Roof_Plans.pdf
PDF 824 KB Posted
- Attached to
- Henry Koen Building Roof Replacement Federal contract opportunity
- Solicitation number
- AG-7J18-S-17-0005
About this file
Plans & Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Koen_Building_Roof_Supplemental_Information_16Jun17.pdf | ||
| Koen_Building_Roof_Supplemental_Drawings_16Jun17.pdf | ||
| Koen_Building_Roof_Specifications_12May17.pdf | ||
| OSF_Roof_Report.pdf | ||
| Solicitation___AG-7J18-S-17-0005.pdf | ||
| DBWD_AR209.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet Title
D E
S C
R I P
T I O
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
P A
B L O
C
R U
Z
R
E G
I O
N A
L
E
N G
I N
E E
R
W e s t
M a i n
S t r e e t
R u s s e l l v i l l e
A
R
C0.0
COVER SHEET
Project
Number
CDS
TBD
N ew
R oo f fo r th e
H en ry K oe n
Fe de ra l B ui ld in g
New Roof for the
Henry Koen Federal Building 605 West Main Street
Russellville, Arkansas 72801
ISSUED FOR BID
12 May 2017
DRAWING INDEX
M a y
I s s u e
I s s u e
I s s u e
I s s u e
General
C-0.0 COVER SHEET X
SHEET # DRAWING TITLE
GENERAL NOTES
ABBREVIATIONS
1. THESE DRAWINGS ARE THE PROPERTY OF THE USDA FOREST SERVICE, AND SHALL NOT BE REPRODUCED OR COPIED IN
WHOLE OR IN PART WITHOUT WRITTEN CONSENT THESE DRAWINGS ARE TO BE USED FOR THE PROJECT AND SITE
SPECIFICALLY IDENTIFIED HEREIN AND SHALL NOT TO BE USED ON ANY OTHER PROJECT. THESE DRAWINGS ARE A
COMPOSITE SET AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GENERAL CONTRACTOR (GC) SHALL REVIEW ALL
DRAWINGS AND DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK TO BE PERFORMED PRIOR TO
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR) PROMPTLY OF ANY ERRORS, OMISSION, INCONSISTENCIES, DISCREPANCIES, AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND WITH FIELD CONDITIONS. DO NOT PROCEED
WITH WORK UNTIL DISCREPANCIES ARE RESOLVED TO THE SATISFACTION OF ALL PARTIES.
4. DUE TO REPRODUCTION INCONSISTENCIES, DRAWING SCALES MAY NOT BE ACCURATE. DO NOT SCALE ANY DRAWINGS.
REQUEST ANY MISSING DIMENSIONS FROM THE CONTRACTING OFFICER'S REPRESENTATIVE.
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE
REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO
SPECIFIC REGULATIONS AS MANDATED BY THE GOVERNMENT, THE CONTRACTING OFFICER'S REPRESENTATIVE, AND THE
AUTHORITIES HAVING JURISDICTION. IT IS THE GC'S RESPONSIBILITY TO ENSURE THE PROCUREMENT OF REQUIRED AND
NECESSARY PERMITS AND APPROVALS PRIOR TO THE COMMENCEMENT OF ANY WORK, AND CERTIFICATE OF OCCUPANCY
UPON COMPLETION OF PROJECT. THE GC IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS
AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE GOVERNMENT.
6. THE GC SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF OF EXISTING TENANTS and/OR BUILDING
OPERATIONS. THE GC SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND
EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN
CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
7. THE GC SHALL SUBMIT A SCHEDULE FOR CONSTRUCTION TO THE GOVERNMENT AND THE COR PRIOR TO PROCEEDING
WITH ANY WORK. REQUIRED DATES FOR SUBMITTALS SHALL BE INCLUDED WITH THE CONSTRUCTION SCHEDULE. THE COR
MAY REQUIRE UP TO 10 BUSINESS DAYS TO PROCESS SUBMITTALS.
8. THE GC SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE DAILY.
9. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE COR IN WRITING AND WILL BE
CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE GOVERNMENT WITH
RESPECT TO DELIVERY DATE, QUALITY OR COST.
