About this file
Attachment A - Supplemental Specs.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Photos.pdf | ||
| AG-63A9-S-15-0011_Sol.pdf | ||
| Road_Obliteration-Closure_Details.pdf | ||
| Wage_Rates.pdf | ||
| Decom_Road_List_ _Maps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Service Supplemental Specifications to FP-03
LaCroix Road Decomissioning 2015
LaCroix Ranger District Superior National Forest
St. Louis County
Table of Contents
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts 155 Delete
156 - Public Traffic 211 - Roadway Obliteration
211.01 Description
211.02 Construction Requirements
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
http://www.nist.gov/
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety and replace with the following.
All work shall be completed before June 30th, 2016.
156 - Public Traffic 156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retro-reflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Keep existing roads open to all traffic during road decommissioning work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 5 minutes at any one time followed by an open period of no less than 5 minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) Install only those traffic control devices needed for each stage or phase.
(c) Relocate temporary traffic control devices as necessary.
(d) Remove devices that no longer apply to the existing conditions.
(e) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(f) Keep temporary traffic control devices clean.
(g) Remove all temporary traffic control devices upon contract completion or when approved.
(h) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.06 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
211 - Roadway Obliteration 211.01_nat_us_03_30_2005
211.01 Description.
Delete the subsection and substitute the following:
This work consists of obliterating roadways as shown on attached maps.
Obliterate the roadway by restoring to approximate original ground contours.
Obliterate the “Sight Distance” or length of road identified after a field review by the Forest Service (See road decommissioning worklist), at any road or power line intersection, by pulling from road edges rocks, logs and other debris into the full width of the existing open roadway in a random manner, making the roadway impassable to all motorized vehicles, including ATVs.
Windrowed rocks or large boulders located along roadway shall be randomly placed in obliterated roadway and buried one third to one half of their size while avoiding creating rock piles or linear lines of rocks.
Using the teeth on the excavator bucket or a ripper scarify to 12” minimum depth to loosen compacted soil within the roadway to promote vegetative growth.
Obtain clumps of live brush and small tree saplings, including root wads, from along the roadside and plant these into the former roadway. Road fill removed from the roadway for vegetation plantings shall be used to fill in the hole where the brush or tree was removed for planting.
The decommissioned road shall blend in with the surrounding landscape and effectively disappear from view. Upon completion the roadway shall be nearly “invisible” to passing motorists due to the newly planted grasses, brush and shrubs. Berms or rock piles are not an acceptable closure. Densely forested areas will require more plantings than areas that are lightly forested. If the road is in a pine plantation pull small pine into the road. If the road is in aspen regeneration pull small aspen into road. If the road is in a burned or blowdown area pull burned or blowndown material into road.
If a road that is to be decommissioned has multiple accesses to the road then obliteration and re-vegetation measures shall be applied to all intersections along the road.
Remove all pipes and other structures.
In general the equipment to be used shall be the minimum size necessary to accomplish the task. It will not be acceptable to use a large excavator to get 200’ into a road section if the excavator is going to damage or open up existing growth. Some of the road openings are only wide enough for a small 5-6’ wide vehicle to pass through without doing extensive damage to the existing vegetation. Successful bidders may need to rent or acquire different size pieces of equipment to perform the task.
Some roads in this contract are defined separately as a “Level 1 roadway closure.” These roads are listed as a separate bid item and do not require the same work as roadway obliteration/decommissioning. Construct level 1 roadway closures as depicted in the drawings or in accordance with the road-specific notes in the worklist.
211.02 Construction Requirements.
Add the following:
Limit disturbance to soils and vegetation. Slope all areas to drain and return water to natural watercourses. After removing culverts obtain approval from COR before continuing work. Remove all fill material to the natural channel. Treat slash and clearing debris according to Subsection 203.05.
211.02 (a) Rigid material.
Add the following:
(3) Culverts. Remove structures such as pipes according to Subsection 203.05(a), or as approved.
| Forest Service Supplemental Specifications to FP-03 |
| LaCroix Road Decomissioning 2015 |
| Table of Contents |
| Preface |
| 101 - Terms, Format, and Definitions |
| 101.01 Meaning of Terms |
| 101.03 Abbreviations. |
| 101.04 Definitions. |
| 102 - Bid, Award, and Execution of Contract |
| 102 Bid, Award, and Execution of Contract |
| 103 - Scope of Work |
| Deletions |
| 104 - Control of Work |
| Deletions |
| 104.06 Use of Roads by Contractor |
| 106 - Acceptance of Work |
| 106.07 Delete |
| 107 - Legal Relations and Responsibility to the Public |
| 107.05 Responsibility for Damage Claims. |
| 107.06 Contractor’s Responsibility for Work. |
| 107.09 Legal Relationship of the Parties. |
| 107.10 Environmental Protection. |
| 108 - Prosecution and Progress |
| 108 Delete. |
| 109 - Measurement and Payment |
| 109 Deletions |
| 109.02 Measurement Terms and Definitions. |
| 155 - Schedules for Construction Contracts |
| 155 Delete. |
| 156 - Public Traffic |
| 211 - Roadway Obliteration |
| 211.01 Description. |
| 211.02 Construction Requirements. |