Amendment_1_S-17-0029.pdf
PDF 312 KB Posted
- Attached to
- MASTICATION - OXBOW & ROUND VALLEY Federal contract opportunity
- Solicitation number
- AG-8173-S-17-0029
About this file
AMENDMENT 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REVISION_2_RETURN_PACKET_S-17-0029.pdf | ||
| Amendment_2_S-17-0029.pdf | ||
| Oxbow_mastication-470acres_Forestmap.pdf | ||
| Oxbow_mastication-470acres_topo.pdf | ||
| REVISED_RETURN_PACKET_S-17-0029.pdf | ||
| RETURN_PACKET_S-17-0029.pdf | ||
| S-17-0029_Oxbow_-_Round_Valley_Mastication.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
AMENDMENT N0. 1 04/28/17
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
APACHE-SITGREAVES NATIONAL FORESTS
30 S. CHIRICAHUA DR. PO BOX 640
SPRINGERVILLE, AZ 85938
Same as Item 6.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-8173-S-17-0029
9B. DATED (SEE ITEM 11)
04/25/17
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Solicitation AG-8173-S-17-0029 Oxbow & Round Valley Mastication:
I. The Closing Date remains the same, May 24, 2017, 4:00 pm.
II. Revised the Schedule of Items and Maps for a reduction in acres for Oxbow portion; Revise Section F page is replaced. New Maps for Oxbow are attached electronically. The Return Packet is replaced.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
WARREN ABBOTT, Contracting Officer
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
/s/ Warren Abbott 5/02/17
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
reduced by 6 percent. No payment will be made if results are less than 80%. Payment, less deduction for lost or damaged Government-furnished property, will be made for completed bid items, or sub-items of work at the unit contract price where ever the quality of thinning is 90 percent or above, based on inspections as outlined above.
E.3.6. Re-inspection Upon Contractor’s Request
If the original inspection results are unacceptable to the Contractor on either a completed or partially completed unit, re-inspection will be completed upon written request. The same inspection procedures will be used, but different plots will be measured. If the re-inspection confirms the original inspection is not meeting standards, the Contractor will reimburse the Government for the cost of the re-inspection. If the work meets acceptable standards, the Government assumes the cost of re-inspection and payments will be based on the results of the re-inspection.
E.3.7. Acceptance
Non-compliance with any specification or work standards will classify the treatment as unsatisfactory and re-work will be required to bring the treatment up to specifications and work standards. Government inspection alone does not imply acceptance. Acceptance will be based upon the satisfactory completion of all contract specifications. Payment will be processed promptly following acceptance of completed units.
SECTION F--DELIVERIES OR PERFORMANCE (REVISED)
F1.0 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfagara.htm
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
F2.0 FAR 52.242-15 Stop Work Order (AUG 1989)
F3.0 PERIOD OF PERFORMANCE
The Contractor shall maintain progress at a rate that will assure completion within the performance period. The minimum acceptable rate of progress will be calculated by dividing the total units of work for each item by performance time specified.
F.2.2. Contract Time
The Contractor shall start work promptly after receipt of a Notice to Proceed. The Contractor shall maintain progress at a rate that will assure completion within the stated contract time. The contract time allotted includes periods for timing restrictions.
CONTRACT Estimated Beginning Date Program Size Contract Time
ALL LINE
ITEMS
10 DAYS AFTER AWARD,
WEATHER PERMITTING
SEE SCHEDULE OF ITEMS 180 CALENDARS FROM NTP
The Government will issue a Notice to Proceed as soon as weather and ground conditions are favorable for work on one or more of the areas.
F.2.3 Suspension of Work by the Government
Work may be suspended by the Government for the following conditions:
http://farsite.hill.af.mil/ http://farsite.hill.af.mil/vfagara.htm
File details come from the government source that posted it. Updated .