10.THE COR HAS NOT CONDUCTED ANY INVESTIGATION FOR ASBESTOS OR OTHER HAZARDOUS SUBSTANCES ON THE
PROJECT SITE AND ASSUMES NO RESPONSIBILITY WITH RESPECT TO SAME.
11.THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY
OF THE GC. THE COR DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR FOR
TEMPORARY STRUCTURES.
12.DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GC. THE CONTRACTOR SHALL EMPLOY
ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
13.JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GC. THE GC SHALL CONSULT WITH LOCAL FIRE
AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GC IS
SOLELY RESPONSIBLE FOR MEETING OSHA REGULATIONS DURING CONSTRUCTION.
14.THE GC IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED
CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE G.C. SHALL FOLLOW ALL
MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WORK SHALL BE COVERED
TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER
INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GC'S EXPENSE.
LOCATION MAP
VICINITY MAP
A-7.0 ROOF PLAN AND NOTES X -- -- -- --
A-7.1 ROOF DETAILS X -- -- -- --
CODE SUMMARY
2012 INTERNATIONAL BUILDING CODE (IBC)
2012 INTERNATIONAL RESIDENTIAL CODE (IRC)
2012 INTERNATIONAL FIRE CODE (IFC)
2009 INTERNATIONAL MECHANICAL CODE (IMC)
2012 INTERNATIONAL PLUMBING CODE (IPC)
2012 INTERNATIONAL FUEL GAS CODE (IFGC)
2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC)
2014 NFPA 70: NATIONAL ELECTRICAL CODE (NEC)
2015 NFPA 101: LIFE SAFETY CODE (LSC)
2010 AMERICANS WITH DISABILITIES ACT (ADA)
2015 ARCHITECTURAL BARRIERS ACT (ABA)
ALL OTHER APPLICABLE STATE AND LOCAL CODES
ABA ARCHITECTURAL BARRIERS ACT HM HOLLOW METAL
ADA AMERICANS W/ DISABILITIES ACT HORIZ HORIZONTAL
ADJ ADJUSTABLE INSUL INSULATION
AFF ABOVE FINISHED FLOOR INT INTERIOR
ALUM ALUMINUM LAV LAVATORY
CJ CONTROL JOINT MAX MAXIMUM
CONC CONCRETE MECH MECHANICAL
CMU CONC. MASONRY UNIT MIN MINIMUM
DBL DOUBLE MO MASONRY OPENING
DIA DIAMETER MTL METAL
DIM DIMENSION NFHB NONFREEZE HOSE BIBB
DS DOWNSPOUT NIC NOT IN CONTRACT
ELEC ELECTRICAL NTS NOT TO SCALE
EWC ELECTRIC WATER COOLER OC ON CENTER
EXP EXPANSION OPP OPPOSITE
EXT EXTERIOR PT PRESSURE TREATED
FDC FIRE DEPT. CONNECTION REINF REINFORCED
FE FIRE EXTINGUISHER RD ROOF DRAIN
FEC FIRE EXTINGUISHER CABINET RO ROUGH OPENING
FFE FINISH FLOOR ELEVATION SCW SOLID CORE WOOD
FRP FIBERGLASS REINF. PLASTIC SIM SIMILAR
FRT FIRE RETARDANT TREATED SOG SLAB ON GRADE
GALV GALVANIZED STRUCT STRUCTURAL
GC GENERAL CONTRACTOR TOS TOP OF STEEL
GWB GYPSUM WALL BOARD TYP TYPICAL
GYP GYPSUM UNO UNLESS NOTED OTHERWISE
HB HOSE BIBB VERT VERTICAL
HCW HOLLOW CORE WOOD VIF VERIFY IN FIELD
PROJECT INFORMATION
CONSTRUCTION TYPE: V-B (SPRINKLED)
OCCUPANCY CLASSIFICATION: MIXED, NON-SEPARATED
BUSINESS (B)
LOW-HAZARD STORAGE (S-2)
BUILDING AREA (SF): BASEMENT 6,876.46
FIRST 8,475.50
SECOND: 6,687.23
ATTIC: 2,152.06
TOTAL: 24,191.25
DS
DS
OUTLINE OF EXISTING
WALL BELOW (TYPICAL)
V
A
L
L
E
Y
RIDGE
REMOVE AND
RECONSTRUCT CRICKET
EXISTING METAL COVERED ROOF DECK.
