USDA-NRCS Rock County, Wisconsin Tree Planting & Native Seeding

EWPP-FPE #755F480900NZ4

STATEMENT OF WORK

1.1 PROJECT BACKGROUND

The USDA-NRCS is conducting floodplain forest and native grassland revegetation actions in Avon Township in Rock County, along the Sugar River.

The reforestation and native grassland design for this area site will include pre-planting site preparation, planting new vegetation in specified areas, installing tree mats and tree tubes, and providing post-planting maintenance.

1.2 PROJECT LOCATION

The Rock County floodplain forest and grassland re-establishment area is located in sections 25, 35 and 36 of Avon Township (T1N R10E). The site is approximately 9 miles southeast of Brodhead, Wisconsin, approximately 6 miles north of Durand, Illinois, and approximately 11 miles west of Beloit, Wisconsin.

1.3 MATERIALS

Supply site preparation and maintenance equipment and materials (herbicide & necessary application equipment and machinery for disking), native seed, nursery tree stock, tree mats and tubes as indicated in plans and specifications Certification of materials required before installation

1.4 EXECUTION

A. Documentation of pre-planting conference and pre-planting inspection with NRCS; obtain diggers hotline ticket number

B. Certification of materials

Native seed source, PLS
Tree stock source, certification of age, transplant (if required in specification)
Tree mats and tubes

C. Staking and Layout:

1. Staking and layout refers to locating and verifying all planting locations as shown on the plans and specifications.

D. Installation of materials

1. In May 2010, perform site preparation and planting (native seed, trees, tubes and mats)indicated on plans and specifications.
2. In October 2010 perform inspection on tree mortality as indicated in plans andspecifications

E. Maintenance

1. Throughout June, July and August 2010 perform maintenance (strip and field mowing)activities as indicated in plans and specifications.
2. In October 2010 perform maintenance (strip spraying in tree plantation area) as indicated inplans and specifications.
3. In 2011, perform maintenance (strip and field mowing) as indicated in plans andspecifications.

1.5 PROTECTION

All planting materials shall be properly protected against harm from normal weather conditions and the public.

1.8 CLEANUP

Work areas are to be kept clean during progress of work and until completion. Remove surplus materials and rubbish from planting areas. Reclaim access roads and staging areas to pre-planting conditions after plant material installation.

END OF STATEMENT OF WORK

Other files for this federal contract opportunity

Other files attached to Tree Planting & Native Seeding - Rock County, WI, newest first.
File Type Posted
Site Showing Notes Attendees.pdf PDF
Revised Bid Schedule 3-22-10.docx DOCX document
contract clauses.docx DOCX document
avon_rock_plans_specs.pdf PDF
SF-1449.pdf PDF
81-1253_sca.htm HTM file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .