ERFO_145_DOW_-_2015.docx

DOCX document 24 KB Posted

Attached to
FR 145 ERFO Mark Twain National Forest Federal contract opportunity
Solicitation number
AG-64R4-S-15-0024JS
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Description of Work

View the file

Other files for this federal contract opportunity

Other files attached to FR 145 ERFO Mark Twain National Forest, newest first.
File Type Posted
Construction_Notes.pdf PDF
SF_30.pdf PDF
DBA_Wage_Determination_MO150001_Highway.pdf PDF
Contractor_and_Past_Performance_Info.docx DOCX document
FSRD_145_ERFO_2015___Map.docx DOCX document
AG-64R4-S-15-0024_Forest_Road_145_Restoration_Pond_Fork.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FSRD 145 – POND FORK - ERFO ROAD RECONDITIONING

DESCRIPTION OF WORK

DSR #: FSR - 145 - 2.5

Disaster #: MO2013 - 1 - FS

MILEPOST

0.0 FSRD 145 intersects with state highway W straight ahead and Ozark County Road Jennings right.

Begin reconditioning FSRD 145.

Begin spreading 1" minus crushed, aggregate 2" deep x 18' wide.

Begin reconditioning ditch lines and outlets left and right to a 1' minimum depth whether identified or not with appropriate construction equipment.

Reestablish ditch blocks as necessary.

.02 Clean AA type outlet ditch right.

End ditches left and right. Begin out slope left and right.

.04 Maintain concrete bridge structure.

.05 End out slope section. Resume reconditioning ditch lines left and right.

Begin removing berm left.

.06 Begin scarification to a depth of 6" x 18' wide.

Replace unsuitable materials and begin spreading 1" minus, crushed aggregate 6" deep x 18' wide.

Recondition AA type outlet ditch left.

Protect private property.

.08 Recondition AA type outlet ditch left.

Protect private property.

.10 Replace existing corrugated metal pipe with 34' long x 24" diameter corrugated metal pipe.

Rock removal shall be required.

Historic components of the corrugated metal pipe shall be identified by the COR.

Reestablish outlet left.

.12 Recondition AA type outlet left.

Begin removing berm left.

Protect mature trees and fence line.

DSR #: FSR - 145 - 2.5

Disaster #: MO2013 - 1 - FS

MILEPOST

.14 End removing berm left. Begin removing berm right.

Blend acceptable material into the roadway.

Maintain corrugated metal pipe.

Clean inlet and outlet.

.17 Recondition AA type outlet ditch left.

Protect private property.

.18 Recondition AA type outlet ditch left.

Protect private property.

Install a 35' long x 24" diameter corrugated metal pipe.

Rock removal shall be required.

.20 End berm removal right.

End scarification.

End replacing unsuitable materials.

End spreading 1" minus, crushed aggregate 6" deep x 18' wide.

.21 Private drive right.

Install 34' long x 24" diameter corrugated metal pipe.

Rock removal shall be required.

Reconstruct AA type outlet left.

Begin constructing AA type outlets left every 100' as identified by the COR.

.31 Reconstruct AA type outlet left.

End constructing AA type outlets left every 100' as identified by the COR.

.36 End ditch right.

Begin out slope section.

DSR #: FSR - 145 - 2.5

Disaster #: MO2013 - 1 - FS

MILEPOST

.45 Remove cattle guard.

Install a 35' long x 24" diameter corrugated metal pipe with outlet right.

Rock removal shall be required.

Begin constructing ditch lines left and right.

Begin scarification to a depth of 6" x 18' wide.

Replace unsuitable materials and begin spreading 1" minus, crushed aggregate 6" deep x 18' wide.

.46 Junction with FSRD 145B right.

Install 36' long x 24" diameter corrugated metal pipe across FSRD 145B.

.50 Recondition AA type outlets left and right.

.53 End ditch left.

Remove berm right.

Begin out slope section.

End scarification.

End replacing unsuitable materials.

End spreading 1" minus, crushed aggregate 6" deep x 18' wide.

.66 End ditch right.

Reconstruct AA type outlet right.

Begin out slope section.

McClurg Glade left.

.73 Non-system road left.

Mark Twain National Forest portal sign left.

.74 Construct ditch left.

Install 32' long x 24" diameter corrugated metal pipe with outlet right.

.80 End ditch left.

Recondition AA type outlet ditch left.

Construct ditch right.

Recondition AA type outlet right.

FSRD 145 – POND FORK - ERFO ROAD RECONDITIONING

DESCRIPTION OF WORK

DSR #: FSR - 145 - 2.5

Disaster #: MO2013 - 1 - FS

MILEPOST

.85 End ditch right.

Maintain AA type outlet right.

.87 Maintain AA type outlet ditch left.

Reconstruct ditches left and right.

Rock removal shall be required.

.88 Recondition AA type outlet ditches left and right.

End ditch left.

Begin out slope section.

.93 End ditch left.

Replace existing corrugated metal pipe with 35' long x 24" diameter corrugated metal pipe.

Rock removal shall be required.

COR shall identify historic components at this mile post to be protected.

.94 Remove hazard tree left as identified by the COR.

.95 Remove hazard tree left as identified by the COR.

Discontinue reconditioning of FSRD 145.

Proceed to work identified at milepost 2.00.

End spreading 1" minus, crushed aggregate 2" deep x 18' wide.

2.00 Construct BB type outlet left.

Tree removal will be identified by the COR.

End all reconditioning of FSRD 145.

File details come from the government source that posted it. Updated .