Lolo National Forest Roadside Brushing
| HYPERLINK \l "_Toc241210200" Contract Terms and Conditions | 3 |
| HYPERLINK \l "_Toc241210201" 52.212-4 Contract Terms and Conditions - Commercial Items. (MAR 2009) | 3 |
| HYPERLINK \l "_Toc241210202" 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items. (APR 2009) | 7 |
| HYPERLINK \l "_Toc241210203" CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 16 |
| HYPERLINK \l "_Toc241210204" Solicitation Provisions | 33 |
| HYPERLINK \l "_Toc241210205" 52.212-1 Instructions to Offerors - Commercial Items. (JUN 2008) | 33 |
| HYPERLINK \l "_Toc241210206" 52.212-2 Evaluation - Commercial Items. (JAN 1999) | 36 |
| HYPERLINK \l "_Toc241210207" 52.212-3 Offeror Representations and Certifications-Commercial Items. (AUG 2009) | 36 |
SERVICES AND PRICES
EAST ZONE ROAD BRUSHING
Missoula, Ninemile & Seeley Lake Ranger Districts Lolo National Forest Missoula, Powell, Granite & Mineral Counties, Montana Schedule of Items Item No. 1 - Brushing of Roadside Right-of-Way on the Missoula Ranger District Sub-item No.
Description Pay Unit Estimated Quantity Unit Price Amount
1.1 Roadside Brushing Mile 125.6
1.2 Equipment Rental (Brushing Tractor) Hour
1.3 Equipment Washing (As directed) Each
TOTAL QUOTE
Item No.2 - Brushing of Roadside Right-of-Way on the Ninemile Ranger District Sub-item No.
Description Pay Unit Estimated Quantity
2.1
Mile 119.3
2.2
Hour
2.3
Each
Item No.3 - Brushing of Roadside Right-of-Way on the Seeley Lake Ranger District Sub-item No.
Description Pay Unit Estimated Quantity
Mile 137.2
2.2
Hour
Each
Note 1: The Quoter must quote on all subitems within each Item. Only quotes to the nearest cent will be accepted.
Note 2: Quoters, who quote on more than one item, may qualify their quotes to limit the total quantity of work they will accept. Quoters desiring to qualify their quote must complete the following:
"My quote is limited to a maximum of $ ___________ and a minimum of $ ____________
Contract Terms and Conditions
52.212-4 Contract Terms and Conditions - Commercial Items. (MAR 2009)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights -
(1) Within a reasonable time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice. (1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer--Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment. (1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected contract line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) Interest. (i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.
(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.
(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.
(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.
(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.
(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.
(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 265 and 10 U.S.C. 2409 relating to whistleblower protections; Section 1553 of the American Recovery and Reinvestment Act of 2009 relating to whistleblower protections for contracts funded under that Act; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.
(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The schedule of supplies/services.
(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts paragraphs of this clause.
(3) The clause at 52.212-5.
(4) Addenda to this solicitation or contract, including any license agreements for computer software.
(5) Solicitation provisions if this is a solicitation.
(6) Other paragraphs of this clause.
(7) The Standard Form 1449.
(8) Other documents, exhibits, and attachments.
(9) The specification.
(t) Central Contractor Registration (CCR). (1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(2)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.
(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor's CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.
(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at http://www.ccr.gov or by calling 1-888-227-2423 or 269-961-5757.
(End of clause)
52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items. (APR 2009)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: Contracting Officer check as appropriate.
[X ](1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (DEC 2008)(Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
[X ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Section 1553 of Pub. L. 111-5).
[X ] (4) 52.204-11, American Recovery and Reinvestment Act--Reporting Requirements (MAR 2009) (Pub. L. 111-5).
[ ](5) 52.219-3, Notice of Total HUBZone Set-Aside (JAN 1999) (15 U.S.C. 657a).
[X ](6) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JUL 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[ ](7) Reserved.
[X ](8)(i) 52.219-6, Notice of Total Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
[ ](ii) Alternate I (OCT 1995) of 52.219-6.
[ ] (iii) Alternate II (MAR 2004) of 52.219-6.
[ ](9)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C. 644).
[ ](ii) Alternate I (OCT 1995) of 52.219-7.
[ ] (iii) Alternate II (MAR 2004) of 52.219-7.
[X ](10) 52.219-8, Utilization of Small Business Concerns (MAY 2004) (15 U.S.C. 637 (d)(2) and (3)).
[ ](11)(i) 52.219-9, Small Business Subcontracting Plan (APR 2008) (15 U.S.C. 637(d)(4).
[ ](ii) Alternate I (OCT 2001) of 52.219-9.
[ ](iii) Alternate II (OCT 2001) of 52.219-9.
[X ](12) 52.219-14, Limitations on Subcontracting (DEC 1996) (15 U.S.C. 637(a)(14)).
[ ](13) 52.219-16, Liquidated Damages--Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).
[ ](14)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323)(if the offeror elects to waive the adjustment, it shall so indicate in its offer.)
[ ](ii) Alternate I (JUN 2003) of 52.219-23.
[ ](15) 52.219-25, Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting (APR 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
[ ](16) 52.219-26, Small Disadvantaged Business Participation Program - Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
[ ] (17) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004)(15 U.S.C. 657 f).
[X ] (18) 52.219-28, Post Award Small Business Program Rerepresentation (APR 2009) (15 U.S.C. 632(a)(2)).
[X ](19) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
[ ](20) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (FEB 2008) (E.O. 13126).
[X ](21) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).
[X ](22) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
[X ](23) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
[X ](24) 52.222-36, Affirmative Action for Workers with Disabilities (JUN 1998) (29 U.S.C. 793).
[X ](25) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
[X ](26) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (DEC 2004) (E.O. 13201).
[X ](27) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[X ](28)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ](ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ](29) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
[ ] (30)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423).
[ ](ii) Alternate I (DEC 2007) of 52.223-16.
[X ](31) 52.225-1, Buy American Act - Supplies (FEB 2009) (41 U.S.C. 10a-10d).
[ ] (32)(i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (FEB 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, Pub. L 108-77, 108-78, 108-286, 109-53 and 109-169).
[ ](ii) Alternate I (JAN 2004) of 52.225-3.
[ ](iii) Alternate II (JAN 2004) of 52.225-3.
[ ] (33) 52.225-5, Trade Agreements (MAR 2009) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
[X ](34) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[ ](35) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).
[ ](36) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
[ ](37) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
[ ](38) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
[X ](39) 52.232-33, Payment by Electronic Funds Transfer - Central Contractor Registration (OCT 2003) (31 U.S.C. 3332).
[ ](40) 52.232-34, Payment by Electronic Funds Transfer - Other than Central Contractor Registration (MAY 1999) (31 U.S.C. 3332).
[ ](41) 52.232-36, Payment by Third Party (MAY 1999) (31 U.S.C. 3332).
[ ](42) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[ ](43)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631).
[ ](ii) Alternate I (APR 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
[X ](1) 52.222-41, Service Contract Act of 1965 (NOV 2007) (41 U.S.C. 351, et seq.).
[X ](2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
GS-4 Step 1 - $11.00 + Fringes
[ ](3) 52.222-43, Fair Labor Standards Act and Service Contract Act--Price Adjustment (Multiple Year and Option Contracts) (NOV 2006) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
[ ](4) 52.222-44, Fair Labor Standards Act and Service Contract Act--Price Adjustment (FEB 2002) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
[ ](5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (NOV 2007) (41 U.S.C. 351, et seq.).
[ ](6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).
[ ](7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247).
[ ] (8) 52.237-11, Accepting and Dispensing of $1 Coin (SEP 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records - Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (DEC 2008) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
(ii) 52.219-8, Utilization of Small Business Concerns (MAY 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Section 1553 of Pub. L. 111-5). Applies to subcontracts funded under the Act.
(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (SEP 2006) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (JUN 1998) (29 U.S.C. 793).
(vii) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (DEC 2004) (E.O. 13201).
(viii) 52.222-41, Service Contract Act of 1965 (NOV 2007) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (NOV 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-Requirements (FEB 2009)(41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (Jan 2009).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT/ATTACHMENTS
This work is being solicited as a performance-based service contract. Performance based means the Contractor is responsible for an end product.
General Specifications
Scope of Contract
The performance-based services covered in this contract are for the furnishing of all labor, equipment, supervision, transportation, operating supplies, and incidentals necessary to perform roadside brushing and clearing on roads specified herein, in compliance with the terms, specifications, conditions, and provisions of this solicitation.
Location and Description
The machine roadside clearing and brushing to be accomplished under this contract are located on the Missoula, Ninemile and Seeley Lake Ranger Districts, Lolo National Forest. The locations of the roads are shown on the attached maps. The roads will be staked using painted wood laths with the road and section number printed on them. Stakes will be placed at the beginning and end of each road segment.
Additional information such as maps, worklists, and clearing limits concerning the roads to be brushed is shown in the Exhibits of this solicitation. Further information can be obtained from Hardee Hackman at the Supervisors Office, Fort Missoula, Missoula, Mt. (406) 329-1036.
Site Visit
No site visit is planned for this project. For further information, please contact Hardee Hackman @ (406) 329-1036.
Motorized Equipment
(a) Use of motorized equipment other than hand-held equipment such as power saws and brush cutters will not be permitted off designated roads in the project area without approval of the Contracting Officer.
(b) Moving of support equipment and personnel shall be at the Contractor's expense. Transportation of the brush cutter between projects shall be at the Contractor's expense for all subitems being paid for by the mile. When working on an hourly basis, the Contractor shall be responsible for transporting the brush cutter and will be paid the hourly rate bid in the Schedule of Items to cover transportation costs.
Existing Facilities
In addition to the requirements of the Use of Premises Clause of this contract, all existing facilities such as signs, cattleguards, culverts, riprap protecting culvert inverts or fill slopes, and drainage structures damaged by the Contractor shall be replaced or repaired by the Contractor at no additional cost to the Government.
Pollution and Erosion Control
(a) The Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas, shall be collected and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved dumps or as approved by the Contracting Officer.
(b) The Contractor shall make every reasonable effort to direct surface runoff water to stabilized waterways and to keep the drainage systems functioning effectively to minimize soil erosion and water pollution.
Washing of Equipment
In an attempt to stop the spread of weeds, this work will require the Contractor to wash their equipment when specified by the Contracting Officer or designated representative. The equipment shall be washed with a pressure washer that is capable of producing enough water force to thoroughly remove all organic, mineral debris, and including excess grease from the machine. Before the equipment is moved to the jobsite, it shall be inspected and approved by the Contracting Officer or designated representative.
Signing and Public Safety
The Contractor shall exercise due caution and care when operating to prevent conflict with public users of the roads.
A reflectorized "Slow Moving" vehicle emblem shall be attached to mowing equipment.
The Contractor shall post warning signs with 12-inch by 12-inch flags on both ends of the section being worked to warn the road users of the work in progress. Signs shall be of size, number, and colors as required in Section 6B of the current edition of the "2001 Manual on Uniform Traffic Control Devices". Each sign shall have at least two flags. Signs shall be moved, as needed, so that a sign does not precede machinery by more than one (1) mile.
Loss, Damage, or Destruction
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.). Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.
End Product Description
Before and after finish brushing the roadway:
Shall be cut to the vertical and horizontal dimension shown on the Typical Clearing Detail.
Shall have all material cut of the proper diameter size requirement.
Shall have material cut to the proper height requirement.
Slash shall be scattered outside the Clearing Limits.
Material shall not be scattered into the stream or waterways.
Shall not have concentration of slash over 18 inches above the ground.
Shall have Traffic Control signing in place as stated in Quality Assurance Plan.
Signing shall meet the requirements of the Manual of Uniform Traffic Control Devices.
Shall have no damage to existing facilities.
It is industry practice to use machine-mounted (rotary or flail type mowers) brush cutters and hand labor to do this work. Subitems requiring hand brushing will be accomplished by use of chainsaws, pruners, loppers, etc. and all material to be removed will be cleanly severed.
(a) Description. Clearing and brushing shall consist of cutting and specified disposal of all vegetative material including, but not limited to, limbs, residual slash and brush, live roadside brush, and small trees which are within the designated clearing limits on both sides of roadway. The clearing limits shall be as shown in the Typical Clearing Details, Exhibit A.
Contractor’s Quality Control Plan
Contractor shall provide a Quality Control Plan that outlines a progress schedule and addresses all major points contained in the Quality Assurance Plan.
Quality Assurance Plan
See attached plan for full understanding of all tasks required and acceptable quality levels.
Method of Measurement
Road brush cutting will be measured to the nearest tenth of a mile along the centerline of the roadway, and shall include only those sections of the roads which are included in the contract and completed in accordance with the specifications. Measurement will be a Forest Service vehicle. The measuring device will be checked for accuracy and calibrated. Parking areas, turnouts, and approach road connections are considered as adjuncts to the main roads and shall not be measured separately. Mileage includes brush cutting both sides of the road.
