Atch_3_FINAL__7_29_2016_USFS_Appalachian_Work_Center_Drawings_S1.0_through_E2.1.pdf

PDF 7 MB Posted

Attached to
Appalachain Ranger District Work Center Federal contract opportunity
Solicitation number
AG-4670-S-16-0188
Issued by
Department of Agriculture Forest Service

About this file

Atch 3 Drawings Part 1

View the file

Other files for this federal contract opportunity

Other files attached to Appalachain Ranger District Work Center, newest first.
File Type Posted
Amendment_01.pdf PDF
Solicitation_appalachiam_Work_center.pdf PDF
ATch_3_FINAL__7_29_2016_USFS_Appalachian_Work_Center_Drawings_G0.0_through_A4.5pdf.pdf PDF
ATch_2_USFS_Appalachain_WC_Specs.pdf PDF
attach_14_5.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

F

WH

PF

S

S

S

S

6"ø

EWH-1

6"ø

6"ø

6"ø

T

T

T

T

IUH-2

IUH-1

IUH-3

IUH-4

CEILING MOUNTED EXHAUST

FAN. ROUTE EXHAUST DUCTWORK

BETWEEN WOOD JOISTS ABOVE

CEILING TO EXHAUST CAP. SEE

DETAIL 1/M0.2. TYPICAL

FULL RECESSED ELECTRIC WALL

HEATER WITH INTEGRAL THERMOSTAT.

TYPICAL

WORKROOM

TOILET

HALL

JANITOR

SHOWER

TOILET

BREAK

VEHICLE

BAY

STORAGE

STORAGE

6"ø

6"ø

6"ø

6"ø

6"ø

6"ø6"ø6"ø

CCCCffff

A

CCCCffff

A

CCCCffff

A

CCCCffff

A

CCCCffff

A

CCCCffff

A

100CCCCffff

A

100CCCCffff

A

CCCCffff

B

150CCCCffff

B

CCCCffff

B

EF-4

EF-5

EF-6

EF-7

CU-1

HEAT PUMP CONDENSING UNIT MOUNTED

ON 6" TALL CONCRETE EQUIPMENT PAD.

SEE DETAIL 4/M0.2

S S

EF-2

EF-3

S

EF-1

8"Ø RETURN FROM ABOVE TO SERVE

CEILING MOUNTED RETURN GRILLE.

TYPICAL WHERE SHOWN.

6"Ø SUPPLY FROM ABOVE TO SERVE

CEILING MOUNTED SUPPLY REGISTERS.

TYPICAL WHERE SHOWN.

6"Ø SUPPLY FROM ABOVE TO SERVE

CEILING MOUNTED SUPPLY REGISTERS.

TYPICAL WHERE SHOWN.

R

SLEEVE REFRIGERANT PIPING INTO

EXTERIOR WALL AND CAULK PIPE

SLEEVE WATERTIGHT. REFRIGERANT

PIPING UP IN EXTERIOR WALL.

M1.2

Sheet Title

D E

S C

R

IP

T

IO

N M

A R

K

PROJECT NO:

CHECKED BY:

DRAWN BY:

D A

T E

U .S

F

O R

E S

T S

E R

V

IC

E S

O U

T H

E R

N R

E G

IO

N

C O

N S

D

O C

S

R A

N D

Y L

W

A R

B

IN

G T

O N

R

E G

IO

N

A L E

N G

IN

E

E R

/1

/1

/1

/2

:3 :1

A

M J

\1

U

S F

S A p p a la ch ia n W o rk

C e n te r\ D ra w in g s\

M e c h M o d e l.

rv t

M1.1

HVAC FLOOR PLAN

14060

JMF

VLM

A P

P A

L A

C H

IA

N

W O

R K

C E

N T

E R

M

A N

O R

R O

A D

M A

R S

H

IL

L N

C

3/16" = 1'-0"M1.1

1 HVAC FLOOR PLAN

CF-1

CF-2

EF-2EF-1

EF-3

DSS-1

DSS-1

MOD

MOD

24x40 INTAKE LOUVER WITH MOTOR

OPERATED DAMPER. INTERLOCK DAMPER

TO OPEN WHEN EF-1 ENERGIZES.

