Exhibit_3_Drawings_and_Specifications.pdf
PDF 1 MB Posted
- Attached to
- Vault Toilet Repairs Federal contract opportunity
- Solicitation number
- AG-8173-S-15-0023
About this file
Exhibit 3 - Drawings and Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S-15-0023_Amendment_1.pdf | ||
| RETURN_PACKET_S-15-0023.pdf | ||
| Revised_S-15-0023_Vault_Toilet_Repairs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SOUTHWEST REGION 3
APACHE-SITGREAVES NATIONAL FORESTS
ENGINEERING DIVISION
SHEET TITLE
TITLE SHEET
SCALE
Not To Scale
SHEET
OF
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SOUTHWEST REGION 3
APACHE-SITGREAVES NATIONAL FORESTS
SUBMITTED BY:
PROJECT ENGINEER
REVIEWED BY:
REVIEWED BY:
DATE
DISTRICT RANGER DATE
INFRASTRUCTURE AND OPS
DATE
APPROVED BY:
FOREST SUPERVISOR DATE
APPROVED BY:
FOREST ENGINEER DATE
DRAWING SHEET INDEX
TITLE SHEET
DESCRIPTION OF WORK
MULTIPLE TOILETS REQUIRE VARIOUS REPAIRS,
INCLUDING CONCRETE SIDEWALKS, VAULT LINER
RE-ATTACHMENT, DOOR HARDWARE AND SOFFIT
REPAIRS, VENT STACK REPAIRS AND REPAINTING,
AND CONCRETE GAP AND CRACK SEALING.
STATE VICINITY MAP
RANGER DISTRICT PROJECT VICINITY MAP
SEE DRAWINGS FOR EACH TOILET
LOCATION
LARSON RIDGE TOILET R530
PROJECT LOCATION
BLYTHE
YUMA
KINGMAN
ROOSEVELT
NOGALES
TUCSON
GRANDE
CASA
PHOENIX
MESA
ALPINE
SAFFORD
GLOBE
TUBA CITY
PAYSON
FLAGSTAFF
CANYON
GRAND
SPRINGERVILLE
SHOWLOW
HEBER
CHINLE
PAGE
SST TOILET REPAIRS
CLIFTON
BLACK MESA & ALPINE
RANGER DISTRICTS
WILLIAMS VALLEY & TOBBOGAN REPAIRS
KP CIENEGA CAMPGROUND R135
DRAIN, CHANNEL, AND DOOR DETAILS5
CONCRETE AND LINER REPAIR DETAILS6
SLOPE PIPE MINIMUM
1% TO DAYLIGHT
REPLACE ALL SIDEWALK WITH
A SLOPE OF 2% AWAY FROM
THE TOILET; ALL SIDES.
NEW SIDEWALK PLACED AND
DOWELED INTO EXISTING
FLOOR SLAB PER DETAILS 1B,
3B, 4B, AND 5B, SHEET 6 OF 6
4" PVC PIPE; SLOPE
AND DAYLIGHT ON
DOWNHILL SLOPE
4" PERFORATED PIPE;
PERFORATIONS FACING
DOWNWARD
VENT STACKS
INSTALL TAR PAPER
BETWEEN NEW SIDEWALK
AND SST WALL; ALL SIDES
CONCRETE ON VENT STACK
SIDE TO REMAIN
WASHED GRAVEL
FRENCH DRAIN WITH LOCATIONS
AS SHOWN, PER DETAILS 4A AND 5A,
SHEET 5 OF 6.
WOMEN'S SIDE
MEN'S SIDE
DEMO AND REMOVE 5'
HIGH SCREEN WALL;
BOTH SIDES
REMOVE SIDEWALK
ANGULAR ROCK;
6-8" DIAMETER
SHEET NOTES
SCALE (1" = 5')
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E L A
R
SO
N R
ID
G
E T
O
IL
E T
R
B L A
C K
M E
SA
R A
N G
E R
D
IS
T R
IC
T
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
SS
T
T O
IL
E T
R E P A
IR
S
Sheet 2
IN
IT
IA
L S
1. TOILET SHALL BE PUMPED
PRIOR TO THE START OF THE
WORK. INSPECT WOMEN'S VAULT
LINER FOR PROBLEMS.
2. REPAIR MEN'S VAULT LINER PER
DETAIL 2B, SHEET 6 OF 6. INSPECT
WOMEN'S VAULT LINER AND
INFORM CONTRACTING OFFICER
IF ANY ISSUES EXIST.
