Atch_3_FINAL__7_29_2016_USFS_Appalachian_Work_Center_Drawings_S1.0_through_E2.1.pdf
PDF 7 MB Posted
- Attached to
- Appalachain Ranger District Work Center Federal contract opportunity
- Solicitation number
- AG-4670-S-16-0188
- Issued by
- Department of Agriculture Forest Service
About this file
Atch 3 Drawings Part 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_01.pdf | ||
| Solicitation_appalachiam_Work_center.pdf | ||
| ATch_3_FINAL__7_29_2016_USFS_Appalachian_Work_Center_Drawings_G0.0_through_A4.5pdf.pdf | ||
| ATch_2_USFS_Appalachain_WC_Specs.pdf | ||
| attach_14_5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R E
F
WH
PF
S
S
S
S
6"ø
EWH-1
6"ø
6"ø
6"ø
T
T
T
T
IUH-2
IUH-1
IUH-3
IUH-4
CEILING MOUNTED EXHAUST
FAN. ROUTE EXHAUST DUCTWORK
BETWEEN WOOD JOISTS ABOVE
CEILING TO EXHAUST CAP. SEE
DETAIL 1/M0.2. TYPICAL
FULL RECESSED ELECTRIC WALL
HEATER WITH INTEGRAL THERMOSTAT.
TYPICAL
WORKROOM
TOILET
HALL
JANITOR
SHOWER
TOILET
BREAK
VEHICLE
BAY
STORAGE
STORAGE
6"ø
6"ø
6"ø
6"ø
6"ø
6"ø6"ø6"ø
CCCCffff
A
CCCCffff
A
CCCCffff
A
CCCCffff
A
CCCCffff
A
CCCCffff
A
100CCCCffff
A
100CCCCffff
A
CCCCffff
B
150CCCCffff
B
CCCCffff
B
EF-4
EF-5
EF-6
EF-7
CU-1
HEAT PUMP CONDENSING UNIT MOUNTED
ON 6" TALL CONCRETE EQUIPMENT PAD.
SEE DETAIL 4/M0.2
S S
EF-2
EF-3
S
EF-1
8"Ø RETURN FROM ABOVE TO SERVE
CEILING MOUNTED RETURN GRILLE.
TYPICAL WHERE SHOWN.
6"Ø SUPPLY FROM ABOVE TO SERVE
CEILING MOUNTED SUPPLY REGISTERS.
TYPICAL WHERE SHOWN.
6"Ø SUPPLY FROM ABOVE TO SERVE
CEILING MOUNTED SUPPLY REGISTERS.
TYPICAL WHERE SHOWN.
R
SLEEVE REFRIGERANT PIPING INTO
EXTERIOR WALL AND CAULK PIPE
SLEEVE WATERTIGHT. REFRIGERANT
PIPING UP IN EXTERIOR WALL.
M1.2
Sheet Title
D E
S C
R
IP
T
IO
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
U .S
F
O R
E S
T S
E R
V
IC
E S
O U
T H
E R
N R
E G
IO
N
C O
N S
D
O C
S
R A
N D
Y L
W
A R
B
IN
G T
O N
R
E G
IO
N
A L E
N G
IN
E
E R
/1
/1
/1
/2
:3 :1
A
M J
\1
U
S F
S A p p a la ch ia n W o rk
C e n te r\ D ra w in g s\
M e c h M o d e l.
rv t
M1.1
HVAC FLOOR PLAN
14060
JMF
VLM
A P
P A
L A
C H
IA
N
W O
R K
C E
N T
E R
M
A N
O R
R O
A D
M A
R S
H
IL
L N
C
3/16" = 1'-0"M1.1
1 HVAC FLOOR PLAN
CF-1
CF-2
EF-2EF-1
EF-3
DSS-1
DSS-1
MOD
MOD
24x40 INTAKE LOUVER WITH MOTOR
OPERATED DAMPER. INTERLOCK DAMPER
TO OPEN WHEN EF-1 ENERGIZES.
40x24 EXHAUST LOUVER. REFER TO
ARCHITECTURAL DRAWINGS FOR
EXACT LOCATION OF LOUVER.
40x40 EXHAUST LOUVER. REFER TO
ARCHITECTURAL DRAWINGS FOR EXACT
LOCATION OF LOUVER.
HIGH WALL DUCTLESS SPLIT SYSTEM
INDOOR EVAPORATOR UNIT.
66x66 INTAKE LOUVER WITH MOTOR
OPERATED DAMPER. INTERLOCK
DAMPER TO OPEN WHEN EF-2 AND/OR
EF-3 ENERGIZES.
40x40 EXHAUST LOUVER. REFER TO
ARCHITECTURAL DRAWINGS FOR
EXACT LOCATION OF LOUVER.
NATURAL GAS FIRED HIGH INTENSITY
INFRARED UNIT HEATER. SEE SHEET M1.1
FOR THERMOSTAT LOCATIONS BELOW.
TYPICAL
CEILING FAN MOUNTED TO STRUCTURE
ABOVE. MOUNT FAN IN STRICT
ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
TYPICAL FOR TWO
EQUIPMENT
PLATFORM
2" PVC FLUE AND COMBUSTION AIR
DUCTS CONNECTED TO 2" SIDEWALL PVC
CONCENTRIC TERMINATION KIT. SEE
DETAIL 7/M0.2
WALL MOUNTED PROPELLER EXHAUST
FANS. SEE DETAIL 2/M0.2. REFER TO
SHEET M1.1 FOR SWITCH LOCATIONS
BELOW.
WALL MOUNTED PROPELLER EXHAUST
FANS. SEE DETAIL 2/M0.2. REFER TO
SHEET M1.1 FOR SWITCH LOCATIONS
BELOW.
WALL MOUNTED PROPELLER EXHAUST
FAN. SEE DETAIL 2/M0.2. REFER TO
SHEET M1.1 FOR SWITCH LOCATION
BELOW.
6"Ø SUPPLY DUCT DOWN BETWEEN
FLOOR JOISTS TO SERVE SPACE
BELOW. PROVIDE MVD ABOVE
MEZZANINE. TYPICAL
8"Ø RETURN DUCT DOWN BETWEEN
FLOOR JOISTS TO SERVE SPACE BELOW.
PROVIDE MVD ABOVE MEZZANINE.
TYPICAL
VERTICAL FURNACE AND DX COOLING
COIL MOUNTED ON PLENUM RETURN
STAND. SEE DETAIL 3/M0.2
6"ø
8"x8"
10"x8"
6"ø
6"ø
12"x12"
10"x10"
10"x8"
8"x10"8"x8"6"ø
8"ø
10"x10"
6"ø
R
R
R
R
REFRIGERANT PIPING FROM BELOW.
PROVIDE LINED SUPPLY AND RETURN
DUCTWORK WITHIN FIRST 15 FEET OF
UNIT DUCT CONNECTIONS.
PROVIDE LINED SUPPLY AND RETURN
DUCTWORK WITHIN FIRST 15 FEET OF
UNIT DUCT CONNECTIONS.
IUH-1
IUH-2
IUH-3
IUH-4
AC-1/CC-1
M1.2
10x8 INTAKE LOUVER WITH MOTOR
OPERATED DAMPER. INTERLOCK
DAMPER TO OPEN WHEN AC-1
ENERGIZES.
MOD
8"ø
MVD
MVD
DSS-1
AC-1/CC-1
EF-3
DSS-1
6"ø
6"ø
6"ø
"x
10"x10"
6"ø
6"ø 40"x40"
10"x10"
10"x8"
8"x8"6"ø
8x8 SUPPLY AND 8"Ø RETURN
ROUTED IN BACKGROUND
10x10 SUPPLY AND 10x10 RETURN
ROUTED IN BACKGROUND
8x10 SUPPLY AND 10x10 RETURN
ROUTED IN BACKGROUND
"x
2"Ø FLUE AND COMBUSTION AIR
DUCTS ROUTED TO CONCENTRIC
TERMINATION KIT.
