AMENDMENT TO PROVIDE ANSWERS TO SUBMITTED CONTRACTOR QUESTIONS

View the file

Other files for this federal contract opportunity

Other files attached to STOCK TANK CLEANING/MTCE, newest first.
File Type Posted
S-16-0008_AMEND_003.pdf PDF
AMENDMENT_002_AG-8180-S-16-0008.pdf PDF
S-16-0008_Amd_000001.pdf PDF
S-16-0008_STOCK_TANK_MTCE.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-8180-S-16-0008

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PHOENIX AZ 85006

2324 E MCDOWELL ROAD

TONTO NATIONAL FOREST

06/28/2016000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/24/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SOLICITATION AG-8180-S-16-0008 STOCK TANK CLEANING PROJECT is amended to provide Project Q

& A.

Period of Performance: 07/15/2016 to 09/30/2016

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KELLY HULL

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

AG-8180-S-16-0008

Stock Tank Cleaning Q & A’s

1. Is a Tribal Permit required to on stock take locations?

A: NO

2. If so, are taxes paid to the corresponding reservation.

A: NA

3. How much earth/sediment is being removed per tank? (Example Forked Ridge Tank measures 107’ x 110’ x 12” deep (my random number for earth moving) this come out to 435.93 CU YD of Sediment/Dirt, at $75.00 a CU YD. = $32,700.00 just for one tank)

A: THIS WILL VARY AMONG TANKS. IT IS ESTIMATED THAT TANKS WILL NEED 4-12’ OF SEDIMENT

REMOVED FROM THE BOTTOM OF THE TANKS. YOUR ESTIMATE OF 435 CU YDS MAY BE

APPROPRIATE, BUT POTENTIALLY HIGH OR LOW DEPENDING ON HOW MUCH SEDIMENT NEEDS

TO BE REMOVED. IT IMPOSSIBLE TO KNOW HOW MUCH WILL NEED TO BE REMOVED AS THE

DEPTHS OF THE TANKS ARE UNKNOWN.

4. Tank 1, will need to be cleared of trees, brush, debris, is it to be piled on site?

A: YES, PILED OR SCATTERED ADJACENT TO THE TANK

5. Do we have to re-seed tire tracks from backhoe, trucks and trailers?

A: NO

6. Some ponds have no roads and require 4x4, is vegetative damage excluded?

A: MINIMUM VEGETATIVE DAMAGE IS AUTHORIZED TO ALLOW ONE-TIME ACCESS TO THE

PROJECT LOCATION. NO DAMAGE TO SAGUAROS IS AUTHORIZED

7. Is an archeologist provide at no charge per site?

A: AN ARCHEOLOGIST WILL NOT BE REQUIRED FOR THE TANK CLEANING

8. Ponds that have water, and are calculated as line item #3, are we to pull fill dirt from further areas, beyond scope of listed measurements?

A: NO

9. At what average height do you want each pond, for material calculations?

A: IF YOU ARE REFERRING TO THE DAM, THE HEIGHT MAY VARY DEPENDING ON THE AMOUNT

OF MATERIAL REMOVED. THERE IS NOT A MINIMUM OR MAXIMUM HEIGHT REQUIRED. IF YOU

ARE REFERRING TO SOMETHING ELSE, YOU WILL NEED TO CLARIFY.

AG-8180-P-16-0008 AMEND 002 STOCK TANK MAINTENANCE 2 of 4

10. No compaction is noted in plans, I am assuming, fill will be placed and bucket pressed?

A: YES, PRESSED/TAMPED BACK TO EARTH WITH HEAVY EQUIPMENT

11. There is no mention of water settling, is this correct?

A: YES

12. There is no erosion control, rip rap, filter fabric to be used at overflows?

A: NO

13. What if Caliche, Hard Pan or Boulders are encountered, is this a separate pay item, /change order?

A: NO AS IT IS NOT ANTICIPATED. THESE ARE PRE-EXISTING TANKS SO NONE OF THOSE ITEMS

SHOULD BE ENCOUNTERED

14. Is relocation, boxing out, transplanting or damage to native cacti, accents excluded?

A: NOT AUTHORIZED

15. Are protective measures required for tree, shrubs, cacti’s, or animals excluded or required?

A: NO- EXCEPT FOR SAGUARO CACTUS IF PRESENT.

16. Who will certify/approve (with no delay of time and work) notice to proceed on all ponds, if all above.

A: THE CONTRACTING OFFICER IS THE ONLY PERSON THAT CAN APPROVE TIME AND MONEY

AND WILL BE ISSUING THE NOTICE TO PROCEED.

17. How much debris is to be excavated/removed/pulled-out of the tanks?

Equipment-type is stated, not how much debris.

A: ASIDE FROM SAND AND SILT THAT HAS WASHED IN THE TANKS AND CAUSED A NEED FOR

CLEANING, MANY OF THE TANKS HAVE FILLED WITH VEGETATION. MOST OF THE VEGETATION

ARE WEEDS / ANNUALS PLANTS THAT WILL COME OUT WITH THE REMOVAL OF THE MATERIAL.

THERE MAY BE A FEW WOODY TREES/SHRUBS THAT HAVE BECOME ESTABLISHED IN THE TANKS

(EX. HUMBOLT TANK). THESE WILL NEED TO BE REMOVED AND THEN PILED / SCATTERED

ADJACENT TO THE PROJECT AREA

18. How does the contractor access the water tanks?

A: TANKS MAY BE ACCESSES VIA FOREST SERVICE ROADS OR AUTHORIZED OFF ROAD TRAVEL

VIA THE PRE-EXISTING CAT TRACK THAT WAS USE TO PREVIOUS CLEAN/BUILD TANK

AG-8180-P-16-0008 AMEND 002 STOCK TANK MAINTENANCE 3 of 4

19. Are the tanks accessible by road?

A: SEE RESPONSE TO # 18

20. RFQ indicates some tanks have no access – how will access be determined?

A: SEE RESPONSE TO #18

21. Will the contractor be responsible for developing a temp-road? How is this to be priced?

A: NO, THERE IS NO IMPROVING OF ACCESS TO THE TANK OTHER THAN MINOR VEGETATIVE

REMOVAL OR AN OCCASIONAL BOULDER.

22. Does the Contractor need to build a road to access the Magazine tank?

A: NO. SEE RESPONSE TO #18 AND 21

23. The North Deer Flat tank still has water in it. Is the Contractor supposed to drain the tank?

A: IF THERE IS WATER IN THE TANK WHEN THE CONTRACTOR PLANS ON CLEANING TANK, THEY

WOULD NEED TO DRAIN IT OR WAIT UNTIL IT IS DRY PRIOR TO CLEANING.

24. Where does the Contractor access the Skunk and Round-Up tanks? (couldn’t find an access to look at the tanks)

A: THE PRE-EXISTING CAT TRACK/TRAIL THAT WAS ORIGINALLY USED WILL NEED TO BE

LOCATED. IT IS UNABLE TO BE LOCATED, THE FOREST SERVICE WILL CLEAR A NEW ROUTE (OFF-

ROAD) TO THE TANKS

25. Is the Contractor responsible for a “accidental” fire (ie: if the dozer tracks hit something and sparks?)

A: YES

26. First picture has a lot of debris and vegetation that will need to be excavated – is the contractor responsible for hauling away the vegetation or will it be placed on Forest land?

A: SEE RESPONSE #4