3. REPLACE DOOR HARDWARE PER
DETAIL 4A, SHEET 5 OF 6, ON
BOTH WOMEN'S AND MEN'S
DOORS.
4. CONCRETE SHALL BE 4000 PSI,
1.5 POUNDS FIBER MESH PER
CUBIC YARD, WITH 4-6% AIR.
PROVIDE MEDIUM-BROOM
FINISH.
5. CONTROL JOINTS SHALL BE
INSTALLED AS SOON AS
EQUIPMENT CAN BE SUPPORTED
AND BEFORE UNCONTROLLED
CRACKING OCCURS. DO NOT
RAVEL THE JOINTS WHILE
SAWING. REMOVE AND REPLACE
NEWLY-PLACED CONCRETE
WHERE UNCONTROLLED
CRACKING OCCURS. DO NOT SAW
A JOINT IF A CRACK OCCURS AT
OR NEAR THE JOINT LOCATION
BEFORE SAWING. DISCONTINUE
SAWING WHEN A CRACK
DEVELOPS AHEAD OF THE SAW.
6. DISPOSE ALL MATERIAL OFFSITE
PER LOCAL, STATE, AND FEDERAL
CODES AND REGULATIONS.
5' 10'0' 2.5'
VICINITY MAP
APS MAIN POWERLINE
N
FSR
AZ260
N
FS
R
CANYON PT.
CAMPGROUND
PROJECT
LOCATION
N
N
S E
W
PICTURE SHOWING EXISTING CONDITIONS AND
SIDEWALK
PICTURE SHOWING EXISTING CONDITIONS
EXISTING TOPOGRAPHY
FLOWING TOWARDS BUILDING
DEMO AND REMOVE ALL SIDEWALK
VENT STACKS
CONCRETE ON VENT STACK
SIDE TO REMAIN
WOMEN'S SIDE
MEN'S SIDE
DEMO AND REMOVE 5'
MASONRY SCREEN WALLS
ON BOTH SIDES; 22 LF TOTAL
REMOVE ALL BRUSH AT ISLAND.
SEED DISTURBED AREAS. SEED AVAILABLE
FROM ALPINE DISTRICT RANGE STAFF.
DEMO AND REMOVE SIDEWALK.
PLACE NEW SIDEWALK ON
SAME FOOTPRINT
DEMO AND REMOVE SIDEWALK
NEW CHANNEL; REMOVE 2-3 4" DIA.
ASPEN TREES FROM FOOTPRINT;
REFER TO DETAIL 3A, SHEET 5 OF 6.
SEED DISTURBED AREAS.
INSTALL TAR PAPER
BETWEEN NEW SIDEWALK
AND SST WALL; ALL SIDES
REPLACE ALL SIDEWALK WITH
A SLOPE OF 2% AWAY FROM
THE TOILET; ALL SIDES. REGRADE
AS NECESSARY FOR SIDEWALK TO
BE FLUSH AGAINST BUILDING.
DOWEL INTO EXISTING
FLOOR SLAB AND
PLACE SIDEWALK PER DETAILS 1B,
3B, 4B, AND 5B, SHEET 6 OF 6
SHEET NOTES
SCALE (1" = 5')
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E K
P C
IE
N
E G
A C
A M
P G
R O
U N
D R
A
L P
IN
E R
A N
G E R
D
IS
T R
IC
T
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
SS
T
T O
IL
E T
R E P A
IR
S
Sheet 3
IN
IT
IA
L S
1. TOILET SHALL BE PUMPED
PRIOR TO THE START OF THE
WORK.
2. REPLACE BOTH 12" VENT STACK
SEALS FOR VENT PENETRATIONS
WITH RUBBER ROOF JACKS. SEAL
COMPLETELY. REPAINT VENT
STACKS IN FLAT BLACK. INSTALL
DOOR STOPS AT EACH DOOR.
3. REPLACE ROTTING WOOD AT
SOFFIT. EXISTING IS 2"X6"
TONGUE AND GROOVE. APPLY
CLEAR STAIN FINISH TO REPAIR.
4. CONCRETE SHALL BE 4000 PSI,
1.5 POUNDS FIBER MESH PER
CUBIC YARD, WITH 4-6% AIR.
PROVIDE MEDIUM-BROOM
FINISH.