EF-4 EF-5 EF-6
CCCCffff
A
100 CCCCffff
A
100 CCCCffff
A
75 CCCCffff
A
50 CCCCffff
A
MVD
MVD
8"x10"
MVD MVD MVD MVD MVD
Sheet Title
D E
S C
R
IP
T
IO
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
U .S
F
O R
E S
T S
E R
V
IC
E S
O U
T H
E R
N R
E G
IO
N
C O
N S
D
O C
S
R A
N D
Y L
W
A R
B
IN
G T
O N
R
E G
IO
N
A L E
N G
IN
E
E R
/1
/1
/1
/2
:3 :2
A
M J
\1
U
S F
S A p p a la ch ia n W o rk
C e n te r\ D ra w in g s\
M e c h M o d e l.
rv t
M1.2
HVAC MEZZANINE
FLOOR PLAN
14060
Author
Checker
A P
P A
L A
C H
IA
N
W O
R K
C E
N T
E R
M
A N
O R
R O
A D
M A
R S
H
IL
L N
C
3/16" = 1'-0"M1.2
1 HVAC MEZZANINE FLOOR PLAN
3/16" = 1'-0"M1.2
2 MECHANICAL MEZZANINE SECTION
FD-2
FD-1
P-1A
P-3 P-2
FD-1
P-1A P-3 P-2
FD-2
P-4
P-6A
P-6
P-5
P-10
P-9
FCO-1
4"S U/G. FOR CONT
SEE CIVIL DWGS.
FOR PIPE SIZES SEE RISER DIAGRAM 1/P3.1.
1-1/2"V UP. FOR CONT SEE 1/P1.2
1-1/2"V UP. FOR CONT SEE 1/P1.2
1-1/2"V UP. FOR CONT SEE 1/P1.2
2"V UP. FOR CONT SEE 1/P1.2
1-1/2"V UP. FOR CONT SEE 1/P1.2
VEHICLE
BAY
WORKROOM
TOILET
JANITOR
SHOWER
BREAK
W/D
TOILET
TOOLS
HALL
3/4"CD UP. FOR CONT SEE 1/P1.2
3/4"CD UP. FOR CONT SEE 1/P1.2
GCO
3/4"CW UP IN WALL. EXTEND AND CONNECT
TO NFWH. FOR CONT SEE 1/P1.2.
1/2" CW&HW DN IN WALL TO WATER SUPPLY
BOX P-9.FOR DETAIL SEE 3/P0.1.
1/2" CW&HW DN IN WALL. EXTEND AND CONNECT
TO THE FIXTURES AS SHOWN. PROVIDE CHROME
PLATED QUARTER TURN ANGLED STOPS,
ESCUTCHEONS AND SUPPLIES.
3/4"CW DN IN WALL. EXTEND AND CONNECT TO THE
FIXTURES AS SHOWN. PROVIDE CHROME PLATED
QUARTER TURN ANGLED STOPS, ESCUTCHEONS
AND SUPPLIES.
1" CW&HW DN TO WATER HEATER. FOR DETAIL SEE
5/P0.1.
1"G UP. FOR CONT SEE 1/P1.2.
1-1/4" CW SERVICE AND SHUT-VALVE ROUTE CW
FROM B/G. SLEEVE THROUGH FLOOR WITH WATER
TIGHT SEAL. FOR DETAIL SEE 4/P0.1.
1/2" CW&HW DN IN WALL. EXTEND AND
CONNECT TO EEW MIXING VALVE. CONNECT
MIXING VALVE TO EEW. INSTALL PER
MANUFACTURER'S INSTRUCTIONS.
1/2" CW&HW DN IN WALL. EXTEND AND CONNECT
TO THE SHOWER MIXING VALVE P-10.
1/2"CW DN IN WALL TO WATER SUPPLY BOX
P-8.FOR DETAIL SEE 3/P0.1.
3/4"CW DN IN WALL. EXTEND AND CONNECT
TO THE FIXTURES AS SHOWN. PROVIDE
QUARTER TURN ANGLED STOP AND SUPPLY
TO P-5. 1/2"CW IN WALL TO WATER SUPPLY
BOX P-8.FOR DETAIL SEE 3/P0.1.
3/4"CW UP IN WALL. FOR CONT SEE 1/P1.2
PROPOSED GAS METER
ASSEMBLY. 246MBH @ 7"WC
1-1/2"G UP. FOR CONT
SEE 1/P1.2.
1-1/4" CW SERVICE B/G. SEE CONT THE CIVIL DWGS.
P-1A
P-3 P-2
P-1A P-3 P-2
P-4
P-6A
P-6
P-5
P-10
P-9
GAS LINE U/G TO PROPANE TANK.
FOR CONT SEE CIVIL DWGS. TANK
AND LINE BY OTHERS.
FOR PIPE SIZES SEE RISER DIAGRAM 2/P3.1.
3/4"CW DN IN WALL. EXTEND AND CONNECT TO THE
FIXTURES AS SHOWN. PROVIDE CHROME PLATED
QUARTER TURN ANGLED STOPS, ESCUTCHEONS
AND SUPPLIES.
P-8
NFWH
Sheet Title
D E
S C
R
IP
T
IO
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
U .S
F
O R
E S
T S
E R
V
IC
E S
O U
T H
E R
N R
E G
IO
N
C O
N S
D
O C
S
R A
N D
Y L
W
A R
B
IN
G T
O N
R
E G
IO
N
A L E
N G
IN
E
E R
/1
/1
/1
/2
:3 :3
A
M J
\1
U
S F
S A p p a la ch ia n W o rk
C e n te r\ D ra w in g s\
P lb g M o d e l.
rv t
P1.1
PLUMBING
SANITARY &
DOMESTIC WATER
FLOOR PLANS
14060
JSA
VLM
A P
P A
L A
C H
IA
N
W O
R K
C E
N T
E R
M
A N
O R
R O
A D
M A
R S
H
IL
L N
C
3/16" = 1'-0"P1.1
1 LEVEL 1 FLOOR PLAN - SANITARY
3/16" = 1'-0"P1.1
2 LEVEL 1 FLOOR PLAN - WATER
1"G DN. FOR CONT SEE 1/P1.1
1"G DN. EXTEND AND CONNECT
TO FURNACE. (60MBH)
3/4"G . EXTEND AND CONNECT
TO HEATER. (21.5MBH)
3/4"G . EXTEND AND CONNECT
TO HEATER. (21.5MBH)
3/4"G . EXTEND AND CONNECT
TO HEATER. (21.5MBH)
3/4"G . EXTEND AND CONNECT
TO HEATER. (21.5MBH)
1-1/2"G DN. FOR CONT SEE 1/P1.1.
3/4"
1 1/2" 1 1/2"
1 1/4"
1"CA LINE. EXTEND AND CONNECT
TO AIR COMPRESSOR (N.I.C.)
3/4" CA&CW LINE. EXTEND AND
CONNECT TO HOSE REEL. FOR
DETAIL SEE 8/P0.1, TYP OF 4.
3/4"
3/4"
HR
HR
HR
HR
3/4"CW DN. FOR CONT SEE 1/P1.1.
3/4"CW DN. FOR CONT SEE 1/P1.1.
1-1/2"V DN. FOR CONT SEE 1/P1.1
1-1/2"V DN. FOR CONT SEE 1/P1.1
1-1/2"V DN. FOR CONT SEE 1/P1.1
2"V DN. FOR CONT SEE 1/P1.1
1-1/2"V DN. FOR CONT SEE 1/P1.1
3"V UP AND 3"VTR
3/4"CD DN. FOR CONT SEE 1/P1.1
3/4"CD DN. FOR CONT SEE 1/P1.1
Sheet Title
D E
S C
R
IP
T
IO
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
U .S
F
O R
E S
T S
E R
V
IC
E S
O U
T H
E R
N R
E G
IO
N
C O
N S
D
O C
S
R A
N D
Y L
W
A R
B
IN
G T
O N
R
E G
IO
N
A L E
N G
IN
E
E R
/1
/1
/1
/2
:3 :4
A
M J
\1
U
S F
S A p p a la ch ia n W o rk
C e n te r\ D ra w in g s\
P lb g M o d e l.
rv t
P1.2
PLUMBING VENT,
DOMESTIC WATER
& GAS - MEZZANINE
14060
Author
Checker
A P
P A
L A
C H
IA
N
W O
R K
C E
N T
E R
M
A N
O R
R O
A D
M A
R S
H
IL
L N
C
3/16" = 1'-0"P1.2
1 LEVEL 2 FLOOR PLAN - MEZZANINE
3"
1 1/2"
4"
3"
3" 3"
3"
4"
1 1/2"
1 1/2"
3"
3"3"
4"
1 1/2"
1 1/2"
3"3"
2"
4"
1 1/2"
1 1/2"
1 1/2"
2"
2"
1 1/2"
2" 3"
2"
3"
3/4"
3/4"
3/4"
3"VTR
P-4
P-1
P-6A
P-3
P-2P-5
FD-2
P-1
P-2
P-10 P-3
P-6
P-9
FD-1
FD-1
FD-2
3/4"
3/4"
3/4"
3/4"
1/2"
1/2"
3/4"
1/2"
3/4"
1/2"
1/2"
1 1/4"
1"1"
1/2"1/2"
1 1/4"
1" 1/2"
1/2"
1/2"
3/4"
1/2"
1/2"
1/2"
3/4"
1/2"1/2" 3/4"
3/4"
1/2"
1"
1/2"1/2"
HR
HR
NFWH
P-9
P-9
P-9
P-4 WHE-1
P-1
P-6A
P-3
P-2
P-5
P-6
P-10
P-5P-8
Sheet Title
D E
S C
R
IP
T
IO
N M
A R
K
PROJECT NO:
CHECKED BY:
DRAWN BY:
D A
T E
U .S
F
O R
E S
T S
E R
V
IC
E S
O U
T H
E R
N R
E G
IO
N
C O
N S
D
O C
S
R A
N D
Y L
W
A R
B
IN
G T
O N
R
E G
IO
N
A L E
N G
IN
E
E R
/1
/1
/1
/2
:3 :4
A
M J
\1
U
S F
S A p p a la ch ia n W o rk
C e n te r\ D ra w in g s\
P lb g M o d e l.
rv t
P3.1
PLUMBING
SANITARY &
DOMESTIC WATER
RISER DIAGRAM
14060
JSA
VLM
A P
P A
L A
C H
IA
N
W O
R K
C E
N T
E R
M
A N
O R
R O
A D
M A
R S
H
IL
L N
C
P3.1
1 PLUMBING SANITARY RISER DIAGRAMP3.1
2 PLUMBING DOMESTIC WATER RISER DIAGRAM
ABBREVIATIONS
GENERAL NOTES
SYMBOLS LEGEND
SCALE: SCHEMATIC ONLY
E0.1
DEDICATED WORKING CLEARANCES OF
ELECTRICAL EQUIPMENT
Sheet Title
U S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
N
G
I O
N
P
M J
U
S F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s
M e c h o d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
O
A
D
M A
H
I L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.1
ELECTRICAL
SYMBOLS LEGEND,
ABBREVIATIONS &
GENERAL NOTES
MW
HN
Sheet Title
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.2
ELECTRICAL
SITE PLAN
MW
HN
GENERAL SITE CONSTRUCTION NOTES:
KEY NOTES:
SCALE: 1"= 30'-0"
E0.2
ELECTRICAL SITE PLAN
SCALE: SCHEMATIC ONLY
E0.3
ELECTRICAL ONE LINE DIAGRAM
SCALE: SCHEMATIC ONLY
E0.3
TYPICAL SERVICE GROUNDING DIAGRAM
M
ELECTRICAL ONE LINE GENERAL NOTES
ELECTRICAL ONE LINE KEY NOTES .