40x24 EXHAUST LOUVER. REFER TO

ARCHITECTURAL DRAWINGS FOR

EXACT LOCATION OF LOUVER.

40x40 EXHAUST LOUVER. REFER TO

ARCHITECTURAL DRAWINGS FOR EXACT

LOCATION OF LOUVER.

HIGH WALL DUCTLESS SPLIT SYSTEM

INDOOR EVAPORATOR UNIT.

66x66 INTAKE LOUVER WITH MOTOR

OPERATED DAMPER. INTERLOCK

DAMPER TO OPEN WHEN EF-2 AND/OR

EF-3 ENERGIZES.

40x40 EXHAUST LOUVER. REFER TO

ARCHITECTURAL DRAWINGS FOR

EXACT LOCATION OF LOUVER.

NATURAL GAS FIRED HIGH INTENSITY

INFRARED UNIT HEATER. SEE SHEET M1.1

FOR THERMOSTAT LOCATIONS BELOW.

TYPICAL

CEILING FAN MOUNTED TO STRUCTURE

ABOVE. MOUNT FAN IN STRICT

ACCORDANCE WITH THE

MANUFACTURER'S RECOMMENDATIONS.

TYPICAL FOR TWO

EQUIPMENT

PLATFORM

2" PVC FLUE AND COMBUSTION AIR

DUCTS CONNECTED TO 2" SIDEWALL PVC

CONCENTRIC TERMINATION KIT. SEE

DETAIL 7/M0.2

WALL MOUNTED PROPELLER EXHAUST

FANS. SEE DETAIL 2/M0.2. REFER TO

SHEET M1.1 FOR SWITCH LOCATIONS

BELOW.

WALL MOUNTED PROPELLER EXHAUST

FANS. SEE DETAIL 2/M0.2. REFER TO

SHEET M1.1 FOR SWITCH LOCATIONS

BELOW.

WALL MOUNTED PROPELLER EXHAUST

FAN. SEE DETAIL 2/M0.2. REFER TO

SHEET M1.1 FOR SWITCH LOCATION

BELOW.

6"Ø SUPPLY DUCT DOWN BETWEEN

FLOOR JOISTS TO SERVE SPACE

BELOW. PROVIDE MVD ABOVE

MEZZANINE. TYPICAL

8"Ø RETURN DUCT DOWN BETWEEN

FLOOR JOISTS TO SERVE SPACE BELOW.

PROVIDE MVD ABOVE MEZZANINE.

TYPICAL

VERTICAL FURNACE AND DX COOLING

COIL MOUNTED ON PLENUM RETURN

STAND. SEE DETAIL 3/M0.2

6"ø

8"x8"

10"x8"

6"ø

6"ø

12"x12"

10"x10"

10"x8"

8"x10"8"x8"6"ø

8"ø

10"x10"

6"ø

R

R

R

R

REFRIGERANT PIPING FROM BELOW.

PROVIDE LINED SUPPLY AND RETURN

DUCTWORK WITHIN FIRST 15 FEET OF

UNIT DUCT CONNECTIONS.

PROVIDE LINED SUPPLY AND RETURN

DUCTWORK WITHIN FIRST 15 FEET OF

UNIT DUCT CONNECTIONS.

IUH-1

IUH-2

IUH-3

IUH-4

AC-1/CC-1

M1.2

10x8 INTAKE LOUVER WITH MOTOR

OPERATED DAMPER. INTERLOCK

DAMPER TO OPEN WHEN AC-1

ENERGIZES.

