BRH_RetWall_Dwgs_gjk_07252014.pdf

PDF 1 MB Posted

Attached to
Black River Harbor Retaining Wall Improvements Federal contract opportunity
Solicitation number
AG-569R-S-15-0037
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

Attachment A - Drawing/Plans

View the file

Other files for this federal contract opportunity

Other files attached to Black River Harbor Retaining Wall Improvements, newest first.
File Type Posted
brh_amend2_sf_30.pdf PDF
enc2_BRH_SupSpecs_Adendum_gjk_06302015.pdf PDF
amend_continuation.docx DOCX document
BRH_RetWallDwgs_Adendum_06302015.pdf PDF
brh_amend1_sf_30.doc DOC document
enc1_BRH_SchedOfItems_Adendum_gjk_06302015.pdf PDF
General_Decision_Number.pdf PDF
DEQPermit.pdf PDF
AG-569R-S-15-0037.pdf PDF
BRH_ExpPastPerformance_gjk_07252014.docx DOCX document
BRH_SupSpecs_gjk_07252014.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE

No.

Revision/Issue Date

NOTES

FOREST SERVICE

REGION 9

BLACK RIVER HARBOR

Ottawa National Forest Bessemer/Watersmeet/Iron River Ranger District

Quantities & General Notes

C-1.00 01G. Kiaer

M. Bigelow

07/25/14

Not To Scale

Gregory Kiaer, PE

2 6

Civil Engineer, Ottawa National Forest

Revision/Issue Date

NOTES

FOREST SERVICE

REGION 9

BLACK RIVER HARBOR

Ottawa National Forest Bessemer/Watersmeet/Iron River Ranger District

C-2.00 01G. Kiaer

M. Bigelow

07/25/14

1"=20'

Gregory Kiaer, PE

3 6

Civil Engineer, Ottawa National Forest

REMOVE BITUMINOUS

PAVEMENT, 1100 SF

REMOVE 13"x17"

CMP, 21 LF

REMOVE AGGREGATE

SURFACE, 529 SF

REMOVE TIMBER

RETAINING WALL, 461 SF

WATERLINE LOCATION

AS OF 5/6/2014

TEMPORARY DEWATERING

BARRIOR, 540 SF

1. REFER TO SHEET C-1.00 FOR

HORIZONTAL AND VERTICAL

CONTROL DATA.

Feet

0 10 20

2. TEMPORARY DEWATERING

BARRIER SHALL BE INSTALLED

PRIOR DEMOLITION WORK. ALL

WORK ON RETAINING WALL

SHALL BE PERFORMED IN DRY

CONDITIONS.

Revision/Issue Date

NOTES

FOREST SERVICE

REGION 9

CULVERT RPLCMT. (AOP)

W. BRANCH JUMBO RIVER

Ottawa National Forest Kenton Ranger District

Plan & Profile

C-2.01 01G. Kiaer

M. Bigelow

07/25/14

1"=20'

Gregory Kiaer, PE

4 6

Civil Engineer, OttawaNational Forest

Feet

1:240

20100

Revision/Issue Date

NOTES

FOREST SERVICE

REGION 9

BLACK RIVER HARBOR

Ottawa National Forest Bessemer/Watersmeet/Iron River Ranger District

C-3.00 01G. Kiaer

M. Bigelow

7/25/14

As Shown

RETAINING WALL DETAIL

Gregory Kiaer, PE

DETAILS

5 6

Civil Engineer, Ottawa National Forest

TYPICAL GABION WALL SECTION

TYPICAL PIPE TRENCH

RETAINING WALL: STA. 0+00 TO STA. 0+37.6

PATHWAY SECTION

STA. 0+00 TO STA. 0+89.4

STA. 1+89.9 TO STA. 2+12

NOT TO SCALE

NOT TO SCALE

TYPICAL GABION WALL SECTION

RETAINING WALL: STA. 0+37.6 TO STA. 1+37.9

PATHWAY: STA. 0+89.4 TO STA. 1+89.0

NOT TO SCALE

Revision/Issue Date

NOTES

FOREST SERVICE

REGION 9

BLACK RIVER HARBOR

Ottawa National Forest Bessemer/Watersmeet/Iron River Ranger District

Details

C-3.01 01G. Kiaer

M. Bigelow

07/25/14

As Shown

Gregory Kiaer, PE

6 6

Civil Engineer, Ottawa National Forest

STORM SEWER DETAIL

PLAN

SECTION B-B

SECTION A-A

RETAINING WALL BASELINE STA. 0+19.7

NON-REINFORCED CONCRETE

BULK HEAD DETAIL

NOT TO SCALE

1_C-0.01 CoverSht
2_C-1.00 Quant-GenNotes
3_C-2.00 Existing Conditions & Demolition
4_C-2.01 Plan & Profile
5_C-3.0 Details
6 C-3.01 Details

File details come from the government source that posted it. Updated .