Basis of Payment
(a) Roadside Brushing – Mile. Payment will be made for completed and accepted mileage to the nearest tenth of a mile.
(b) Miscellaneous Hourly Brushing – Actual Quantity. Payment by the hour will include a fully operated machine-mounted brush cutter and one hand laborer.
(c) Washing of Equipment. Payment will be made at the contract unit price for accepted work.
Additional Inspection and Acceptance Requirements
The Government will inspect each road within 2 working days after notification by the Contractor that the road is completed and ready for inspection.
(a) Unacceptable work shall be redone at the Contractor’s expense.
Contract Time - (a) Performance Period.
Item Number Approximate Starting Date Contract Time (Calendar Days)
| 1 | April 1, 2010 | 400-Calendar Days |
| 2 | April 1, 2010 | 400-Calendar Days |
| 3 | April 1, 2010 | 400-Calendar Days |
Contract time will run continuously. Although there is a long window of days to complete the item, it will be required of the Contractor to remain on the item once the work has been started.
If more than one item is awarded to one quoter, the time will run concurrently.
The Contractor shall maintain progress at a rate which will assure completion of work within the calendar time specified.
The Government may issue a Notice to Proceed as soon as weather and ground conditions are favorable for work. The count of contract time will start on the date specified on the Notice to Proceed.
(b) The Contractor shall furnish to the Government a work plan before the Notice to Proceed is issued. This work plan shall include at the minimum:
(1) Hours of day the Contractor intends to work.
(2) Days of week the Contractor intends to work.
(3) Schedule showing dates when brushing will begin and a listing of the sequence of roads to be accomplished.
(c) The Contractor shall complete all work behind gate closures by October 15th, unless otherwise agreed to in writing by the COR. The Contractor will be advised of any applicable closures at the Prework Meeting.
CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
Experience Questionnaire – 2 Pages
Wage Determination No. 76-1342, Rev. 39, dated June 9, 2009, 3 pages.
Quality Assurance Plan, 4 pages.
Listing of Exhibits
Exhibit A – Typical Clearing Details, 1 page
| Exhibit B – Worklists | |
| Item No. 1 -Missoula Ranger District, 1 page | |
| Item No. 2 -Ninemile Ranger District, 1 page | |
| Item No. 3 -Seeley Lake Ranger District, 1 page |
| Exhibit C – General Condition Description | |
| Item No. 1 -Missoula Ranger Districts, 1 page | |
| Item No. 2 -Ninemile Ranger District, 1 page | |
| Item No. 3 -Seeley Lake Ranger District, 1 page |
Maps – 16 pages total - each map is a separate document to this solicitation; and will be incorporated into any award for the item or items awarded.
USDA Forest Service
EXPERIENCE QUESTIONNAIRE
Instructions: See Box 11, Remarks, if extra space is needed to answer any item below, Mark “X: in appropriate boxes.
1. Contractor Name, Address, and Telephone Number
2. Submitted to (Office Name and Address)
3. Business [ ] Company [ ] Co-partnership [ ] Corporation [ ] Individual [ ] Non-profit Organization
4. How many years do you or your firm have in the line of work contemplated by this solicitation?
5. How many years experience have you or your business had as a (a) prime contractor ____ and/or (b) sub-contractor ____?
6. List below the projects your business has completed within the last three years:
Contract Amount Type of Project Date Completed Name, Address, and Telephone No. of Owner/Person to Contact for Project Information
7. List below all of your firm’s contractual commitments running concurrently with the work contemplated by this solicitation:
Contract Number Dollar Amt. of Award Name, Address, and Telephone No. of Business/Government Agency Involved Awarded (Units) Percent Completed Date Contract Complete
8a. Have you ever failed to complete any work awarded to you? [ ] Yes [ ] No 8b. Has work ever been completed by performance bond? [ ] Yes [ ] No 8c. Did you look at the project site(s) on-the-ground? [ ] Yes [ ] No 8d. If “Yes” to either item 8a. or 8b., specify location(s) and reason(s) why:
EXPERIENCE QUESTIONNAIRE CONTINUED
9. Employees and equipment that will be available for this project:
a. (1) Minimum number of employees: _____ and (2) Maximum number of employees: _____
b. Are employees regularly on your payroll: [ ] Yes [ ] No
c. Specify equipment available for this contract:______________________________________________________
d. Estimate rate of progress below (such as 2.0 acres/man/day):
(1) Minimum progress rate:________________ and (2) Maximum progress rate: _________________________
10. List below the experience of the principal individuals of your business. (Who will directly be involved in this contract?)