MOD

8"ø

MVD

MVD

DSS-1

AC-1/CC-1

EF-3

DSS-1

6"ø

6"ø

6"ø

"x

10"x10"

6"ø

6"ø 40"x40"

10"x10"

10"x8"

8"x8"6"ø

8x8 SUPPLY AND 8"Ø RETURN

ROUTED IN BACKGROUND

10x10 SUPPLY AND 10x10 RETURN

ROUTED IN BACKGROUND

8x10 SUPPLY AND 10x10 RETURN

ROUTED IN BACKGROUND

"x

2"Ø FLUE AND COMBUSTION AIR

DUCTS ROUTED TO CONCENTRIC

TERMINATION KIT.

EF-4 EF-5 EF-6

CCCCffff

A

100 CCCCffff

A

100 CCCCffff

A

75 CCCCffff

A

50 CCCCffff

A

MVD

MVD

8"x10"

MVD MVD MVD MVD MVD

Sheet Title

D E

S C

R

IP

T

IO

N M

A R

K

PROJECT NO:

CHECKED BY:

DRAWN BY:

D A

T E

U .S

F

O R

E S

T S

E R

V

IC

E S

O U

T H

E R

N R

E G

IO

N

C O

N S

D

O C

S

R A

N D

Y L

W

A R

B

IN

G T

O N

R

E G

IO

N

A L E

N G

IN

E

E R

/1

/1

/1

/2

:3 :2

A

M J

\1

U

S F

S A p p a la ch ia n W o rk

C e n te r\ D ra w in g s\

M e c h M o d e l.

rv t

M1.2

HVAC MEZZANINE

FLOOR PLAN

14060

Author

Checker

A P

P A

L A

C H

IA

N

W O

R K

C E

N T

E R

M

A N

O R

R O

A D

M A

R S

H

IL

L N

C

3/16" = 1'-0"M1.2

1 HVAC MEZZANINE FLOOR PLAN

3/16" = 1'-0"M1.2

2 MECHANICAL MEZZANINE SECTION

FD-2

FD-1

P-1A

P-3 P-2

FD-1

P-1A P-3 P-2

FD-2

P-4

P-6A

P-6

P-5

P-10

P-9

FCO-1

4"S U/G. FOR CONT

SEE CIVIL DWGS.

FOR PIPE SIZES SEE RISER DIAGRAM 1/P3.1.

1-1/2"V UP. FOR CONT SEE 1/P1.2

1-1/2"V UP. FOR CONT SEE 1/P1.2

1-1/2"V UP. FOR CONT SEE 1/P1.2

2"V UP. FOR CONT SEE 1/P1.2

1-1/2"V UP. FOR CONT SEE 1/P1.2

VEHICLE

BAY

WORKROOM

TOILET

JANITOR

SHOWER

BREAK

W/D

TOILET

TOOLS

HALL

3/4"CD UP. FOR CONT SEE 1/P1.2

3/4"CD UP. FOR CONT SEE 1/P1.2

GCO

3/4"CW UP IN WALL. EXTEND AND CONNECT

TO NFWH. FOR CONT SEE 1/P1.2.

1/2" CW&HW DN IN WALL TO WATER SUPPLY

BOX P-9.FOR DETAIL SEE 3/P0.1.

1/2" CW&HW DN IN WALL. EXTEND AND CONNECT

TO THE FIXTURES AS SHOWN. PROVIDE CHROME

PLATED QUARTER TURN ANGLED STOPS,

ESCUTCHEONS AND SUPPLIES.

3/4"CW DN IN WALL. EXTEND AND CONNECT TO THE

FIXTURES AS SHOWN. PROVIDE CHROME PLATED

QUARTER TURN ANGLED STOPS, ESCUTCHEONS

AND SUPPLIES.

1" CW&HW DN TO WATER HEATER. FOR DETAIL SEE

5/P0.1.

1"G UP. FOR CONT SEE 1/P1.2.

1-1/4" CW SERVICE AND SHUT-VALVE ROUTE CW

FROM B/G. SLEEVE THROUGH FLOOR WITH WATER

TIGHT SEAL. FOR DETAIL SEE 4/P0.1.