5. CONTROL JOINTS SHALL BE
INSTALLED AS SOON AS
EQUIPMENT CAN BE SUPPORTED
AND BEFORE UNCONTROLLED
CRACKING OCCURS. DO NOT
RAVEL THE JOINTS WHILE
SAWING. REMOVE AND REPLACE
NEWLY-PLACED CONCRETE
WHERE UNCONTROLLED
CRACKING OCCURS. DO NOT SAW
A JOINT IF A CRACK OCCURS AT
OR NEAR THE JOINT LOCATION
BEFORE SAWING. DISCONTINUE
SAWING WHEN A CRACK
DEVELOPS AHEAD OF THE SAW.
6. DISPOSE ALL MATERIAL OFFSITE
PER LOCAL, STATE, AND FEDERAL
CODES AND REGULATIONS.
5' 10'0' 2.5'
VICINITY MAP
U S1
KP CIENEGA
CAMPGROUND
PROJECT
LOCATION
N
N S
E
W
TO ALPINE
NFSR 25
NFSR 54
1.4 MI
PICTURE SHOWING EXISTING CONDITIONS AND
SIDEWALK
PICTURE SHOWING FAILED VENT STACK FLASHING
SEALS
N
FS
R
SHEET NOTES
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E W
IL
L
IA
M S
V A
L L E Y
T
O B
B O
G A
N R
E P A
IR
S
A L P
IN
E R
A N
G E R
D
IS
T R
IC
T
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
SS
T
T O
IL
E T
R E P A
IR
S
Sheet 4
IN
IT
IA
L S
1. DISPOSE ALL MATERIAL OFFSITE
PER LOCAL, STATE, AND FEDERAL
CODES AND REGULATIONS.
2. PUMP BOTH VAULTS AT EACH
TOILET.
VICINITY MAP
FR
2.8 MI
R157 PROJECT
LOCATION
N
FR249
FR
U S1
R146 PROJECT
LOCATION
1.8 MI
ALPINE
REPLACE ROTTING WOOD AT SOFFIT. EXISTING IS
2"X6" TONGUE AND GROOVE. APPLY CLEAR STAIN
FINISH TO REPAIR. RE-SEAL VENT STACK
PENETRATIONS.
GAP SEAL 16 LF AT MEN'S AND WOMEN'S
ENTRANCE. CLEAN OUT GAP. INSTALL FOAM
BACKER ROD AND POLYURETHANE
SELF-LEVELING SEALANT. INSTALL DOOR STOPS
AT BOTH DOORS. FASTEN TO CONCRETE PER
MANUFACTURER'S INSTRUCTIONS.
R157 TOILET AT
TOBBAGON
HILL
CRACK SEAL AROUND BOTH VAULT COVERS,
APPROXIMATELY 14 LF TOTAL
REPAIR / BONDO BULLET HOLES ON VENT
STACKS. REPAINT ENTIRE VENT STACKS WITH
FLAT BLACK. VERIFY PENETRATION SEALS. RESEAL
IF NEEDED.
GAP SEAL 16 LF AT MEN'S AND WOMEN'S
ENTRANCE. CLEAN OUT GAP. INSTALL FOAM
BACKER ROD AND POLYURETHANE
SELF-LEVELING SEALANT. INSTALL DOOR STOPS
AT BOTH DOORS. FASTEN TO CONCRETE PER
MANUFACTURER'S INSTRUCTIONS.
R146 TOILET AT
WILLIAMS
VALLEY
CRACK SEAL AROUND BOTH VAULT COVERS,
APPROXIMATELY 14 LF TOTAL
REPAIR / BONDO BULLET HOLES ON VENT
STACKS. REPAINT ENTIRE VENT STACKS WITH
FLAT BLACK. VERIFY PENETRATION SEALS. RESEAL
IF NEEDED.
REPAINT EXTERIOR OF BOTH METAL DOORS.
MATCH ROOF.
