General Decision Number_AZ080014_Hwy_Apache_JUL32009.doc
DOC document 33 KB Posted
- Attached to
- Fence Construction, Maintenance, and Repair Federal contract opportunity
- Solicitation number
- AG-8173-S-09-0018
About this file
EXHIBIT 1 APACHE CTY WAGE DETERMINATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J._fence_diagrams.pdf | ||
| ReturnPackage_FENCE_IDIQ2009.doc | DOC document | |
| General Decision Number_AZ080013_Hwy_Coconino_JUL32009.doc | DOC document | |
| RFP_Apache_SitgreavesNF_Fence_ IDIQ2009.doc | DOC document | |
| SF30_Amendment_No1_Fence_IDIQ2009.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: AZ080014 07/03/2009 AZ14
State: Arizona
Construction Type: Highway
Counties: Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo and Santa Cruz Counties in Arizona.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date
0 05/15/2009
1 06/26/2009
2 07/03/2009
* CARP0408-007 07/01/2009
APACHE, COCHISE & SANTA CRUZ COUNTIES
Rates Fringes
CARPENTER (Including Cement
Form Work).......................$ 23.58 7.24
ENGI0428-004 06/01/2009
Rates Fringes
POWER EQUIPMENT OPERATOR
Oiler Driver................$ 24.16 9.31
SUAZ2009-002 04/23/2009
Rates Fringes
CARPENTER
Gila, Graham, Greenlee, La
Paz & Navajo................$ 21.71 3.82
CEMENT MASON.....................$ 17.74 3.59
ELECTRICIAN......................$ 24.43 5.38
IRONWORKER, Rebar................$ 21.36 9.83
LABORER
Asphalt Raker...............$ 14.97 5.88
Concrete Worker.............$ 13.38 4.50
Fence Builder...............$ 12.20 3.84
Flagger.....................$ 12.31 3.96
General/Cleanup.............$ 12.78 2.50
Guard Rail Installer........$ 12.20 3.84
Landscape Laborer...........$ 11.02
Water Blaster...............$ 14.90 2.90
PAINTER..........................$ 13.94 2.56
POWER EQUIPMENT OPERATOR
Backhoe < 1 cu yd...........$ 17.76 3.89
Compactor Self Propelled
(with blade-grade operation.$ 22.53 6.57
Compactor Small Self
Propelled (with blade-backfill, ditch operation)..$ 22.29 6.31
Concrete Pump...............$ 20.31 6.48
Crane (under 15 tons).......$ 22.98 4.26
Drilling Machine
(including wells)...........$ 21.79 4.10
Grade Checker...............$ 23.41 6.54
Hydrographic Seeder.........$ 19.73 5.40
Mass Excavator..............$ 23.33 6.98
Milling Machine/Rotomill....$ 21.87 6.84
Power Sweeper...............$ 19.33 4.85
Roller (all types asphalt)..$ 17.46 5.58
Roller (excluding asphalt)..$ 19.23 5.09
Scraper (pneumatic tire)....$ 22.41 6.90
Screed......................$ 20.90 6.72
Skip Loader (all types 3 <
6 cu yd)....................$ 20.91 7.35
Skip Loader (all types 6 <
10 cu yd)...................$ 22.24 6.83
Skip Loader < 3 cu yd.......$ 17.97 6.60
Tractor (dozer, pusher-all)........................$ 22.53 6.47
Tractor (wheel type)........$ 24.62 7.57
TRUCK DRIVER
2 or 3 axle Dump or
Flatrack....................$ 16.17 4.24
Oil Tanker Bootman..........$ 21.94
Pickup......................$ 12.88 1.73
Water Truck < 2500 gal......$ 19.59 5.90
Water Truck > 3900 gal......$ 18.70 4.79
Water Truck 2500 < 3900 gal.........................$ 17.13
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, projectdescription, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .