ATTACHMENT 1
Schedule of Items
Tributary to Hiwassee River Stream Restoration Project
| Description |
| Quantity |
| Unit |
| Unit Price |
| Totals |
ITEM 1. TRIBUTARY TO HIWASSEE RIVER RESTORATION PROJECT
1A. EQUIPMENT & LABOR
| Track hoe w/ hydraulic thumb & operator |
| 140 |
| hours |
1B. MATERIALS
| Gravel for construction entrance |
| 40 |
| ton |
| Boulders for rock vanes |
| 40 |
| ton |
| Furnish and install nonwoven geotextile in log vanes |
| 100 |
| linear feet |
| Class B rip rap for diversion channel & dike |
| 20 |
| ton |
| Poly-fabric for diversion channel |
| 500 |
| linear feet |
1C. EROSION & SEDIMENT CONTROL
| Seed all disturbed soil |
| 4.0 |
| acres |
| Furnish & install riparian planting (1 gallon container) |
| 150 |
| each |
| Furnish & install riparian planting (live stakes) |
| 500 |
| each |
| Furnish & install coir matting |
| 500 |
| linear feet |
| "Brown water" pump & silt bag |
| 1 |
| each |
Costs:
Any work shown on drawings or in specifications that is not included in bid items is incidental to other items.
Payment will be made on actual work performed unless otherwise noted “CQ” designating Contract Quantity.