Sheet Title
U S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.3
ELECTRICAL
ONE LINE DIAGRAM,
SCHEDULES,
LEGEND & DETAILS
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.4
ELECTRICAL
SCHEDULES AND
DETAILS
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.5
ELECTRICAL
PANEL SCHEDULES,
MECHANICAL
EQUIPMENT
ELECTRICAL
CONNECTION
SCHEDULE & NOTES
MW
HN
SCALE: SCHEMATIC ONLY
E0.5
TYPICAL LIGHTING CONTACTOR
TIME CLOCK CONTROL SYSTEM DETAIL
LIGHTING CONTROL SYMBOL
LEGEND
KEYNOTES:
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.6
ELECTRICAL
DETAILS
MW
HN
KEY NOTES:
SCALE: NTS
E0.6
SECURITY SYSTEMS DETAIL
KEY NOTES:
SCALE: NTS
E0.6
COMMUNICATIONS STRUCTURED
CABLING RISER DIAGRAM
SCALE: NTS
E0.6
CONDUIT SUPPORT FOR SURFACE-MOUNTED PANELS
SCALE: NTS
E0.6
WALL-MOUNTED PANELBOARD MOUNTING
SCALE: NTS
E0.6
FIRE ALARM RISER DIAGRAM
GENERAL NOTES:
GENERAL NOTES:
SCALE: NTS
E0.6
RV SITE POWER PEDESTAL
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.7
ELECTRICAL
DETAILS
MW
HN
SCALE: NTS
E0.7
SERVICE GEAR ELEVATIONS
SCALE: NTS
E0.7
MDP MOUNTING BOARD FRAMING DETAILS
S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E0.8
ELECTRICAL
DETAILS
WH
E
F
01E
01B01A
01D 01C
03B
03C
VEHICLE
BAY
TOOLS
STORAGE
TOILET
JANITOR
SHOWER
HALL
TOILET
WORKROOM
BREAK
STORAGE
W/D
01F
03G
WHG
SCALE: 3/16" = 1'-0"
E1.1
ELECTRICAL POWER & SYSTEMS PLAN - GROUND LEVEL
KEY NOTES:
GENERAL NOTES:
EF
EWH
X
Y
CU
EF
EF
EF
D
Sheet Title
U S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E1.1
ELECTRICAL
POWER &
SYSTEMS PLAN
GROUND LEVEL
MEZZANINE
MEZZANINE
AFF7' - 6" GYP
AFF7' - 6" GYP
AFF7' - 6" GYP
AFF7' - 6" GYP
AFF7' - 6" GYP
AFF7' - 6" GYP
AFF7' - 6" GYP
TELCOM
AFF15' - 11 3/8" PLY
IUH
IUH
IUH
IUH
CF
CF
VEHICLE BAY
(BELOW)
SCALE: 3/16" = 1'-0"
E2.1
ELECTRICAL LIGHTING, POWER AND SYSTEMS PLAN - MEZZANINE LEVEL
SCALE: 3/16" = 1'-0"
E2.1
ELECTRICAL LIGHTING PLAN -
GROUND LEVEL (BELOW MEZZANINE)
EF
EF
EF
MOD
KEY NOTES:
GENERAL NOTES:
X
Y
MOD
DSS
DSS
AC-1
CC-1
Sheet Title
U S
F
O R
E S
T
S
E R
V I C
E
S O
U T
H E
G
I O
N
P
M J
F
S
A p p a l a c h i a n
W o r k
C e n t e r D r a w i n g s d e l r v t
A P
P A
L A
C H
I A
N
W
O R
K
C
E N
T E
R
M
A N
A
D
M A
L L
N
C
DRAWN BY:
CHECKED BY:
PROJECT NO:
14060
M A
R K
D A
T E
D E
S C
R I P
T I O
N
Tel. 770.414.1628 Fax 770.414.6024
SBE Project No. 1 4 1 3 4
Norcross, Georgia 30092 5655 Peachtree Parkway, Suite 100 www.spencerbristol.com
C O
N S
D
O C
S
P A
B L
O
C
R U
Z
P
E
D I R
E C
T O
R
O
F
E
N G
I N
E E
R I N
G
A R C H I T E C T S , LLC
621 NORTH AVENUE, NE
SUITE C-140
ATLANTA, GA 30308
404.892.2443 voice
404.892.2470 facsimile mail@smithdalia.com
E2.1
ELECTRICAL
LIGHTING PLAN
GROUND &
MEZZANINE
LEVELS
| FINAL_ 7_29_2016_USFS Appalachian Work Center Drawings |
| FINAL_ 160418_USFS Appalachian Work Center Drawings |
| 00_General Binder |
| G0-0 - INDEX SHEET |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| G0-1 - CODE INFORMATION LIFE SAFETY PLAN |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| 02_Civil Binder |
| 01_Architecture Binder |
| A0-1 - WALL TYPES |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A0-2 - DOOR SCHEDULE AND DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A0-3 - FINISH SCHEDULES |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A1-0 - SLAB PLAN |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A1-1 - FLOOR PLAN |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A1-2 - EQUIPMENT PLATFORM FLOOR PLAN |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A1-3 - REFLECTED CEILING PLAN |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A1-4 - ROOF PLAN AND DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A2-1 - EXTERIOR ELEVATIONS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A2-2 - BUILDING SECTIONS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A2-3 - BUILDING SECTIONS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A3-1 - INTERIOR ELEVATIONS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A4-1 - DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A4-2 - DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A4-3 - DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A4-4 - MILLWORK |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| A4-5 - INTERIOR DETAILS |
| Sheets |
| A0.1 - WALL TYPES |
| A0.2 - DOOR SCHEDULE AND DETAILS |
| A0.3 - FINISH SCHEDULES |
| A1.0 - SLAB PLAN |
| A1.1 - FLOOR PLAN |
| A1.2 - EQUIPMENT PLATFORM FLOOR PLAN |
| A1.3 - REFLECTED CEILING PLAN |
| A1.4 - ROOF PLAN AND DETAILS |
| A2.1 - EXTERIOR ELEVATIONS |
| A2.2 - BUILDING SECTIONS |
| A2.3 - BUILDING SECTIONS |
| A3.1 - INTERIOR ELEVATIONS |
| A4.1 - DETAILS |
| A4.2 - DETAILS |
| A4.3 - DETAILS |
| A4.4 - MILLWORK |
| A4.5 - INTERIOR DETAILS |
| G0.0 - INDEX SHEET |
| G0.1 - CODE INFORMATION LIFE SAFETY PLAN |
| 04_Mechanical Binder |
| M0.1 |
| M0.2 |
| M1.1 |
| M1.2 |
| 05_Plumbing Binder |
| P0.1 |
| P1.1 |
| P1.2 |
| P3.1 |
| P4.1 |
| 06_Electrical Binder |
| E0.1 |
| E0.2 |
| E0.3 |
| E0.4 |
| E0.5 |
| E0.6 |
| E0.7 |
| E0.8 |
| E1.1 |
| E2.1 |
| A0-1 - WALL TYPES REV |
| A-1.1 REV |
| A1-0 - SLAB PLAN REV |
| A2.1 pdf |
| A2.2 REV |
| A2.3 REV |
| A4-1 - DETAILS REV |
| A4-2 - DETAILS REV |
| S 4.2 Pole Shed Footing |
| S-1.0 REV |
| S-1.2 REV |
| S-1.3 REV |
| S-3.1 REV |
| S-4.1 REV |
G0.0 REV
File details come from the government source that posted it. Updated .