REMOVE. INSTALL RUBBERIZED
UNDERLAYMENT OVER ENTIRE AREA AND
REPLACE IN KIND WITH NEW ROOF PANELS.
DS
SLOPESLOPE
RIDGE
V
A
L
L
E
Y
H
I
P
H
I
P
H
I
P
H
I
P
R I D
G E
R I D
G E
V
A
L
L
E
Y
V
A
L
L
E
Y
H
I
P
H
I
P
H
I
P H
I
P
H
I
P
V
A
L
L
E
Y
H
I
P
H
I
P
H
I
P
RIDGE
SLOPE SLOPE
SLOPE
'FLAT' ROOF w/
"/FT MIN. SLOPE
RD
OFD
DS
DS
V
A
L
L
E
Y
H
I
P
V
A
L
L
E
Y
RIDGE
V
A
L
L
E
Y
R I D
G E
R I D
G E
V
A
L
L
E
Y
RIDGE
DS
DS
DS
SLOPE
SLOPE
SLOPE
V
A
L
L
E
Y
RIDGE
DS
DS
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
S L O
P E
DS
DS DS
DS
ROOF PLAN
3/16" = 1'-0"
EXISTING GUTTERS. REMOVE, STORE AND
PROTECT FOR REINSTALLATION. TYPICAL.
EXISTING DOWNSPOUTS. REMOVE, STORE AND
PROTECT FOR REINSTALLATION. TYPICAL.
ROOFING NOTES:
1. PROTECTION OF EXISTING ROOF:
A. SHADING INDICATES EXISTING ROOF OVER BUILDING ADDITION TO
REMAIN. PROTECT EXISTING CONSTRUCTION.
B. NEW VALLEY FLASHING AT INTERSECTION OF NEW AND EXISTING ROOF
SHALL BE EXECUTED TO MAINTAIN A WATERTIGHT CONDITION BEFORE,
DURING AND AFTER CONSTRUCTION.
2. ROOF INSPECTION:
A. DEMOLISH EXISTING ROOF DOWN TO EXISTING DECK IN ITS ENTIRETY.
RETAIN GUTTERS, DOWNSPOUTS AND OTHER ROOF MOUNTED ITEMS TO
BE REINSTALLED.
B. ENSURE THAT THE EXISTING ROOF DECK IS CLEAN, SMOOTH AND DRY
BEFORE NEW ROOF SYSTEM IS INSTALLED.
C. VERIFY THAT THERE IS NO SIGNIFICANT DELAMINATION, WARPAGE,
BOWING OR SEPARATION FROM THE THE RAFTERS OR TRUSSES. CHECK
FOR DECK ROT.
D. MAKE REPAIRS TO ROOF SHEATHING AS NECESSARY. ASSUME THAT 20%
OF DECK WILL REQUIRE REPAIR OR REPLACEMENT.
3. INSTALLATION OF NEW ROOF SYSTEM:
A. NEW ROOF SYSTEM IS TO BE INSTALLED PER THE MANUFACTURER'S
WRITTEN ROOF INSTRUCTIONS FOR THIS APPLICATION.
B. MANUFACTURER'S RECOMMENDATIONS FOR SHALL BE FOLLOWED FOR
THE INSTALLATION OF SELF-ADHERING, RUBBERIZED, REINFORCED,
HIGH-TEMPERATURE MEMBRANE IN VULNERABLE AREAS, INCLUDING BUT
NOT LIMITED TO RECOMMENDED DISTANCE FROM INTERIOR FACE OF ALL
EXTERIOR WALLS, EQUIPMENT CURBS AND AND PENETRATIONS, RAKE
AND EAVE EDGES, VALLEYS, HIPS AND RIDGES.
SLOPE
SLOPE
S L O
P E
S L O
P E
S L O
P E
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
EXISTING ROOF TO
REMAIN - PROTECT
NEW ROOF
EXISTING ROOF TO
REMAIN - PROTECT
NEW ROOF
DS DS
EXISTING ROOF AT ADDITION TO REMAIN.