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
Sheet 5
IN
IT
IA
L S
SS
T
T O
IL
E T
R E P A
IR
S
D R
A
IN
C
H A
N N
E L A
N D
D O
O R
D E T
A
IL
S
EXISTING SLAB
EXISTING
GRADE
12"
FILTER FABRIC; LINE
ENTIRE TRENCH PERIMETER;
EXTEND INTO EXISTING GRADE
4" TO 11
2" WASHED GRAVEL;
CLEAN (< 5% FINES)
EXISTING SST
CMU WALL
4"-6"
24"
GRADE SLOPE TO
CATCH WATER
PLACE TOP SOIL TO
4" DEPTH
95% COMPACTED ABC;
4" MINUS
4"
EXISTING
GRADE
SLOPE 2% MINIMUM
12"
FILTER FABRIC; LINE
ENTIRE TRENCH PERIMETER
4" TO 11
2" WASHED GRAVEL;
CLEAN (< 5% FINES)
EXISTING SST
CMU WALL
24" #4 DEFORMED STEEL
TIE BAR; DRILLED AND EPOXY
GROUTED 6" MINIMUM INTO EXISTING
FLOOR SLAB; 18" SPACING ON CENTER
4"-6"
24"
GRADE SLOPE TO
CATCH WATER
FRENCH DRAIN @ EXISTING SLAB
NO SCALE
DETAIL 1A
FRENCH DRAIN UNDER NEW SIDEWALK
NO SCALE
DETAIL 2ACROSS SECTION CROSS SECTION
4" CONCRETE SIDEWALK,
REINFORCEMENT &
TURNDOWN SEE DETAIL
XX ON SHEET XX OF XX
DETAIL 4A
DOOR HARDWARE
NO SCALE
DOOR HARDWARE
FROM THE
OUTSIDE. NEW
DEADBOLT WITH
USFS SUPPLIED
KEYED CYLINDER,
PUSH PLATE, AND
STEEL DOOR
HANDLE. CENTER
HANDLE 36" FROM
BOTTOM.
DOOR HARDWARE
FROM THE INSIDE.
NEW BLANK ON THE
DEADBOLT, PUSH PLATE,
SLIDE BOLT ASSEMBLY,
AND DOOR HANDLE
CENTERED 36" FROM BOTTOM.
EXISTING PUSH PLATE MAY BE USED.
EXISTING SLAB
EXISTING
GRADE
EXISTING SST
CMU WALL
SLOPE CHANNEL
NO SCALE
DETAIL 3A CROSS SECTION
36"
12" MIN.
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E
C O
N C
R E T
E A
N D
L
IN
E R
R E P A
IR
D
E T
A
IL
S
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
Sheet 6
IN
IT
IA
L S
DETAIL 1B
FAILED LINER
(LOCATION VARIES)
REPOSITION LINER
AGAINST VAULT WALLS
AT ALL CAVED IN SECTIONS.
LINER
CONCRETE
VAULT
FLOOR
SLAB
VENT STACK
RE-FASTEN LINER WITH 3
8" X 23 4"
EXPANSION BOLT ANCHORS WITH
WASHER SPACED 6" FROM ALL CORNERS
AND 20" O.C. MINIMUM EVENLY SPACED.
BOTH SHALL BE STAINLESS STEEL. BOLT
THROUGH A 1" X 3" COMPOSITE MATERIAL
EQUAL TO TREX, TO PROVIDE AN AIR AND
WATER-TIGHT SEAL.
DETAIL 2B
VAULT LINER REPAIR
NO SCALE
CMU WALL RISER
5'-2"
6'-0"
SS
T
T O
IL
E T
R E P A
IR
S
DETAIL 3B
SIDEWALK
NO SCALE
8" 8"4" 4"3'
#3 REBAR; 18"
O.C. EACH WAY
4" MINUS 95%
COMPACTED ABC
5'
CROSS SECTION
4"
4"
4"
8" 4"
4"
#3 REBAR; 18"
O.C. EACH WAY#3 REBAR
4" TOOLED
RADIUS EDGE
(TYPICAL)
COMPACTED BACKFILL
SLOPED 3H:1V AWAY
FROM CONCRETE
3"
4" CONCRETE PAD OR
SIDEWALK TURNDOWN
NO SCALE
DETAIL 4B
4" MINUS 95%
COMPACTED ABC
CROSS SECTION
CONCRETE CONTROL JOINT
NO SCALE
DETAIL 5B
FOR 4" CONCRETE, INSTALL CONTROL JOINTS EVERY 5' O.C.
FOR 6-9" CONCRETE, INSTALL CONTROL JOINTS EVERY 10' O.C.
JOINT DEPTH (IN.) = CONCRETE DEPTH (IN.) / 3
CONCRETE DEPTH
JOINT DEPTH
TOOLED OR SAWCUT
CONTROL JOINT WITH
4" RADIUS EDGE
CROSS SECTION
CONCRETE REPAIR
NO SCALE
DEPTH
SAWCUT AND REMOVE
SECTION AS MARKED
24" #4 DEFORMED STEEL
TIE BAR; DRILL AND EPOXY
GROUT INTO EXISTING
CONCRETE ROADWAY 18"
ON CENTER
6" MIN.
DEPTH/2
TOOLED OR SAWCUT
CONTROL JOINT WITH
4" RADIUS EDGE
CROSS SECTION
File details come from the government source that posted it. Updated .