Site_visit_Qs_and_As _attendees.pdf
PDF 184 KB Posted
- Attached to
- Chiller replacement, Edinburg, Texas Federal contract opportunity
- Solicitation number
- AG-6395-S-16-0108
About this file
Pre-proposal conference/site visit questions and answers and attendees
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_AG-6395-S-16-0108.pdf | ||
| General_Decision_Number_TX305.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers as a result of the May 25, 2016, pre-proposal conference/site visit at Moore Air Base, Edinburg, Texas:
Question 1: to complete the project with minimal disruption....the rental chiller must be reconnected right where the vertical piping meets the horizontal piping. This needs to be the first task. Is this process allowed? Response: Yes, paragraph 3.4 of the contract scope of work recommends this.
Question 2: does the piping system need to have piping to connect a second chiller installed in the future? Response: If a second chiller is installed in the future, it would be installed at the location of the quick connects for a future temporary chiller.
Question 3: what is the exact location for the rental connections? Response: See paragraph 1.4.6 of the contract scope of work.
Question 4: who is responsible to remove salvage chiller and piping? Response: See paragraphs 1.4 and
3.3 of the contract scope of work.
Question 5: will the chiller connect to the building system controls? Response: See paragraph 1.4.9 of the contract scope of work.