1/2" CW&HW DN IN WALL. EXTEND AND

CONNECT TO EEW MIXING VALVE. CONNECT

MIXING VALVE TO EEW. INSTALL PER

MANUFACTURER'S INSTRUCTIONS.

1/2" CW&HW DN IN WALL. EXTEND AND CONNECT

TO THE SHOWER MIXING VALVE P-10.

1/2"CW DN IN WALL TO WATER SUPPLY BOX

P-8.FOR DETAIL SEE 3/P0.1.

3/4"CW DN IN WALL. EXTEND AND CONNECT

TO THE FIXTURES AS SHOWN. PROVIDE

QUARTER TURN ANGLED STOP AND SUPPLY

TO P-5. 1/2"CW IN WALL TO WATER SUPPLY

BOX P-8.FOR DETAIL SEE 3/P0.1.

3/4"CW UP IN WALL. FOR CONT SEE 1/P1.2

PROPOSED GAS METER

ASSEMBLY. 246MBH @ 7"WC

1-1/2"G UP. FOR CONT

SEE 1/P1.2.

1-1/4" CW SERVICE B/G. SEE CONT THE CIVIL DWGS.

P-1A

P-3 P-2

P-1A P-3 P-2

P-4

P-6A

P-6

P-5

P-10

P-9

GAS LINE U/G TO PROPANE TANK.

FOR CONT SEE CIVIL DWGS. TANK

AND LINE BY OTHERS.

FOR PIPE SIZES SEE RISER DIAGRAM 2/P3.1.

3/4"CW DN IN WALL. EXTEND AND CONNECT TO THE

FIXTURES AS SHOWN. PROVIDE CHROME PLATED

QUARTER TURN ANGLED STOPS, ESCUTCHEONS

AND SUPPLIES.

P-8

NFWH

Sheet Title

D E

S C

R

IP

T

IO

N M

A R

K

PROJECT NO:

CHECKED BY:

DRAWN BY:

D A

T E

U .S

F

O R

E S

T S

E R

V

IC

E S

O U

T H

E R

N R

E G

IO

N

C O

N S

D

O C

S

R A

N D

Y L

W

A R

B

IN

G T

O N

R

E G

IO

N

A L E

N G

IN

E

E R

/1

/1

/1

/2

:3 :3

A

M J

\1

U

S F

S A p p a la ch ia n W o rk

C e n te r\ D ra w in g s\

P lb g M o d e l.

rv t

P1.1

PLUMBING

SANITARY &

DOMESTIC WATER

FLOOR PLANS

14060

JSA

VLM

A P

P A

L A

C H

IA

N

W O

R K

C E

N T

E R

M

A N

O R

R O

A D

M A

R S

H

IL

L N

C

3/16" = 1'-0"P1.1

1 LEVEL 1 FLOOR PLAN - SANITARY

3/16" = 1'-0"P1.1

2 LEVEL 1 FLOOR PLAN - WATER

1"G DN. FOR CONT SEE 1/P1.1

1"G DN. EXTEND AND CONNECT

TO FURNACE. (60MBH)

3/4"G . EXTEND AND CONNECT

TO HEATER. (21.5MBH)

3/4"G . EXTEND AND CONNECT

TO HEATER. (21.5MBH)

3/4"G . EXTEND AND CONNECT

TO HEATER. (21.5MBH)

3/4"G . EXTEND AND CONNECT

TO HEATER. (21.5MBH)

1-1/2"G DN. FOR CONT SEE 1/P1.1.

3/4"

1 1/2" 1 1/2"

1 1/4"

1"CA LINE. EXTEND AND CONNECT

TO AIR COMPRESSOR (N.I.C.)

3/4" CA&CW LINE. EXTEND AND

CONNECT TO HOSE REEL. FOR

DETAIL SEE 8/P0.1, TYP OF 4.

3/4"

3/4"

HR

HR

HR

HR

3/4"CW DN. FOR CONT SEE 1/P1.1.

3/4"CW DN. FOR CONT SEE 1/P1.1.

1-1/2"V DN. FOR CONT SEE 1/P1.1

1-1/2"V DN. FOR CONT SEE 1/P1.1

1-1/2"V DN. FOR CONT SEE 1/P1.1

2"V DN. FOR CONT SEE 1/P1.1

1-1/2"V DN. FOR CONT SEE 1/P1.1

3"V UP AND 3"VTR

3/4"CD DN. FOR CONT SEE 1/P1.1

3/4"CD DN. FOR CONT SEE 1/P1.1

Sheet Title

D E

S C

R

IP

T

IO

N M

A R

K

PROJECT NO:

CHECKED BY:

DRAWN BY:

D A

T E

U .S

F

O R

E S

T S

E R

V

IC

E S

O U

T H

E R

N R

E G

IO

N

C O

N S

D

O C

S

R A

N D

Y L

W

A R

B

IN

G T

O N

R

E G

IO

N

A L E

N G

IN

E

E R

/1

/1

/1

/2

:3 :4

A

M J

\1

U

S F

S A p p a la ch ia n W o rk

C e n te r\ D ra w in g s\

P lb g M o d e l.

rv t

P1.2

PLUMBING VENT,

DOMESTIC WATER

& GAS - MEZZANINE

14060

Author

Checker

A P

P A

L A

C H

IA

N

W O

R K

C E

N T

E R

M

A N

O R

R O

A D

M A

R S

H

IL

L N

C

3/16" = 1'-0"P1.2

1 LEVEL 2 FLOOR PLAN - MEZZANINE

3"

1 1/2"

4"

3"

3" 3"

3"

4"

1 1/2"

1 1/2"

3"

3"3"

4"

1 1/2"

1 1/2"

3"3"

2"

4"

1 1/2"

1 1/2"

1 1/2"

2"

2"

1 1/2"

2" 3"

2"

3"

3/4"

3/4"

3/4"

3"VTR

P-4

P-1

P-6A

P-3

P-2P-5

FD-2

P-1

P-2

P-10 P-3

P-6

P-9

FD-1

FD-1

FD-2

3/4"

3/4"

3/4"

3/4"

1/2"

1/2"

3/4"

1/2"

3/4"

1/2"

1/2"

1 1/4"

1"1"

1/2"1/2"

1 1/4"

1" 1/2"

1/2"

1/2"

3/4"

1/2"

1/2"

1/2"

3/4"

1/2"1/2" 3/4"

3/4"

1/2"

1"

1/2"1/2"

HR

HR

NFWH

P-9

P-9

P-9

P-4 WHE-1

P-1

P-6A

P-3

P-2

P-5

P-6

P-10

P-5P-8

Sheet Title

D E

S C

R

IP

T

IO

N M

A R

K

PROJECT NO:

CHECKED BY:

DRAWN BY:

D A

T E

U .S

F

O R

E S

T S

E R

V

IC

E S

O U

T H

E R

N R

E G

IO

N

C O

N S

D

O C

S

R A

N D

Y L

W

A R

B

IN

G T

O N

R

E G

IO

N

A L E

N G

IN

E

E R

/1

/1

/1

/2

:3 :4

A

M J

\1

U

S F

S A p p a la ch ia n W o rk

C e n te r\ D ra w in g s\

P lb g M o d e l.

rv t

P3.1

PLUMBING

SANITARY &

DOMESTIC WATER

RISER DIAGRAM

14060

JSA

VLM

A P

P A

L A

C H

IA

N

W O

R K

C E

N T

E R

M

A N

O R

R O

A D

M A

R S

H

IL

L N

C

P3.1

1 PLUMBING SANITARY RISER DIAGRAMP3.1

2 PLUMBING DOMESTIC WATER RISER DIAGRAM

ABBREVIATIONS

GENERAL NOTES

SYMBOLS LEGEND

SCALE: SCHEMATIC ONLY

E0.1

DEDICATED WORKING CLEARANCES OF

ELECTRICAL EQUIPMENT

Sheet Title

U S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

N

G

I O

N

P

M J

U

S F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s

M e c h o d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

O

A

D

M A

H

I L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.1

ELECTRICAL

SYMBOLS LEGEND,

ABBREVIATIONS &

GENERAL NOTES

MW

HN

Sheet Title

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.2

ELECTRICAL

SITE PLAN

MW

HN

GENERAL SITE CONSTRUCTION NOTES:

