AMENDMENT_1_INFORMATION.docx
DOCX document 12 KB Posted
- Attached to
- Albany and Saddle Lake Roads AOPs Federal contract opportunity
- Solicitation number
- AG-52B1-S-16-0034
About this file
Amendment 1 attachment
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ExamplePhotos.zip | ZIP file | |
| amendment_A0001.doc | DOC document | |
| AlbanyRdSaddleMapand_exhibits.zip | ZIP file | |
| quote_document_and_clauses.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 1 INFORMATION
Add the following to the Statement of Work:
Gate Installation and Parking Rehab: The Parking Rehab will be located at mile point 0.97 along Albany Road on the left side of the road. The work consist of shaping and grading the exiting parking area to drain and placing 30 tons of #53 aggregate. The Forest Service will stake the location of the proposed gate to be installed near the parking area. The proposed location will require the installation of 3-4 barrier posts, the locations will be based on the detail or as staked by the FS. The contractor will need to reference the Gate and Barrier post details for sizes and material types.
Add the following to the Optional Item information:
For the Saddle Lake portion the Contractor is responsible for transporting the trees and logs from Indian-Celina Recreation area.