Attachment_A_-_Maps_&_Drawings.pdf

PDF 411 KB Posted

Attached to
Cloquet River Bridges Repair Federal contract opportunity
Solicitation number
AG-63A9-S-17-0011
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Maps & Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Cloquet River Bridges Repair, newest first.
File Type Posted
Attachment_B-_Wage_Rates.pdf PDF
AG-63A9-S-17-0011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EASTERN REGION

VICINITY MAP:

US Department of Agriculture Forest Service

CLOQUET RIVER BRIDGES REPAIRS

Superior National Forest

Laurentian Ranger District

SHEET SHEET TITLE

FOREST DEVELOPMENT PROJECT

PROJECT

LOCATION

FROM FINLAND, MN, DRIVE WEST ON THE HEFELFINGER ROAD FOR

12 MILES, THEN SOUTH ON FR 102.

Region Nine

1 COVERSHEET

2 SPECIFICATION

3 DEADMAN AND PILE STAYS

4 CURB AND RAILING

FR 102- MP 12.6 and MP 14.0

NOT TO SCALE

Minnesota

COR

Scale

Date

CAD File No.

Checked

Drawn

Drawing No.

Project

Project Name

Drawing Title

No.

Revision/Issue Date

General Notes

JEFF RYPKA

SUPERIOR NF

Material Specifications:

Timber-- All grading, combinations, and sizes refer to Southern Pine.

Other species may be substituted with CO's approval.

Grades indicated are minimums.

All structural lumber is finished as indicated on the plans.

Grades as per SPIB. Sizes as per NIST-PS 20-94.

Glulams: Industrial Appearance Grade. Wet use adhesives.

Meets ASTM 2559, ASTM 3737, AITC/ANSI 190.1-1992, AITC 117-93-Design AITC-117-93-Manufacturing. AITC-109-90.

Sizes as per AITC 113.

Certification of Conformance per AITC A190.1 shall be submitted for approval for all glulams.

Structural lumber and glulams shall be protected during storage, and transit, with a minimum of load or bundle wrappings per AITC 111.

Pilings shall meet ASTM D25-91.

Excavation:

Excavation extents will only be to the extent necessary to add the deadman and pile stays to the bridge.

Erosion Control will be used for the job following USFS best management practices and and State practices.

The road will be back filled with the existing material if suitable. If material is unsuitable the CO will need to make determination on how to progress. The USFS is assuming the material is useable. Contractor will be responsible for extra material to bring it back to grade.

The contractor will seed and mulch all areas disturbed. On slopes greater than 3:1, the contractor will use the erosion blanket in the specifications.

The contractor will place 6" of 3/4" gradation G, or equivalent on the distrubed travel surface returning it to the original dimensions when done.

The road will be closed at both ends during construction. Road closures will be coordinated with the CO.

Work to be done:

Base Bid:Replace all 4 pile caps, add 16 pile stays, and 4 dead man. Back fill, place surfacing, seed and mulch, and erosion control.

Bid Option #1: Replace curb, railing, and rail posts.

Bid Option #2: Replace running plank.

Preservative Treatment-- Piles treated with CCA to .8 PCF, Abutment boards, pile stays, deadman, rails, and rail post treated with CCA to .4 PCF or copper napthenate to .06 PCF.

Pile Caps, girders and deck treated with Penta to .6 PCF and Type A solvent; or copper naphthenate with CO approval.

Other preservatives may be used, meeting the appropriate UCS category 3B with CO approval.

Certification of above compliance with appropriate American Wood-preservative Association standards by an independent third party shall be provided.

All penta or copper naphthenate timber shall be predrilled before treatment.

Other holes should be field drilled. Field treat all holes with copper naphthenate.

"Best Management Practices for the Use of Treated Wood in Aquatic Environments" will be followed.

Steel-- Bolts and lags: ASTM A307,ASME B18.2.1 All bolts will include necessary nuts and washers.

All lag screws and bolt holes will be pilot drilled according to NDS.

Plate steel: ASTM A36 All steel shall be hot dipped galvanized and meet AASHTO M111 or M232

Temporary traffic control, signage and permanent object marker signs shall follow the Manual on Uniform Traffic Control Devices.

Also see the Special Contract Requirements in the contract.

Abbreviations:

L.B. Lag bolts M.B. Machine bolt, hex head D.B. Domehead bolt M.I. Mallable iron washer CCA Chromated copper arsenate cy cubic yards sp spaces pc pieces o.c. on center NDS National Design Standards, 2005 AFPA APWA American Wood Preservers' Association, 2002 S.R. Split ring glulam glue-laminated typ typical

Date

CAD File No.

Checked

Drawn

Drawing No.

Project

Project Name

Drawing Title

No.

Revision/Issue Date

General Notes

JEFF RYPKA

SUPERIOR NF

ABUTMENTS

Elevation View

Plan View

X Section

Date

CAD File No.

Checked

Drawn

Drawing No.

Project

Project Name

Drawing Title

No.

Revision/Issue Date

General Notes

JEFF RYPKA

SUPERIOR NF

Curb and Rail

Cross section

Curb and Rail

Elevation

Complete Pkg Checklist
RfCA signed
Schedule of Items
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES Cloquet River Bridges Repair
Engineer's estimate
Engineer’s Estimate
SECTION B – SERVICES AND PRICES Cloquet River Bridges Repair
AllCombined
dwg-01-cover.pdf
dwg-02-specs
dwg-03-pile caps
dwg-04-curb and rail
Special Project Requirements
SECTION 1 DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03:US CUSTOMARY UNITS
SPECIAL CONTRACT REQUIREMENTS CLOQUET BRIDGE REPAIRS, FR 102-MP 12.6 and 14.0
Preface
101.01 Meaning of Terms.
101.03 Abbreviations.
AL. - Aluminum ASP. - Asphalt ...
101.04 Definitions.
101.04 Definitions.
SPECIAL CONTRACT REQUIREMENTS Section 102. Bid, Award and Execution of Contract
SPECIAL CONTRACT REQUIREMENTS Section 103. Scope of Work
SPECIAL CONTRACT REQUIREMENT Section 104. Control of Work
104.03 Specifications and Drawings.
104.05 Load Restrictions.
SPECIAL CONTRACT REQUIREMENTS Section 105. Control of Material
105.02 Material Sources.
105.02(a) Government Provided Sources.
105.05 Use of Material Found in the Work.
SPECIAL CONTRACT REQUIREMENTS Section 106. Acceptance of Work
Delete subsection 106.07.
107.02 Protection and Restoration of Property and Landscape.
107.05 Responsibility for Damage Claims.
107.08 Sanitation, Health, and Safety.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
107.11 Protection of Forests, Parks, and Public Lands.
Add the following:
SPECIAL PROJECT REQUIREMENTS Section 108. Prosecution and Progress
SPECIAL PROJECT REQUIREMENTS Section 109. Measurement and Payment
109.02 Measurement Terms and Definitions.
109.03 Weighing Procedures and Devices.
109.03 Weighing Procedures and Devices.
SPECIAL PROJECT REQUIREMENTS Section 153. Contractor Quality Control
153.02 Contractor Quality Control Plan.
153.04 Records.
SPECIAL CONTRACT REQUIREMENTS Section 155. Schedules for Construction Contracts
SPECIAL PROJECT REQUIREMENTS Section 156. Public Traffic
153.03 Accomodating Traffic During Work.
208.04 General.
208.10 Backfill.
SPECIAL CONTRACT REQUIREMENTS Section 557. Timber Structures
Construction Requirements.
557.21 Payment.
625.03 General.
SPECIAL CONTRACT REQUIREMENTS Section 635. Temporary Traffic Control
635.03 General.
SPECIAL CONTRACT REQUIREMENTS Section 713. Roadside Improvement Material
713.03 Fertilizer.
713.04 Seed.
Species % by volume
Annual Ryegrass 50%
713.05 Mulch.
716.01 Untreated Structural Timber and Lumber.
716.02 Hardware.
716.03 Treated Structural Timber and Lumber.
Evaluation Criteria
Workplan snip

File details come from the government source that posted it. Updated .