KEY NOTES:

SCALE: 1"= 30'-0"

E0.2

ELECTRICAL SITE PLAN

SCALE: SCHEMATIC ONLY

E0.3

ELECTRICAL ONE LINE DIAGRAM

SCALE: SCHEMATIC ONLY

E0.3

TYPICAL SERVICE GROUNDING DIAGRAM

M

ELECTRICAL ONE LINE GENERAL NOTES

ELECTRICAL ONE LINE KEY NOTES .

Sheet Title

U S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.3

ELECTRICAL

ONE LINE DIAGRAM,

SCHEDULES,

LEGEND & DETAILS

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.4

ELECTRICAL

SCHEDULES AND

DETAILS

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.5

ELECTRICAL

PANEL SCHEDULES,

MECHANICAL

EQUIPMENT

ELECTRICAL

CONNECTION

SCHEDULE & NOTES

MW

HN

SCALE: SCHEMATIC ONLY

E0.5

TYPICAL LIGHTING CONTACTOR

TIME CLOCK CONTROL SYSTEM DETAIL

LIGHTING CONTROL SYMBOL

LEGEND

KEYNOTES:

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.6

ELECTRICAL

DETAILS

MW

HN

KEY NOTES:

SCALE: NTS

E0.6

SECURITY SYSTEMS DETAIL

KEY NOTES:

SCALE: NTS

E0.6

COMMUNICATIONS STRUCTURED

CABLING RISER DIAGRAM

SCALE: NTS

E0.6

CONDUIT SUPPORT FOR SURFACE-MOUNTED PANELS

SCALE: NTS

E0.6

WALL-MOUNTED PANELBOARD MOUNTING

SCALE: NTS

E0.6

FIRE ALARM RISER DIAGRAM

GENERAL NOTES:

GENERAL NOTES:

SCALE: NTS

E0.6

RV SITE POWER PEDESTAL

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.7

ELECTRICAL

DETAILS

MW

HN

SCALE: NTS

E0.7

SERVICE GEAR ELEVATIONS

SCALE: NTS

E0.7

MDP MOUNTING BOARD FRAMING DETAILS

S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E0.8

ELECTRICAL

DETAILS

WH

E

F

01E

01B01A

01D 01C

03B

03C

VEHICLE

BAY

TOOLS

STORAGE

TOILET

JANITOR

SHOWER

HALL

TOILET

WORKROOM

BREAK

STORAGE

W/D

01F

03G

WHG

SCALE: 3/16" = 1'-0"

E1.1

ELECTRICAL POWER & SYSTEMS PLAN - GROUND LEVEL

KEY NOTES:

GENERAL NOTES:

EF

EWH

X

Y

CU

EF

EF

EF

D

Sheet Title

U S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E1.1

ELECTRICAL

POWER &

SYSTEMS PLAN

GROUND LEVEL

MEZZANINE

MEZZANINE

AFF7' - 6" GYP

AFF7' - 6" GYP

AFF7' - 6" GYP

AFF7' - 6" GYP

AFF7' - 6" GYP

AFF7' - 6" GYP

AFF7' - 6" GYP

TELCOM

AFF15' - 11 3/8" PLY

IUH

IUH

IUH

IUH

CF

CF

VEHICLE BAY

(BELOW)

SCALE: 3/16" = 1'-0"

E2.1

ELECTRICAL LIGHTING, POWER AND SYSTEMS PLAN - MEZZANINE LEVEL

SCALE: 3/16" = 1'-0"

E2.1

ELECTRICAL LIGHTING PLAN -

GROUND LEVEL (BELOW MEZZANINE)

EF

EF

EF

MOD

KEY NOTES:

