ATTACHMENT_02_SOW.docx
DOCX document 15 KB Posted
- Attached to
- RICH MOUNTAIN FIRE TOWER RESTORATION PROJECT Federal contract opportunity
- Solicitation number
- AG-4660-S-17-0021
- Issued by
- Department of Agriculture Forest Service
About this file
SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_02,_AG-4660-S-17-0021,_Rich_Mountain_Fire_Tower.pdf | ||
| amendment_001.pdf | ||
| ATTACHMENT_01_WAGE_DETERMINATION_RM.docx | DOCX document | |
| ATTACHMENT_04_Rich_Mtn_Fire_Tower_Specifications.pdf | ||
| AG-4660-S-17-0021,_Rich_Mountain_Fire_Tower_Deferred_Maintenance.pdf | ||
| ATTACHMENT_05_EXPERIENCE_QUISTIONNAIRE.docx | DOCX document | |
| ATTACHMENT_03_DRAWINGS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 02 AG-4660-S-17-0021
NFNC Grandfather Ranger District Rich Mountain Fire Tower Restoration 2017
Rich Mountain Fire Tower Restoration
SCOPE OF WORK:
Project Description: Referred Maintenance Reduction – Rich Mountain Tower Restoration Project Project Location: National Forest in North Carolina, Pisgah National Forest, Appalachian Ranger District.
Project Location Directions: Located near Hot Springs, NC.
Work Description: Project includes but is not limited to demolition to include removal of chain link fence, floor joists, shingles and lightning protection. Project replaces the flooring with aluminum floor grating and the roof with a standing seam metal roof system. A complete lightning system with air terminals and weather head. Contractor is to consider safety of the user when choosing install dates and notification to the public.
ATTN VENDORS: Please refer to Attachment 03 for Drawings and Attachment 04 for Specifications for clarity on this Project.
Contract Time: 100 Days after issuance of NTP
File details come from the government source that posted it. Updated .