PROTECT.
AREAS TO RECEIVE HIGH-TEMPERATURE,
SELF-ADHERING SHEET MEMBRANE
UNDERLAYMENT. VERIFY LOCATIONS WITH
ROOF MANUFACTURER'S RECOMMENDATIONS.
ROOF LEGEND:
A-7.0
A-7.0
A-7.0
A-7.0
A-7.0
A-7.0
A-7.0
A-7.0
A-7.0
A
A-7.0
A
R I D
G E
A
A
T
Y
P
A
A
T
Y
P
T
Y
P
A-7.0
A-7.0
1 A
T
Y
P
A-7.0
A
A-7.0
T
Y
P
A-7.0
A-7.0
TYP.
TYP.
REMOVE AND RE-BUILD CRICKET.
DETAIL PER MANUFACTURER'S
RECOMMENDATIONS.
12:12 12:12
18:12
18:12
18:12
18:12
18:12
Sheet Title
D E
S C
R I P
T I O
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
P A
B
U
Z
R
E G
I O
N A
L
E
N G
I N
E E
R
W e s t
M a i n
S t r e e t
R u s s e l l v i l l e
A
R
A7.0
ROOF PLAN
Project
Number
CDS
TBD
N ew
R oo f fo r th e
H en ry K oe n
Fe de ra l B ui ld in g
AND NOTES
UNDER EAVE TILE
16 OZ. COPPER
FORMED DRIP EDGE
W/ 1/2" HEM
VERTICAL FASCIA
WATERPROOF
UNDERLAYMENT
3/4" PLYWOOD
GEORGIAN TILE
OVERHANG
18" STRIP OF HIGH TEMP
SELF-ADHERING MODIFIED
BITUMEN MEMBRANE
2" MIN.
HEADLAP
MIN. 3/4" MAX. 2"
REQ'D FASTENERS
(TYPICAL)
1" X 2" TREATED
CANT STRIP
HIGH TEMP SELF-ADHERING
MODIFIED BITUMEN MEMBRANE
3/4" PLYWOOD
M
I N
M
I N
WATERPROOF
UNDERLAYMENT
GEORGIAN TILE
REQ'D FASTENERS
16 OZ. COPPER
COUNTER FLASHING
FILL REGLET
W/ SEALANT
8" TYPICAL.
EXPOSURE
5" MIN.
1/2" HEM
16 OZ. COPPER
STEP FLASHING
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW.
MODIFICATIONS MAYBE REQUIRED TO MEET PROJECT
SPECIFIC REQUIREMENTS.
2. MINIMUM 2" HEADLAP REQUIRED.
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE
REQUIRED TO MEET PROJECT SPECIFIC REQUIREMENTS.
2. TYPICAL HORIZONTAL EXPOSURE 8".
3. LENGTH OF STEP FLASHING TO BE 16".
REQ'D FASTENERS
3/4" PLYWOOD
GEORGIAN LONG TOP TILE
WATERPROOF
UNDERLAYMENT
MASONRY
16 OZ. COPPER COUNTERFLASHING
EMBEDDED IN MORTAR JOINT
COVER TILE MIN. 5"
FILL REGLET W/ SEALANT
ROOF CEMENT
OR SEALANT
5" MIN.
GEORGIAN FIELD TILE
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE
REQUIRED TO MEET PROJECT SPECIFIC REQUIREMENTS.
3/4" PLYWOOD
VERTICAL FASCIA
WATERPROOF
UNDERLAYMENT
8" TYPICAL.
EXPOSURE
GEORGIAN
FIELD TILE
REQ'D FASTENERS
GEORGIAN
END BAND TILE
18" STRIP OF HIGH TEMP
SELF-ADHERING MODIFIED
BITUMEN MEMBRANE
16 OZ. COPPER
FLASHING/RAKE EDGE
SEE NOTE 3
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE
REQUIRED TO MEET PROJECT SPECIFIC REQUIREMENTS.
2. WATERPROOF UNDERLAYMENT TURNED DOWN 1" OVER VERTICAL
FASCIA.
3. DO NOT PENETRATE COPPER FLASHING. ATTACH END BANDS WITH
COPPER WIRE AND TIE OFF TO FASTENER PLACED BEYOND FLASHING.
USE ADHESIVE TO SECURE THE WIRE TIED PIECES TO ADJACENT
MECHANICALLY FASTENED PIECES.
3/4" PLYWOOD
V HIP TILE
WATERPROOF
UNDERLAYMENT
REQ'D FASTENERS
GEORGIAN TILE
SEALANT
18" STRIP OF HIGH TEMP
SELF-ADHERING MODIFIED
2" X PROPER HEIGHT
FOUNDATION GRADE
BITUMEN MEMBRANE
RIDGE STRINGERS
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE
REQUIRED TO MEET PROJECT SPECIFIC REQUIREMENTS.
2. MINIMUM 2-1/4" HEADLAP REQUIRED FOR V HIP.
3. A BEAD OF SEALANT SHOULD BE APPLIED BETWEEN THE LAP OF EACH
HIP TILE.
3/4" PLYWOOD
V RIDGE TILE
WATERPROOF
UNDERLAYMENT
REQ'D FASTENERS
18" STRIP OF HIGH TEMP
SELF-ADHERING MODIFIED
GEORGIAN TILE
2" X PROPER HEIGHT
FOUNDATION GRADE
BITUMEN MEMBRANE
SEALANT
RIDGE STRINGERS
GEORGIAN SHORT TOP TILE
GEORGIAN LONG TOP TILE
MODIFIED BITUMEN
3/4" PLYWOOD
6" MIN. OPENING
HIGH TEMP
SELF-ADHERING
MEMBRANE
16 OZ. COPPER
VALLEY FLASHING
6" STRIP OF HIGH TEMP
SELF-ADHERING MODIFIED
BITUMEN MEMBRANE
COPPER CLEAT 8"-24" O.C.
BEND OVER FASTENER
AT TOP OF VALLEY
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE REQUIRED TO
MEET PROJECT SPECIFIC REQUIREMENTS.
2. DO NOT PENETRATE COPPER VALLEY FLASHING. ATTACH SMALL CUT VALLEY TILES WITH
COPPER WIRE AND TIE OFF TO A FASTENER PLACED ABOVE COPPER VALLEY FLASHING.
3. CUT VALLEY TILE MUST PROVIDE A MINIMUM 4" OVERLAP OF COPPER VALLEY FLASHING.
4. EXPOSURE OF THE COPPER VALLEY FLASHING SHOULD INCREASE 1" PER 8' RUN
TOWARDS THE EAVE.
GENERAL NOTES:
1. THIS IS A PROTOTYPICAL DETAIL FOR REVIEW. MODIFICATIONS MAYBE
REQUIRED TO MEET PROJECT SPECIFIC REQUIREMENTS.
2. MINIMUM 2-1/4" HEADLAP REQUIRED FOR V RIDGE.
3. A BEAD OF SEALANT SHOULD BE APPLIED BETWEEN THE LAP OF EACH
RIDGE TILE.
GEORGIAN CUT VALLEY TILE
Sheet Title
D E
S C
R I P
T I O
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
P A
B
U
Z
R
E G
I O
N A
L
E
N G
I N
E E
R
W e s t
M a i n
S t r e e t
R u s s e l l v i l l e
A
R
A7.1
ROOF DETAILS
Project
Number
CDS
TBD
N ew
R oo f fo r th e
H en ry K oe n
Fe de ra l B ui ld in g
SECTION AT EAVE
1-1/2" = 1'-0"
SECTION AT SIDE WALL
1-1/2" = 1'-0"
SECTION AT HEAD WALL
1-1/2" = 1'-0"
SECTION AT CLOSED RAKE EDGE
1-1/2" = 1'-0"
SECTION AT V HIP
1-1/2" = 1'-0"
SECTION AT FIELD CUT VALLEY
1-1/2" = 1'-0"
SECTION AT V RIDGE
1-1/2" = 1'-0"
| Roof Plan-Cover.pdf |
| Sheets and Views |
| Cover |
| Roof Plan-A7.0.pdf |
| Sheets and Views |
| A7.0 |
| Roof Plan-A7.1.pdf |
| Sheets and Views |
| A7.1 |