GENERAL NOTES:

X

Y

MOD

DSS

DSS

AC-1

CC-1

Sheet Title

U S

F

O R

E S

T

S

E R

V I C

E

S O

U T

H E

G

I O

N

P

M J

F

S

A p p a l a c h i a n

W o r k

C e n t e r D r a w i n g s d e l r v t

A P

P A

L A

C H

I A

N

W

O R

K

C

E N

T E

R

M

A N

A

D

M A

L L

N

C

DRAWN BY:

CHECKED BY:

PROJECT NO:

14060

M A

R K

D A

T E

D E

S C

R I P

T I O

N

Tel. 770.414.1628 Fax 770.414.6024

SBE Project No. 1 4 1 3 4

Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com

C O

N S

D

O C

S

P A

B L

O

C

R U

Z

P

E

D I R

E C

T O

R

O

F

E

N G

I N

E E

R I N

G

A R C H I T E C T S , LLC

621 NORTH AVENUE, NE

SUITE C-140

ATLANTA, GA 30308

404.892.2443 voice

404.892.2470 facsimile mail@smithdalia.com

E2.1

ELECTRICAL

LIGHTING PLAN

GROUND &

MEZZANINE

LEVELS

FINAL_ 7_29_2016_USFS Appalachian Work Center Drawings
FINAL_ 160418_USFS Appalachian Work Center Drawings
00_General Binder
G0-0 - INDEX SHEET
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
G0-1 - CODE INFORMATION LIFE SAFETY PLAN
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
02_Civil Binder
01_Architecture Binder
A0-1 - WALL TYPES
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A0-2 - DOOR SCHEDULE AND DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A0-3 - FINISH SCHEDULES
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A1-0 - SLAB PLAN
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A1-1 - FLOOR PLAN
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A1-2 - EQUIPMENT PLATFORM FLOOR PLAN
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A1-3 - REFLECTED CEILING PLAN
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A1-4 - ROOF PLAN AND DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A2-1 - EXTERIOR ELEVATIONS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A2-2 - BUILDING SECTIONS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A2-3 - BUILDING SECTIONS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A3-1 - INTERIOR ELEVATIONS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A4-1 - DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A4-2 - DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A4-3 - DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A4-4 - MILLWORK
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
A4-5 - INTERIOR DETAILS
Sheets
A0.1 - WALL TYPES
A0.2 - DOOR SCHEDULE AND DETAILS
A0.3 - FINISH SCHEDULES
A1.0 - SLAB PLAN
A1.1 - FLOOR PLAN
A1.2 - EQUIPMENT PLATFORM FLOOR PLAN
A1.3 - REFLECTED CEILING PLAN
A1.4 - ROOF PLAN AND DETAILS
A2.1 - EXTERIOR ELEVATIONS
A2.2 - BUILDING SECTIONS
A2.3 - BUILDING SECTIONS
A3.1 - INTERIOR ELEVATIONS
A4.1 - DETAILS
A4.2 - DETAILS
A4.3 - DETAILS
A4.4 - MILLWORK
A4.5 - INTERIOR DETAILS
G0.0 - INDEX SHEET
G0.1 - CODE INFORMATION LIFE SAFETY PLAN
04_Mechanical Binder
M0.1
M0.2
M1.1
M1.2
05_Plumbing Binder
P0.1
P1.1
P1.2
P3.1
P4.1
06_Electrical Binder
E0.1
E0.2
E0.3
E0.4
E0.5
E0.6
E0.7
E0.8
E1.1
E2.1
A0-1 - WALL TYPES REV
A-1.1 REV
A1-0 - SLAB PLAN REV
A2.1 pdf
A2.2 REV
A2.3 REV
A4-1 - DETAILS REV
A4-2 - DETAILS REV
S 4.2 Pole Shed Footing
S-1.0 REV
S-1.2 REV
S-1.3 REV
S-3.1 REV
S-4.1 REV

G0.0 REV

File details come from the government source that posted it. Updated .