S-10-0106_amend_1.pdf
PDF 698 KB Posted
- Attached to
- Recovery Road 250 Resurfacing Federal contract opportunity
- Solicitation number
- AG-82B1-S-10-0106
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| bid abstract--AG-82B1-S-10-0106.pdf | ||
| S-10-0106_amend_2.pdf | ||
| rd 250 specs.pdf | ||
| S-10-0106_solicitation_coversheet.pdf | ||
| AG-82B1-S-10-0106_drawings.pdf | ||
| AG-82B1-S-10-0106.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 6
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
One (1) 4/12/10 359438
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service Intermountain EROC 740 Simms Street Golden, CO 80401
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-82B1-S-10-0106
9B. DATED (SEE ITEM 11)
3/18/10
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
1. The schedule of Items, as originally issued, is deleted and the attached is sutstituted.
2. Clause C-1 a., is changed to read as follows:
Work consists of road reconditioning and placement of crushed aggregate surfacing on approximately 7 miles of Road 250 from Noe Creek Campground 7 miles west. Quarry development, rock crushing and pit development also are included. A government furnished quarry is located ½ mile west of Kelly Forks Work Center.
3. Clause F-2, is amended to read as follows, “…(c) complete the entire work ready for use not later than September 3, 2010.
(Continued on next page)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Stephen M. Patton
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
4. Clause H-2, the table in this clause is deleted and replaced with the following:
Location
Designation
Quantity
At Jct. of State Hwy 11 and FS Rd. 250 ROAD CONSTRUCTION 32 MILES AHEAD 1
At Jct. of Rds. 250 and 669, Orogrande Bridge
ROAD CONSTRUCTION 12 MILES AHEAD 1
At Jct. of Rd. 250 and Rd. 247.
Bungalow
ROAD CONSTRUCTION 3 MILES AHEAD 1
On Rd. 250 at Sprauge Creek ROAD CONSTRUCTION 1.3 MILES AHEAD 1
On Rd. 250 at Milepost 31.8 ROAD CONSTRUCTION AHEAD
HEAVY TRUCK TRAFFIC FOR NEXT 15 MILES
On Rd. 250 at Hoodoo Pass ROAD CONSTRUCTION 37 MILES AHEAD 1
At Jct. of Rd. 250 and Rd. 255, Kelly Forks W.C.
ROAD CONSTRUCTION AHEAD
HEAVY TRUCK TRAFFIC FOR NEXT 15 MILES
5. Clause I-1, the following by-reference clause is added: 52.217-7 Option for Increased Quantity—Separately Priced Line
Item ((MAR 1989), fill-in: July 1, 2010.
6. Section M, the following by-reference provision is added: 52-217-7, Evaluation of Options (JUL 1990)
7. Section 103 of the Appendix A Forest Service Supplemental Specifications is deleted and the attached is substituted.
8. Drawing sheets 1 and 2 are deleted and the attached sheets are substituted.
9. The closing date and time for receipt of bids is extended to April 23, 2010 at 3:00 PM, MT.
AG-82B1-S-10-0106 RECOVERY Road 250 Resurfacing
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS
ROAD 250 RESURFACING
North Fork Ranger District
Clearwater National Forest
Clearwater County, Idaho
B - SCHEDULE OF ITEMS
Base Bid
TOTAL BID PRICE ( ALL BASE BID ITEMS ) $___________
Optional Item
Total Price (Base plus Optional Items) $_______
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price
Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01
Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Contractor Name: Phone:
Signature: Fax:
Email:
Address: Tin:
City, State, Zip: DUNS:
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
Lump Sum
30322
Road Reconditioning, Scarify 4” depth, Compaction Method
B
Miles
32111
Aggregate Surface Course
Tons
16,805
30322
Road Reconditioning, Scarify 4” depth, Compaction Method
B
Miles
2.8
32111 Aggregate Surface Course Tons 6723 $_______ $_______
Road 250 Resurfacing
North Fork Ranger District Page 8
Clearwater National Forest
103 - Scope of Work
103.01 Delete
Delete all but subsection 103.01 Intent of Contract.
Work consists of road reconditioning and placement of crushed aggregate surfacing on approximately 7 miles of Road 250 from Noe Creek Campground to 7 miles West. Quarry development, rock crushing and pit restoration also are included.
A government-furnished quarry is located ½ mile west of Kelly Forks Work Center in T39N, R9E, Section 13.
Reconditioning includes scarifying as specified, blading, cleaning ditches and catch basins, and preparing bridge approaches for gravel. Quarry development consists of clearing, grubbing, stripping and storing topsoil, if necessary, removing overburden, constructing an access road/safety bench, conducting restoration activities as specified, and all other activities and incidental work required.
The Contractor must furnish all labor, materials, equipment tools, transportation, and supplies necessary to complete the work according to the contract.
Traffic control is incidental to Section 151. The contractor must furnish all labor, materials, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.
Optional Item # 1 – consists of reconditioning and resurfacing an additional 2.8 mile from milepost 31.8 to the Bungalow Bridge.
STATE FOREST PROJECT NAME SHEET SHEETS
SUMMARY OF ESTIMATED QUANTITIES IDAHO CLEARWATER ROAD 250 RESURFACING 2 6
Item No. Description Quantitiy Unit
15101 Mobilization 1 L.S.
30322 Road Reconditioning 7 Mile
32111 Major Aggregate Courses 16,805 Tons
Optional #1
Item No. Description Quantitiy Unit
30322 Road Reconditioning 2.8 Mile
32111 Major Aggregate Courses 6,723 Tons
GENERAL NOTES:
1) Disposal site is at Death Creek.
2) Water draft sites will be identified in field.
3) Turnouts will be staked in the field. They shall have 15' transitions.
4) Project is located next to stream. Care shall be taken not to sidecast material into live water.
5) Crusher site will be scarified to a depth of 4" and reseeded upon completion of project according to Section 625.