Add the following subsection:

109.10 Methods of Measurement.

One of the following methods of measurement for determining final payment is DESIGNATED

IN THE SCHEDULE OF ITEMS for each PAY ITEM.

(a) Design Quantity (DQ)” These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) Changes in the work authorized by the CO.

(2) A determination by the CO that errors exist in the original design that cause a

PAY ITEM quantity to change by 15 percent or more.

(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.

(b) Actual Quantities (AQ). These quantities are determined from measurements of completed work.

(c) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.

109.03_nat_us_03_29_2005

109.03 Weighing Procedures and Devices.

(c) Project weighing system.

Add the following:

Both certified platform and belt-conveyor scales are required. Platform scales will be used to measure placed aggregate and belt-conveyor scales will be used to measure stockpiles material.

151 - Mobilization

151.00_01_us_10_11_2006

Delete Section 151 in its entirety and replace with the following.

Description

151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest Service lands, according to the requirements within.

Construction Requirements

Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.

Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.

Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.

Use methods of cleaning and locations for cleaning approved by the CO.

For work at a commercial washing facility, use an approved facility.

New infestations of noxious weeds of concern to Forest Service and identified by either

Contractor or Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party. Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

Measurement

151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an ―each‖ basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.

Measure mobilization according to Subsection 109.02.

Payment

151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection

109.05.

Progress payments for mobilization lump sum will be paid as follows:

(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5

Payments Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.

(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.

(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.

(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.

Include all costs associated with the initial cleaning of equipment in the unit bid price for

Mobilization. Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

156 - Public Traffic

156.03 Accommodating Traffic During Work.

Delete the first paragraph and replace with the following:

Accommodate traffic according to the requirements set forth below, MUTCD, and Section 635.

Submit a traffic control plan for acceptance at least 30 days before intended use.

Add the following project specific requirements:

The Contractor will not be allowed to close the road. Advanced warning signs shall be placed at road intersections above and below the work site as approved by the CO.

Forest Road #7609 will be closed at various times and duration between July 15 and September 1

For the construction of the W. FK. Fishtrap Bridge at MP 3.2 and for the installation of 3 large culverts at MP 5.5, 5.7, and 5.9. The remainder of this road and all other project roads will be otherwise open, however, the Forest Service is likely to have other road construction activities in progress and coordination will be necessary.

It is the responsibility of the Contractor to schedule delivery of materials, equipment and all necessary supplies to the site, to ensure that the crushing and placing can be substantially completed within the specified contract time. The Contractor shall be responsible for providing, installing, maintaining, and removal of warning signs and barricades required for the traffic control in accordance with MUTCD as submitted and approved in the traffic control plan.

Delete the following from the last sentence of the last paragraph:

according to Subsection 106.07(b)

156.08 Traffic and Safety Supervisor.

Delete this subsection in its entirety.

320 - Stockpiled Aggregates

320.00_01_us_10_11_2006

320.01. This work consists of furnishing and placing aggregate in a stockpile at an existing site or constructing a new site and placing the aggregate at the new site.

Material

320.02. Conform to the following Section:

Aggregate 703

Provide the gradation and quality requirements specified in the Section identified in the pay item.

320.03 Stockpile Site. Prepare existing sites as necessary to accommodate the quantity of aggregate to be stockpiled.

For new sites, clear and grub according to Section 201. Grade shape and compact the site to a uniform cross-section that drains. Place, compact, and maintain a minimum of 6 inches of crushed aggregate over the stockpile site and access roads. Prevent contamination of the stockpiles.

320.04 Stockpile. After producing a representative quantity of aggregate, submit initial gradation test results, including the size ratio calculations or proposed target values outlined in

FSSS 703.05, as applicable for approval by the C.O.

Request site approval before stockpiling aggregates. Make the stockpiles neat and regular in shape. Make the side slopes no flatter than 1:1.5.

Build the stockpiles in layers not exceeding 3 feet thick. Complete each layer before depositing aggregates in the next layer. Do not allow aggregates from the one layer to run down over lower layers of the stockpile. Do not drop aggregates from a bucket or spout in one location to form a cone-shaped pile. Do not build the finished stockpile with a conveyor. Conveyors may be used for making small temporary surge piles.

Construct stockpile layers by spreading aggregates with trucks or other approved pneumatic-tired equipment. Do not push aggregates into piles.

When operating trucks on stockpiles, avoid tracking dirt or other deleterious material onto the stockpiled material.

Space stockpiles far enough apart or separate stockpiles by suitable walls or partitions to prevent the mixing of the different aggregate gradations.

320.05 Acceptance. Stockpiled aggregate will be sampled and tested according to a random statistical sampling plan every 1,000 tons. Gradation and size ratios results will be evaluated under Subsection 106.05. The point of sampling will be the stockpile.

Preparation of stockpile sites and construction of stockpiles will be evaluated under Subsections

106.02 and 106.04.

Clearing will be evaluated under Section 201.

Measurement

320.06. Measure the Section 320 items listed in the bid schedule according to Subsection 109.02.

Payment

320.07. The accepted quantities will be paid at the contract price per unit of measurement adjusted according to Subsection 106.05 for the Section 320 pay items listed in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection

109.05.

321 - Major Aggregate Courses

321.00_01_us_10_11_2006

321.01 This work consists of constructing one or more courses of aggregate on a prepared surface. Work includes producing aggregate by grid rolling, screening, or crushing methods, or placing pit-run or Government-furnished aggregate. Work may include additive mineral filler, or binder.

Surface aggregate grading is designated as shown in Table 703-3.

Subbase and base aggregate grading is designated as shown in Table 703-2.

Screened aggregate grading is designated as shown in Table 703-16.

Material

321.02 Conform to the following Subsections:

Aggregate 703.05

Water 725.01

Bentonite 725.30

Calcium Chloride flake 725.02

Magnesium Chloride or Calcium Chloride liquid 725.02

Lignin Sulfonate 725.20

321.03 General. Water the existing road surface and blade to achieve the crown or cross slope indicated on the drawings. Compact the bladed road surface according to Compaction Method C in Section 321.05. Maintain the roadbed shape, moisture content and compaction while placing crushed aggregate.

Request approval of the roadbed in writing before placing aggregate.

Develop and use Government provided sources according to Section 105.

Develop, haul, and apply water in accordance with Section 170.

Develop pit in accordance with Section 651.

Submit a written quality control plan and perform the Contractor quality control and inspections according to Section 153.

No quality requirements or no gradation other than maximum size will be required for pit run and grid-rolled material. For grid rolling, use all suitable material that can be reduced to maximum size.

After processing on the road, remove all oversize material from the road and dispose of it as directed by the CO.

Provide additives or binder, if required, at the proportions specified.

If the aggregate is produced and stockpiled before placement, handle and stockpiled according to

Section 320. Establish stockpile sites at approved locations.

321.04 Mixing and Spreading. Mix the aggregate and adjust the moisture content to obtain a uniform mixture with a moisture content suitable for the specified compaction method. Spread and shape the mixture on the prepared surface in a uniform layer with no segregation of size, and to a loose depth that will provide the required compacted thickness.

Do not place in layers exceeding 6 inches in compacted thickness for aggregate base and surface courses or twice the maximum particle size for screened aggregate. When more than one layer is necessary, compact each layer according to Subsection 321.05 before placing the next layer.

Route hauling and leveling equipment uniformly over the full width.

When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.

When additives are specified ensure that aggregate, additives, and any required water, mineral filler, and binder are mixed by the specified method. Control additive proportions to 0.5 percent dry weight.

Additive Mixing Methods:

(a) Stationary Plant Method. Mix the aggregate with other required materials in an approved mixer. Add water during the mixing operation in the amount necessary to provide the moisture content for compacting to the specified density. After mixing, transport the aggregate to the jobsite while it contains the proper moisture content, and place it on the roadbed or base course using an aggregate spreader.

(b) Travel Plant Method. After placing the aggregate for each layer with an aggregate spreader or windrow-sizing device, uniformly mix it with other required materials using a traveling mixing plant or rotary mixer. During mixing, add water to provide the necessary moisture content for compacting to the specified density.

(c) Road Mix Method. After placing the aggregate for each layer, mix it with other required materials at the required moisture content for compacting to the specified density until a uniform distribution is obtained.

321.05 Compacting. Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.

Compact the aggregate using one of the following methods as specified:

Compaction A. Adjust the moisture content to a level suitable for compaction. Operate spreading and hauling equipment over the full width of each layer of the aggregate.

Compaction B. Operate rollers and compact as specified in Subsection 204.11.

Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in

Subsection 204.11(a).

Compaction D. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 99, method C or D.

Compaction E. Compact each layer of aggregate to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method

(available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O.

Box 7669, Missoula, MT 59807).

Compaction F. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.

Compaction G. Compact each layer of aggregate to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method

(available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O.

Box 7669, Missoula, MT 59807).

Compaction H. Compact the aggregate by operating compaction equipment over the total width until visible deformation ceases. A minimum of five complete passes shall be made at a moisture content suitable for compaction.

Compaction I. Adjust the moisture content to a level suitable for compaction. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:

(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.

(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.

(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.

For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.

321.06 Construction Tolerance. If grade finishing stakes are required, finish the surface to within ±0.05 feet from staked line and grade elevation.

If grade finishing stakes are not required, shape the surface to the required template and check the surface with a 10-foot straightedge. Defective areas are surface deviations in excess of 1/2 inch in 10 feet between any two contacts of the straightedge with the surface.

Correct all defective areas by loosening the material, adding or removing material, reshaping, and compacting.

Ensure that the compacted thickness is not consistently above or below the specified thickness.

The allowable average thickness of four random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness. The maximum variation from the compacted specified thickness is ½ inch.

Ensure that the compacted width is not consistently above the specified width. The allowable average width of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width. The maximum variation from the specified width will not exceed

+12 inches at any point.

321.07 Maintenance. Maintain the aggregate course to the correct line, grade, and cross-section by blading, watering, rolling, or any combination thereof until placement of the next course. Correct all defects according to Subsection 321.06.

321.08 Acceptance. See Table 321-1 or Table 321-2 as applicable, for sampling and testing with the exception of that the point of sampling will be from the windrow after processing or from the roadbed.

Aggregate gradation and surface course plasticity index will be evaluated under Subsection

106.05. If the aggregate is obtained from a Government stockpile then the above characteristics will be evaluated under Subsection 106.02. Other aggregate quality properties will be evaluated under Subsections 106.02 and 106.04. Placement of aggregate courses will be evaluated under

Subsections 106.02 and 106.05.

The allowable upper and lower aggregate gradation limits are the Target Value plus or minus the allowable deviations shown in Tables 703-2 and 703-3.

The allowable upper and lower Plasticity index limits for surface courses are stated in 703.05(b).

Preparation of the surface on which the aggregate course is placed will be evaluated under

Section 204 or 303 as applicable.

Measurement

321.09 Measure the Section 321 items listed in the bid schedule according to Subsection 109.02 and the following as applicable.

Measure square yard width horizontally to include the top of aggregate width including designed widening. Measure the square yard length horizontally along the centerline of the roadway.

If the measurement for aggregate is by cubic yard using contract quantities then measure aggregate by the cubic yard in-place once compacted, otherwise measurement for aggregate by the cubic yard is measured by the cubic yard in the hauling vehicle.

Measure thickness perpendicular to the grade of the travelway.

Measure width perpendicular to the centerline.

Payment

321.10 The accepted quantities will be paid at the contract price per unit of measurement adjusted according to Subsection 106.05 for the Section 321 pay items listed in the bid schedule.

Payment will be full compensation for the work prescribed in this Section. See Subsection

109.05.

T a b le

-1

S m p li n g a n d

T es ti n g R eq u ir e m en ts

R e p o r ti n g im e

B ef o re u si in w o rk h o u rs h o p li t

S a m p le

Y es w h re q u es te d

P o in t o f

S a m p li u rc e o f m at er ia l

F ro m w in d ro w o r ro ad b ed a ft er ro ce ss

F ro m w in d r ro ad b ed a ft e r p ro ce ss a m p li e q u e n c y er t y p so rc e o f m at er ia l p er to s “ p er s

T e st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O

T

A

S H

T O

T

S H

T O

T

T M

D

S H

T O

T

S H

T O

T

T M

D

S H

T O

T

C te g ry at a ra c te r is ti c

L A a b ra si

(c ar se

S o d iu m s u lf at e so u n d n es s lo ss ar se f e)

D ra b il it y i n ex ar se f e) ra ct u fa ce s

G ra d at io

L iq u id l it ct u re d f ac la st ic it y i n p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a st ed fo co n fo rm an

(1

.0

M ea su re d a co n fo rm

.0

M ea su re d a co n fo rm

.0 te ri a l o r

P ro d u c t

A g g re g at e so u rc e q u al

.0 b b as e, B as e, a n d S u rf ac e co u rf ac e co u b le

-1 co n ti n u ed

S a m p li n g a n d

T es ti n g R eq u ir e m p o r ti e

B ef o re u si n g i rk

B ef o re p la ci t la o

M in im u m o f p o in ts p er p ro ct r.

li t

S a m w q u es in t o f

S a m p li u rc e o f m at e ri al

In -p la ad b ed a co m p ac ti ro m w in d r o ad b ed a ce ss m p li e q u e n er t y p e so rc e o f m at er ia l p er t o n s p er e ac h

.5 il p er s

T e st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O

T

(1

R -1

M ar sh al l

A A

S H

T O

(1

R -1

M ar sh al l

A A

S H

T O

T o th er a p p ro v ce d u re s te g a ra c te r is ti c

M o is tu re -d en si ty et h o

D is tu re -d en h o

E is tu re -d en h o is tu re -d en h o

G

In -p la ce d en o is tu co te n t

W id th ic k n es s

A m o u n t o f ad d it iv p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a co n fo rm

.0

M ea su re d a co n fo rm

.0

M a te ri a l o r

P ro d u c t

S u b b as e, B as e, a n d S u rf rf b le

-2 m p li n g a n d

T es ti n g R eq u ir e m p o r ti e h o p li t

S a m o in t o f

S a m p li m t h e w in d ro w o r ro ad b ed a ce ss in g o r fr o m a p p ro v cr sh er s am p li ev ic e

S a m p li e q u e n t o n s

T e st

M e th o d s

S p e c if ic a ti o n s

A A

S H

T O

T

S H

T O

T

S H

T O

T te g a ra c te r is ti c

P la st ic

L

L iq u id

L

G d at io p e o f

A c c e p ta n c e

(S u b se c ti o n

M ea su re d a co n fo rm

.0 te ri a l o r

P ro d u c t

S cr ee n ed

A g g re g

625 - Turf Establishment

625.00_01_us_10_12_2006

625.07 Seeding.

Delete the first sentence and add the following.

Apply seed mix by the following methods.

(a) Dry method. Delete the third sentence.

Add the following after subsection (b).

Seed Mix. Furnish and apply the following kinds and amounts pure live seed:

Lolo Seed Mix A (9/08)

Quantity of Pure

Kind of Seed Live Seed (Lbs/Acre)

1. Annual Ryegrass 6.0

2. Mountain Bome 4.0

3. Sheep Fescue 4.0

4. Thickspike Wheatgrass 4.0

5. Pubescent Wheatgrass 5.0

6. Slender Wheatgrass 5.0

Total …………28 Pounds/Acre

Determine the pounds of seed to be furnished per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.

Example 5 lbs. pure live seed/acre = 6.55 lbs. commercial

0.90 x 0.85 seed per acre; purity = 90% and germination = 85%

651 - Development of Pits & Quarries

651.00_01_us_10_12_2006

651.01 This work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.

651.02 General. Submit a plan of operations according to Section 105. Perform all work in accordance with Sections 105, 201, 203, 204, 625, and 635, landscape preservation requirements, and the approved pit and quarry development plan of operations. Perform the work in accordance with MSHA 30 CFR, part 56.

651.03 Acceptance. Developing pits and quarries will be evaluated under Subsections 106.02 and 106.04.

651.04 Restoration. After excavation has been completed in part or all of the area, slope and grade the sides, and smooth the general pit area as shown on the plans.

Rip and drain access roads that are marked on the drawings for obliteration; block them to traffic; and seed them in Accordance with Section 625.

Payment

651.05 Pit Development is considered a subsidiary item to Sections 204, 251, 252, 253, 301, 302, 321, or 322. No separate payment will be made under this Section or Sections 204, 251, 252, 253, 301, 321, ,322, or 409.

703 - Aggregate

703.20_01_us_10_12_2006

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Do not furnish material that contains asbestos fibers.

Replace Table 703-3 with the following:

Table 703-3. Gradation ranges for Size Ratio surface courses.

% by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

Sieve Grading Grading Grading Grading

Size F-SR F-SR with

Bentonite

G-SR G-SR with

Bentonite

1 ½ in. 100 100

1 in. 97-100 97-100 100 100

¾ in. 70 - 98 70 - 98 97-100 97-100

½ in. 58 - 88 58 - 88 70 - 98 70 - 98

No. 4 36 - 60 36 - 60 44 - 70 44 - 70

No. 8 25 - 47 25 - 47 30-54 30-54

No. 30 12 - 31 12 - 31 15 - 34 15 - 34

No. 200 10 –20 (a) 10 - 15 10 – 20 (a) 10 - 15

Note: SR and PI are abbreviations for Size Ratio and Plasticity Index.

(a) If the minus No. 40 material in finished product has a PI greater than 0, the percent pass No. 200 range is 8 to 15%.

The gradation shall closely parallel the specification gradation curves. Percent passing ½ inch, No. 4, and No. 30 sieves shall all be in either the upper, middle, or lower portion of the specification band. Size ratios, as defined below, shall be determined for each sieve analysis test. The maximum difference between the ½ inch and No. 4 size ratio, the No 4 and No. 30 size ratio, and the ½ inch and No. 30 size ratio, shall not exceed 0.50.

½ inch size ratio = (Test % Pass ½ inch) - (Min % Pass 1/2 inch)

(Max % Pass 1/2 inch) - (Min % Pass 1/2 inch)

No.4 size ratio = (Test % Pass No.4) - (Min % Pass No.4)

(Max % Pass No.4) - (Min % Pass No.4)

No.30 size ratio = (Test % Pass No.30) - (Min % Pass No.30)

(Max % Pass No.30) - (Min % Pass No.30)

718 - Traffic Signing and Marking Material

718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.