Individual’s Name Present Position Years of Experience Magnitude and Type of Work
11. Remarks -- Specify Box Numbers (Attach sheets if extra space is needed to fully answer any above question.):
NOTE: PLEASE PROVIDE ANY ADDITIONAL INFORMATION THAT WILL HELP EVALUATE YOUR ABILITY TO SUCCESSFULLY COMPLETE THIS PROJECT.
CERTIFICATION
I certify that all of the statements made by me are complete and correct to the best of my knowledge, and that any persons named as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.
12a. CERTIFYING OFFICIAL’S NAME AND TITLE
b. SIGNATURE (Sign in ink)
13. DATE
WD 76-1342 (Rev.-39) was first posted on www.wdol.gov on 06/02/2009 Forestry and Land Management Services
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON, D.C. 20210
Shirley F. Ebbesen Division of Wage | Wage Determination No: 1976-1342 Director Determinations | Revision No: 39 | Date Of Revision: 05/26/2009 State: Montana Area: Montana Statewide
**Fringe Benefits Required Follow the Occupational Listing**
Forestry Industry
OCCUPATION CODE - TITLE FOOTNOTE RATE
| 08010 - Brush/Precommercial Thinner | 13.07 | ||
| 08040 - Choker Setter | 15.89 | ||
| 08070 - Faller/Bucker | 17.59 | ||
| 08100 - Fire Lookout | 13.07 | ||
| 08130 - Forestry Equipment Operator | 16.44 |
08160 - Forestry/Logging Heavy Equipment Operator 18.44 08190 - Forestry Technician 18.44 08200 - Forestry Truck Driver 18.44
| 08250 - General Forestry Laborer | 12.26 | |
| 08280 - Nursery Specialist | 18.14 | |
| 08310 - Slash Piler/Burner | 13.07 | |
| 08340 - Tree Climber | 14.63 | |
| 08370 - Tree Planter | 12.70 | |
| 08400 - Tree Planter, Mechanical | 12.70 |
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $3.35 per hour or $134.00 per week or $580.66 per month
VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of "wash and wear" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.
** NOTES APPLYING TO THIS WAGE DETERMINATION **
Under the policy and guidance contained in All Agency Memorandum No. 159, the Wage and Hour Division does not recognize, for section 4(c) purposes, prospective wage rates and fringe benefit provisions that are effective only upon such contingencies as "approval of Wage and Hour, issuance of a wage determination, incorporation of the wage determination in the contract, adjusting the contract price, etc." (The relevant CBA section) in the collective bargaining agreement between (the parties) contains contingency language that Wage and Hour does not recognize as reflecting "arm's length negotiation" under section 4(c) of the Act and 29 C.F.R. 5.11(a) of the regulations. This wage determination therefore reflects the actual CBA wage rates and fringe benefits paid under the predecessor contract.
The duties of employees under job titles listed are those described in the "Service Contract Act Directory of Occupations", Fifth Edition, April 2006, unless otherwise indicated. Copies of the Directory are available on the Internet. A links to the Directory may be found on the WHD home page at http://www.dol.gov/esa/whd/ or through the Wage Determinations On-Line (WDOL) Web site at http://wdol.gov/.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE {Standard Form 1444 (SF 1444)}
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Doc5 EZ Rd Brushing Map12.pdf | ||
| Doc5 EZ Rd Brushing Map3.pdf | ||
| Doc5 EZ Rd Brushing Map2.pdf | ||
| Doc5 EZ Rd Brushing Map4.pdf | ||
| 68646368.pdf | ||
| Doc5 EZ Rd Brushing Map14.pdf | ||
| Doc5 EZ Rd Brushing Map9.pdf | ||
| Doc5 EZ Rd Brushing Map15.pdf | ||
| Doc5 EZ Rd Brushing Map8.pdf | ||
| Doc5 EZ Rd Brushing Map1.pdf | ||
| Doc5 EZ Rd Brushing Map16.pdf | ||
| Doc5 EZ Rd Brushing Map7.pdf | ||
| Doc5 EZ Rd Brushing Map6.pdf | ||
| Doc5 EZ Rd Brushing Map10.pdf | ||
| Doc5 EZ Rd Brushing Map13.pdf | ||
| Doc5 EZ Rd Brushing Map5.pdf | ||
| Doc5 EZ Rd Brushing Map11.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .