Sol..docx
DOCX document 103 KB Posted
- Attached to
- Big Willow & Bench Fence Construction Federal contract opportunity
- Solicitation number
- AG-67T0-S-14-0039
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF-30.doc | DOC document | |
| Revised_PROJECTNOTES SUMMARY_Layout_(1).pdf | ||
| Revised_Sched._of_Items.doc | DOC document | |
| SF-1442.pdf | ||
| PDF-Drawings1 1 .pdf | ||
| Instruction_Sheet.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-67T0-S-14-0039 Big Willow & Bench Fence Const. Nebraska Nat. Forest
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
Bench Base Items
151(01)A
Mobilization
LS
203(02)A
Removal of Existing Fence
LF
619(01)A
Fence, Reset Existing Wooden Posts
LF
1,450
619(01)B
Fence, 4 Strand Barbed Wire
LF
619(01)C
Fence, Restretch and Reattach Existing Wire
LF
2,070
619(02)A
Gate, 4 Strand Barbed Wire
Each
619(02)B
Gate, 4’ Powder River
Each
619(04)
Brace Panels
Each
Big Willow Base Items
151(01)B
Mobilization
LS
203(02)B
Removal of Existing Fence
LF
4,460
619(01)D
Fence, Post and Pole (type I) supply and install posts
LF
4,400
619(01)E
Fence, Post and Pole (type I) supply rails
Each
619(01)F
Fence, Post and Pole (type II) supply and install posts & rails
LF
619(02)C
Gate, Reinstallation of existing Powder River
Each
Total Base Items
Big Willow Optional Item
619(01)G
Fence, Post and Pole (type I) install rails
Each
Total All Items
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
Proposals shall be valid for 30 days .
Unit Price Prevails
COMPLETE THE FOLLOWING
| Vendor Name: |
| Phone: |
| Signature: |
| Fax: |
| Address: |
| Email: |
| City,State, Zip |
| TIN # |
DUNNS #
United States Department of Agriculture
Non Discrimination Statement
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual’s income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means of communication of program information (Braille, large print, audiotape, ect.) should contact USDA’s TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C 20250-9410, or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
The Bighorns National Forest project consists of furnishing labor, equipment and materials for the construction and reconstruction of fences at the Big Willow and Bench locations. Items of work include (but are not limited to): mobilization; removal of existing fence; reinstalling existing fence; installing new fence; installation of brace panels and installation and reinstallation of gates.
C-2 PROJECT LOCATION:
Big Willow Fence – Sheridan County, T55N, R89W, Sec. 11. Directions from Sheridan, Wyoming to the project location are as follows: travel North on Interstate 90 approximately 13 miles to exit #9, then travel approximately 38 miles West on US Highway 14 to Burgess Junction from there approximately 3 miles West on US Highway 14A to the project site.
Bench Fence – Big Horn County, T53N, R89W, Sec. 22. Directions from Greybull, Wy to the project location are as follows: travel approximately 28 miles East on US Highway 14 to the project site.
C-3 PRICE RANGE:
The Government’s estimate is: between $25,000 and $100,000
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-4 AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C-5 AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-6 Specifications:
The specifications for this contract are contained within the document “STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS”. Document FP-03 U.S. Customary Units. A copy of these specifications can be obtained by visiting the website –http://www.wfl.fhwa.dot.gov/design/specs/fp03.htm
Biobased Products
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of biobased and recycled products.
The following is a list of categories for biopreferred products that are required for performance of this service contract.
Equipment Lubricants, Hydraulic Fluids, Fuel Additives, Engine Oils, Office Products (Ink, paper, cleaning products)
For more information regarding the Department of Agriculture Biobased Program go to: http://www.biopreferred.gov.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
| 52.246-1 | Contractor Inspection Requirements (APR 1984) |
| 52.246-12 | Inspection of Construction (AUG 1996) |
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F-2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at Forest Service Office, Chadron, NE.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by actual conditions.
(b) Weather conditions are seasonal for this area. Average summer temperature of 72 degrees F and average winter temperature of 23 degrees F. The temperature may get above 100 degrees F at times during the summer and below 0 degrees F during the winter.
(c) Transportation facilities consists of public highways and secondary county roads. Weight limitations on primary and secondary roads apply during spring thaw.
H-2 AGAR 452.228-71 INSURANCE COVERAGE (NOV 1996)
Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:
(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.
(b) General Liability. The Contractor shall have bodily injury liability insurance coverage written on a comprehensive form of policy of at least $500,000 per occurrence.
(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
H-3 Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
| C. | Government inspections and tests are for the sole benefit of the Government and do not-- |
| 1. | Relieve the Contractor of responsibility for providing adequate quality control measures; |
| 2. | Relieve the Contractor of responsibility for damage to or loss of the material before acceptance; |
| 3. | Constitute or imply acceptance; or |
| 4. | Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below. |
D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
H-4 Safety
Identify inherently hazardous conditions that could lead to serious injury or loss of life.
Identify and describe inherently hazardous conditions.
Recognize hazards when contracting for inherently hazardous working conditions.
When inherently hazardous conditions exist, the contract should require a written, job-specific safety plan for information and discussion at the post award meeting.
Plan to reduce safety hazards and the costs of litigation.
Make sure that inherently hazardous conditions are documented and are written up in a job-specific Job Hazard Analysis (JHA) for Forest Service employees involved. This will help identify hazards involved in the job.
For each contract evaluate working conditions to determine if specific inherently hazardous conditions will be encountered as part of the needed construction work. If these conditions do exist, they need to be listed in the contract.
H-5 Suspensions for Other Than Government’s Convenience The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242-14, Suspension of Work, and shall not qualify for equitable adjustment.
H-6 CONTRACTOR PERFORMANCE ASSESSMENT SYSTEM (CPARS) PROGRAM
This contract will be subject to reporting in the Contractor Performance Assessment System (CPARS) program. Contractors are encouraged to take training and register in this program. Information can be found at:
· Contractor Overview (2 hours). View Schedule - This training will give the student an understanding of the Contractor Representative and Contractor Corporate Senior Management levels of access, the policies and regulations governing ACASS/CCASS and CPARS, and the electronic workflow with particular attention to the Contractor comment function.
· Target Audience: This session is specifically targeted to Contractor users who provide Past Performance Evaluation comments or who manage the ACASS/CCASS and CPARS process for their company.
Online course:http://www.cpars.csd.disa.mil/allapps/cpartrng/webtrain/webtrain_all.htm
H- 7 Contract Administration
(a) CONTRACTING OFFICER means a person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings. The Contracting Officer signs all contractual documents, approves and signs all modifications to contracts, processes and approves payment requests, reviews and makes final decisions on contractual discrepancies, and administers the contract. The Contracting Officer is the only authorized individual to make changes to a contract.
(b) CONTRACTING OFFICER'S REPRESENTATIVE. The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the pre-work conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the contract shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.
(c) CONTRACTOR'S REPRESENTATIVE. Any representative of the Contractor shall be designated in writing. The designation shall clearly indicate the name and limitations of authority, if any, of the representative.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-13 System for Award Management Maintenance (JUL 2013)
0. Protecting the Government's Interest when Subcontracting
| with Contractors Debarred, Suspended, or Proposed for Debarment (JUL 2013) (Applicable if contract exceeds $30,000) | ||
| 52.211-18 | Variation in Estimated Quantity (APR 1984) | |
| 52.219-6 | Notice of Total Small Business Set-Aside (NOV 2011) | |
| 52.219-28 | Post-Award Small Business Program Representation (JUL 2013) | |
| 52.222-3 | Convict Labor (JUN 2003) | |
| 52.222-6 | Davis-Bacon Act (JUL 2005) | |
| 52.222-7 | Withholding of Funds (FEB 1988) | |
| 52.222-8 | Payrolls and Basic Records (JUN 2010) | |
| 52.222-9 | Apprentices and Trainees (JUL 2005) | |
| 52.222-10 | Compliance with Copeland Act Requirements (FEB 1988) | |
| 52.222-11 | Subcontracts (Labor Standards) (JUL 2005) | |
| 52.222-12 | Contract Termination - Debarment (FEB 1988) | |
| 52.222-13 | Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) | |
| 52.222-14 | Disputes Concerning Labor Standards (FEB 1988) | |
| 52.222-15 | Certification of Eligibility (FEB 1988) | |
| 52.222-21 | Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000) | |
| 52.222-26 | Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) | |
| 52.222-27 | Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if FAR52.222-26 is included) | |
| 52.222-35 | Equal Opportunity for Veterans (SEP 2010) | |
| 52.222-36 | Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds $15,000) | |
| 52.222-37 | Employment Reports Veterans (SEP 2010) | |
| 52.222-50 | Combating Trafficking in Persons (FEB 2009) | |
| 52.223-5 | Pollution Prevention and Right-to-Know Information (MAY 2011) | |
| 52.223-6 | Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an | |
| individual) | ||
| 52.223-15 | Energy Efficiency in Energy-Consuming Products (DEC 2007) | |
| 52.223-18 | Encouraging Contractor Policies to Ban Text Messaging While Driving |
(AUG 2011)
| 52.224-1 | Privacy Act Notification (APR 1984) |
| 52.224-2 | Privacy Act (APR 1984) |
| 52.225-13 | Restrictions on Certain Foreign Purchases (JUN 2008) |
| 52.227-4 | Patent Indemnity -- Construction Contracts (DEC 2007) |
| 52.228-2 | Additional Bond Security (OCT 1997) (applicable if contract exceeds $30,000) |
| 52.228-11 | Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000) |
| 52.228-12 | Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000) |
| 52.228-14 | Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000 |
| 52.232-5 | Payments Under Fixed-Price Construction Contracts (SEP 2002) |
| 52.232-23 | Assignment of Claims (JAN 1986) |
0. Prompt Payment for Construction Contracts (JUL 2013)
| 52.232-33 | Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) |
| 52.232-39 | Unenforceability of Unauthorized Obligations (JUN 2013) |
| 52.233-1 | Disputes (JUL 2002) |
| 52.233-3 | Protest After Award (AUG 1996) |
| 52.233-4 | Applicable Law for Breach of Contract Claim (OCT 2004) |
| 52.236-3 | Site Investigation and Conditions Affecting the Work (APR 1984) |
| 52.236-5 | Material and Workmanship (APR 1984) |
0. Permits and Responsibilities (NOV 1991)
| 52.236-17 | Layout of Work (APR 1984) |
| 52.236-26 | Preconstruction Conference (FEB 1995) |
| 52.243-5 | Changes and Changed Conditions (APR 1984) |
| 52.244-6 | Subcontracts for Commercial Items (JUL 2013) |
| 52.246-21 | Warranty of Construction (MAR 1994) |
Alternate I (APR 1984)
| 52.249-1 | Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) |
| 52.253-1 | Computer Generated Forms (JAN 1991) |
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $30,000)
| 452.236-71 | Prohibition Against the Use of Lead-Paint (NOV 1996) |
| 452.236-72 | Use of Premises (NOV 1996) |
| 452.236-73 | Archeological or Historic Sites (FEB 1988) |
| 452.236-74 | Control of Erosion, Sedimentation and Pollution (NOV 1996) |
| 452.236-76 | Samples and Certificates (FEB 1988) |
| 452.236-77 | Emergency Response (NOV 1996) |
I.2 FAR 52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT
(OCT 1997)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (September 2013).
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA) designated items unless
(1) The product cannot be acquired
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than
(i) October 31 of each year during contract performance.
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
1. The Schedule (excluding the specifications)
1. Representations and other instructions
1. Contract clauses
1. Other Documents, exhibits, and attachments
1. The Specifications
I.3 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (September 2013).
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA) designated items unless
(1) The product cannot be acquired
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat orcombat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than
(i) October 31 of each year during contract performance.
I.4 FAR 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS
(SEP 2010)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
| Construction Material Description |
| Unit of Measure |
| Quantity |
| Price (Dollars)* |
Item 1:
| Foreign construction material |
| _______ |
| _______ |
| _______ |
| Domestic construction material |
| _______ |
| _______ |
| _______ |
| Item 2: |
| _______ |
| _______ |
| _______ |
| Foreign construction material |
| _______ |
| _______ |
| _______ |
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I-5 FAR 52.228-1 Bid Guarantee (SEP 1996) (Applicable over $150,000)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds –
(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I-6 FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Applicable to Contracts>$30,000 but < $150,000)
(a) The Contractor shall submit one of the following payment protections
1. PAYMENT BOND
2. IRREVOCABLE LETTER OF CREDIT (ILC)
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
I-7 52.228-15 Performance and Payment Bonds -Construction. (OCT 2010)
(a) Definitions. As used in this clause -
"Original contract price" means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
I-8 52.232-70 Reimbursement for Bond Premiums - Fixed-Price Construction Contracts. (NOV 1996)
The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of performance and payment bonds required by the contract. Reimbursement for bond premiums under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not cover any amount therefor not included in the contract price.
I-9 Order of Precedence--Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
I-10 FAR 52.236-1 Performance of Work by the Contractor (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
I-11 52.236-7 Permits and Responsibilities. (NOV 1991)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.
I-12 FAR 52.232-99 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (DEVIATION) (AUG 2012) This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.
(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.
(b) Include the substance of this clause, including this paragraph (b), in all subcontracts with small business concerns.
(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
I-13 AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (FEB 2012) (ALTERNATE 1) (FEB 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
I-14 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
| 1. Wage Rates Wyoming |
| Pgs.23-27 |
| 1. Maps/Drawings |
| 5 |
General Decision Number: WY140041 04/04/2014 WY41
State: Wyoming
Construction Type: Highway
Counties: Albany, Big Horn, Campbell, Carbon, Converse, Crook, Fremont, Goshen, Hot Springs, Johnson, Lincoln, Niobrara, Park, Platte, Sheridan, Sublette, Sweetwater, Teton, Uinta, Washakie and Weston Counties in Wyoming.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 04/04/2014
SUWY2014-001 03/18/2014
Rates Fringes
CARPENTER (Structure)............$ 20.19 4.09
CEMENT MASON/CONCRETE FINISHER...$ 20.18 3.01
ELECTRICIAN
Electrician (Includes Inside Wireman, Outside- Lineman, Signal and Lighting Work)..............$ 42.14 11.01 Equipment Operator (Electrical Work Only)......$ 35.08 9.89 Ground Man..................$ 24.98 7.14
IRONWORKER.......................$ 22.00 1.50
LABORER
GROUP 1.....................$ 15.29 0.00
GROUP 2.....................$ 17.17 1.98
GROUP 3.....................$ 18.20 2.85
LABORER CLASSIFICATIONS:
GROUP 1: Erector & Installer (fences, guardrail & barrier);
Flag persons (traffic control); Form Strippers; General Laborers, Heater Tender; Material Checker; Pilot Car Driver;
Pick-up Truck Driver; Pre-watering; Presetting & Pre-irrigation (all work); Riprap Man; Tar & Asphalt Pot Tender.
GROUP 2: Asphalt Raker and Tamper; Bin Wall Installer; Chain Saw Operator (clearing & grubbing); Concrete Saw (all types); Dump Man; Form Setter (paving); Hand Operated Vibratory Roller; High Scaler; Jackhammer & Pavement Breaker; Landscaper, Landscape Laborer; Maintainer (traffic control); Mortar Man on Stone Riprap; Nozzle Man (air, water, gunite & sandblasting); Pipe Setter (all pipe types); Tamper Operator (pneumatic, electric, gas & similar)
GROUP 3: Drill Doctor; Form Setter and Mover; Spader: Spilling and/or Caisson Worker; Miner (driller); Machine Man; Timber Man; Powderman, Blaster, Tender; Wagon Drill, Air-Trac. diamond and other drills for blasting powder or grouting) PAINTER (Brush & Spray)..........$ 17.17 1.98
POWER EQUIPMENT OPERATOR:
GROUP 1.....................$ 19.42 2.52
GROUP 2.....................$ 21.11 3.48
GROUP 3.....................$ 24.03 3.48
POWER EQUIPMENT OPERATOR CLASSIFICATIONS:
GROUP 1: Air Compressor (all types); Backhoes & Excavators (to 5CY.); Batch Bin Weighman, Sissorman or Hopper; Broom Operator (self-propelled); Chip Spreader Operator; Conveyor Belt Operator; Crusher Oiler; Form Grader Operator; Joint Machine Operator; Longitudinal Float Operator; Oiler, Utility;
Power Loader (belt & bucket type); Pump Operator; Roller Operator, self-propelled (Dirt); Skid Steer (all attachments); Tire Repairman (large construction equip. tires); Tractor Operator (farm with or w/o power attachments); Tugger (all types)
GROUP 2: Articulated Rock Truck (all capacity); Asphalt Plant Operator; Backhoe, Excavator & Shovel (6CY. & larger); Batch Plant Operator; Bituminous Laydown Machine Operator; Concrete Batch Plant Operator; Concrete Finish Machine Operator; Concrete Spreader & Paver Operator; Concrete Multi Blade Span Saw (Hunt process); Crusher Operator; Dozer Operator (all sizes & power attachments); Draglines, Cranes, Piledriver & Truck Mounted Cranes (Mfg. Rating: less than 3.5 CY., and /or less than 50 Tons, all attachments); Drilling Machine, Integrated (all types); Front End Loaders (1.5 up to 10 CY.); Hydro-type Crane (to 50 tons); Mixer Operator, Concrete (over 1yd.); Motor Patrol Operator (all excluding finish); Mulching Machine Operator; Oiler (crane & shovels); Pavement Breaker; Hydro-Tamper & similar; Roller Operators, Asphalt (steel & pneumatic); Roto-Milling Machine (under 8ft. wide); Scraper quipment (all types and sizes; Screed Operator; Trenching Machine Operator
GROUP 3: Cranes (all types 90 tons & larger); Draglines, Cranes, Piledrivers & Truck Mounted Cranes (Mfg. Rating: 3.5 CY. or larger and/or 50 tons & larger, all attachments); Front End Loaders (over 10 CY.); Heavy Duty Mechanic; Machine Doctor; Hoist Operator (two or more drums, shafts, or raises); Mixer Operator (dual drum); Motor Patrol Operator (finish); Roto-Milling Machine (8ft. & larger)
TRUCK…