Specifications_AG-4431-S-15-0008.pdf
PDF 3 MB Posted
- Attached to
- REPLACE ROOF, BUILDING #50, AUBURN, AL Federal contract opportunity
- Solicitation number
- AG-4431-S-15-0008
About this file
AG-4431-S-15-0008 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_NO._001 __AG-4431-S-15-0008.pdf | ||
| REVISED_FINAL_DRAWINGS_AG-4431-S-15-0008.pdf | ||
| AG-4431-S-15-0008_SF1442.pdf | ||
| AG-4431-S-15-0008_SF1442.pdf | ||
| Drawings_AG-4431-S-15-0008.pdf | ||
| Solicitation_Package_AG-4431-S-15-0008.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
REPLACE BUILDING NO. 50 ROOF
AUBURN, ALABAMA
Prepared For:
U.S. DEPARTMENT OF AGRICULTURE
Agricultural Research Service
Prepared By:
THE JOHNSON-McADAMS FIRM, P.A.
Greenwood, Mississippi
February 15, 2015
TABLE OF CONTENTS Page 1
TITLE: REPLACE BUILDING NO. 50 ROOF
AUBURN, ALABAMA
TABLE OF CONTENTS
Section Number Section Title
DIVISION 01 GENERAL REQUIREMENTS
01 00 01 Warranty of Construction 01 00 11 General Paragraphs 01 00 21 Contractor Quality Control 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 50 00 Project Closeout 01 57 50 Temporary Environmental Controls
DIVISION 02 EXISTING CONDITIONS
02 41 00 Demolition
DIVISION 05 METALS
05 50 16 Pre-Fabricated Insulated Metal Roof Curbs
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 22 00 Roof and Deck Insulation 07 52 00 Modified Bituminous Membrane Roofing 07 60 00 Flashing and Sheet Metal 07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 60 45 Skylights
APPENDIX “A” PHOTOGRAPHS
-- End of Table of Contents --
REPLACE BUILDING NO. 50 ROOF, USDA ARS, AUBURN, AL 1544A
SECTION 01 00 01 Page 1
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage described in paragraph 1.1.1 above within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all subcontractors', manufacturers', and suppliers' warranties expressed or implied, respecting any work and materials shall, at the direction of the Government, be enforced by the Contractor for the benefit of the Government.
In such case, if the Contractor's warranty under paragraph 1.1.1 above has expired, any suit directed by the Government to enforce a subcontractor's, manufacturer's, or supplier's warranty shall be at the expense of the Government. The Contractor shall obtain any warranties which the subcontractors, manufacturers, or suppliers would give in normal commercial practice. If so directed by the Contracting Officer, the Contractor shall require any such warranties to be executed in writing to the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with respect to latent defects, gross mistake, or fraud.
-- End of Section --
REPLACE BUILDING 50 ROOF, USDA ARS, AUBURN, AL 1544A
SECTION 01 00 11 Page 1
SECTION 01 00 11
GENERAL PARAGRAPHS
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and equipment and performing all work in strict accordance with these specifications for Replace Building No. 50 Roof, USDA, ARS, Auburn, Alabama.
1.1.2 Location
The site of work contemplated by this specification is at Buildings No. 3 located at USDA, ARS, Auburn, Alabama.
1.1.3 Principal Features of Work:
BASE BID
1. The Base Bid provides for the installation of a modified roofing system.
The new roofing system includes installation of a mechanically fastened 1/2” cover board with a 3 ply SBS modified bitumen roof membrane, roof insulation, flashings, gutters and downspouts.
1.2 SITE VISIT
A site visit and inspection tour will be held at Buildings 50, at Aquatic Animal Health Research Unit, Auburn, Alabama. All potential bidders will be notified of the exact time and date and are strongly urged to attend the site visit. Inspection may only be made at this time, unless prior written approval is obtained to inspect at another date and time. Contact:
U.S. Department of Agriculture, ARS
Attn: Mr. Bobby Washington Aquatic Animal Health Research Unit 990 Wire Road Auburn, AL 36832 Tel. No.: (334) 844-3979
1.3 COORDINATION OF WORK
1.3.1 Work space and space available for storing materials shall be subject to the approval of the Contracting Officer. Do not store materials and equipment in other than assigned areas.
1.3.2 Execute work so as to interfere as little as possible with normal functioning of the facility, including operations of utility services and any existing equipment, and with work being done by others.
1.3.3 Minimize interference of construction activities with the flow of traffic by keeping roads, walks and entrances to grounds, to parking areas and to occupied areas of buildings clear of construction materials, debris, construction equipment and vehicles except where noted on plans or in specifications. Provide unobstructed access to areas required to remain in operation.
1.3.4 The Contractor shall complete all work within 120 consecutive calendar
SECTION 01 00 11 Page 2 days after Notice to Proceed. Within 14 calendar days after Contract Award, the Contractor shall provide the Government with a detailed schedule of dates on which the Contractor plans to accomplish the work. In addition, the Contractor shall notify the Contracting Officer 10 days in advance of starting work. A planned work schedule shall be submitted to the Contracting Officer for approval. The schedule shall include a detailed description of the methods and equipment to be used for each operation and the sequence of operations. This schedule shall be updated monthly and submitted to the Contracting Officer for approval.
1.3.5 The Contractor shall take all measures and provide all material necessary for protecting existing equipment, property, and ongoing operations in affected areas of construction against dust, noise and debris.
1.3.6 Power sources for the Contractor's operations will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of the Government's facilities. Water sources will be available and supplied by the Government to the Contractor as long as its use does not interfere with the operations of any building. The Contractor is responsible for extending utility sources to his work locations. Such extensions shall be removed after work is completed, to the satisfaction of the Contracting Officer.
1.3.7 All references in the specifications to the Contracting Officer and
Contracting Officer's Representative shall constitute referrals initially to the Contracting Officer's Representative.
1.3.8 Contractor shall provide sanitary facilities for use by his employees and the employees of his subcontractors working on job site.
1.4 DRAWINGS
1.4.1 All dimensions shown of existing work and all dimensions required for work that is to be connected with existing work shall be verified by the Contractor by actual field measurements. Any work at variance with that specified or shown on the drawings, shall not be performed by the Contractor until the Contractor has received approval in writing from the Contracting Officer.
1.5 MATERIAL SAFETY DATA SHEETS (MSDS)
Material Safety Data Sheets must be submitted to the Contracting Officer prior to the commencement of any work with any substance that may be considered hazardous.
1.6 UTILITIES OR STRUCTURAL ITEMS CONFLICTING WITH PROPOSED CONSTRUCTION
In the event the Contractor finds an area where existing utilities or structural items conflict with proposed construction, the Contracting Officer shall be notified immediately. The Contractor shall then propose a method of solving the problem. Work shall not resume in the problem area until the Contractor has received written approval from the Contracting Officer. There shall be no additional cost to the Government.
1.7 ACCEPTANCE OF WORK
1.7.1 Final inspection will not be made until the contract work is completed. The Contractor shall notify in writing the Contracting Officer fifteen working days prior to the date on which the work will be ready for final inspection.
SECTION 01 00 11 Page 3
1.7.2 Final inspection and acceptance of the work shown by the drawings and specifications forming a part of this contract shall not be binding or conclusive on the Government if it shall be shown that (1) the Contractor has willfully or through collusion with persons or firms engaged in the performance of the contract supplied inferior materials, equipment, or workmanship, or (2) the Contractor has otherwise departed from the terms of the contract.
SECTION 01 00 21 Page 1
SECTION 01 00 21
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 GENERAL
This section covers the quality control inspection, sampling, and testing of all materials, services, and workmanship required to be performed by the contract drawings, specifications, and other contract requirements. The Contractor shall perform all quality control inspection, sampling, and testing required by this contract and shall review and certify that each submittal is correct and in strict conformance with the contract drawings and specifications for all shop drawings and lists of materials, fixtures, and equipment. All work performed under this contract shall be in strict accordance procedures and requirements detailed on the plans and specifications.
1.1.1 Certificate of Compliance
Upon completion of the contract work and prior to final acceptance, the Contractor shall submit to the Contracting Officer a certificate of compliance which states that all materials, equipment, design, and workmanship incorporated in the work are in strict compliance with contract drawings and specifications except for approved deviations. The certificates of compliance shall be signed and dated by both the manufacturer’s representative and the Contractor. Based upon this certificate of compliance and other contract requirements, the Contractor shall be responsible for correcting at his expense any defects, omissions, and deviations (other than those previously approved) which are detected during the contract period or during the one year warranty period as defined in
SECTION 01 00 01, WARRANTY OF CONSTRUCTION.
1.2 INSPECTION
The Contractor shall inspect all materials, services, and workmanship to assure conformance with contract requirements.
1.3 REVIEW AND APPROVAL OF SHOP DRAWINGS, SUBMITTALS, MATERIALS, FIXTURES,
AND EQUIPMENT
1.3.1 Prior to submission to the Government for approval, the Contractor shall review and certify that all shop drawings, submittals, lists of materials, fixtures, and equipment as called for under the various headings of these specifications are correct and in strict compliance with the contract drawings and specifications. These drawings, submittals and lists shall be accurate, complete, and adequately detailed. The top copy of data comprising each item listed on the transmittal form shall be identified as having received the quality control inspector's approval by being so stamped, signed and dated. Approval of shop drawings, submittals, materials, fixtures, and equipment by the Contracting Officer will not relieve the Contractor of the responsibility for any errors which may exist and the Contractor shall be responsible for the satisfactory construction of all work. All samples of materials submitted as required by these specifications shall be properly identified and labeled for ready identification, and upon being approved, stored at the site of the work for jobsite use until all work has been accepted by the Contracting Officer.
The Contractor shall provide four (4) sets of all shop drawings.
SECTION 01 00 21 Page 2
1.3.2 All proposed deviations required by the Contractor shall be noted in the "Remarks" column of the Form. The Contractor shall set forth in writing the reason for any deviations and annotate such deviations on the shop drawing. The Government reserves the right to rescind inadvertent approval of shop drawings containing unnoted deviations.
1.4 DAILY RECORDS
The Contractor shall maintain a daily record of quality control measures performed for each shift of Contractor or Subcontractor operations on an appropriate format. These records shall provide factual evidence that continuous quality control inspections have been performed, including but not limited to the following: job progress, problems encountered; problems resolved; type and number of inspections; results of inspections or tests including all computations; nature of defects; causes for rejection; safety violations; proposed remedial action; and corrective action taken. These records shall cover both conforming and defective items and shall include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. The Contractor shall maintain a current record of all inspections and shall furnish to the Contracting Officer on a daily basis, legible copies of all inspection records for his permanent retention. The daily records of inspections shall cover all work placement subsequent to the previous report, and shall be verified by the Contractor's designated representative.
1.5 RECURRING DEFICIENCIES
If recurring deficiencies in an item or items being inspected by the Contractor indicate that the inspection system is not providing adequate quality control, the Contractor shall take such corrective measures as deemed necessary by the Contracting Officer.
1.6 CONFLICTS
In the event of a difference of opinion between the Contractor and the Contracting Officer, the Contracting Officer shall govern.
SECTION 01 33 00 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
1. SHOP DRAWINGS
The Contractor shall furnish the Contracting Officer six copies with such promptness as to cause no delay in this work or the work of any other contractors, one sepia copy of the shop drawings as required for the various subheadings for the Contracting Officer's approval. Shop drawings of any other subcontractor should be reviewed and approved by each subcontractor where their contract work comes in contact with or interferes with that of another subcontractor.
1.1 The Contracting Officer's approval, however, shall not relieve the
Contractor from responsibility for errors in shop drawings. Shop drawings are the instruments of the Contractor, not the Contracting Officer; the Drawings and Specifications shall always be final.
2. SAMPLES
Within and not later than thirty (30) days from the date of the General Contract, the General Contractor shall have secured and submitted to the Contracting Officer for his consideration, two samples of each kind and grade of materials and finish as noted under the various headings of the specifications. These samples shall be finished completely and shall accurately represent the work as it is proposed to be installed. The Contracting Officer will give immediate consideration to such samples and shall notify the General Contractor within ten (10) days after receipt of either approval or rejection. If such samples are rejected, the General Contractor shall, without delay, submit corrected samples for approval, and shall continue to do so until such approval is given the Contracting Officer. All approvals will be given by the Contracting Officer to the General Contractor in writing.
2.1 It shall be the Contractor's responsibility to obtain materials at such time as to cause no delay to the project. No allowance for additional time nor substitution of approved materials will be allowed for Contractor's negligence in late ordering of materials.
3. PRODUCT DATA
Submit six copies of preprinted material such as illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer’s descriptive literature, catalog data, and other data to illustrate portion of work.
4. GOVERNMENT ACTIONS POSSIBLE
Submittals will be returned to the Contractor with one of the following notations:
a. Submittals marked “approved” or “approved as submitted” authorize
Contractor to proceed with work covered.
b. Submittals marked “approved as noted” or “approval except as noted; resubmission not required” authorize Contractor to proceed with work as noted provided the Contractor takes no exception to the notations.
c. Submittals marked “revise” and “resubmitall” or “disapproved”
SECTION 01 33 00 Page 2 indicate submittal is incomplete or does not comply with design concept or requirements of the contract documents and shall be resubmitted with appropriate changes. No work shall proceed for this item until resubmittal is approved.
5. SUBMITTAL REGISTER
Contractor shall submit items as listed on the attached Submittal Register.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES
REPLACE BUILDING NO. 50 ROOF, USDA ARS, AUBURN, AL
02 41 00 SD-01 Preconstruction Submittals
1.6.2 GExisting Conditions
SD-07 Certificates
1.9 GDemolition Plan
1.4.1 GNotifications
05 50 16 SD-02 Shop Drawings 2.1Curbs
06 10 00 SD-02 Shop Drawings
2.1.1.1 GNailing Strips
SD-05 Design Data GModifications of structural members SD-06 Test Reports
1.4.2Preservative-treated SD-07 Certificates
1.8.1Certificates of grade 1.7Preservative treatment
07 22 00 SD-02 Shop Drawings 2.5Wood nailers
2.1.4 GTapered roof insulation
SD-03 Product Data 2.4Fasteners
2.3.3 GAsphalt
2.1 GInsulation
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES
07 22 00 1.4.1Flame spread and smoke developed ratings
SD-07 Certificates 1.3qualifications
SD-08 Manufacturer’s Instructions 2.4fasteners 2.1insulation
07 52 00 SD-02 Shop Drawings
1.4.6 GRoof plan
SD-03 Product Data 2.1Modified Bitumen Sheets 2.3Asphalt 2.1Fiberglass Felt 2.5Primer 2.6Modified Bitumen Roof Cement 2.9Pre-Manufactured Accessories
2.8 GFasteners And Plates
1.9Warranty
SD-05 Design Data
1.4.5 GWind Uplift Calculations
SD-07 Certificates 1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator 1.4.3Qualification of Engineer of
Record 1.5.1Bill of Lading
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES
07 52 00 1.4.5Wind Uplift Resistance 1.4.4Fire Resistance
SD-08 Manufacturer’s Instructions
3.3.5 GModified Bitumen Membrane
Application
3.3.6 GFlashing
3.2.3.1Temperature Limitations for
Asphalt 2.5Primer 2.8.1Fasteners 1.6Cold Weather Installation
SD-11 Closeout Submittals 1.9Warranty 3.7Information Card 3.6Instructions To Government
Personnel 07 60 00 SD-02 Shop Drawings
3.1.15Gutters 3.1.16Downspouts 3.1.10Base flashing 3.1.11Counterflashing 3.1.17Flashing at roof penetrations 3.1.12Reglets 3.1.14Drip edge
SD-11 Closeout Submittals 3.5Quality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES
07 92 00 SD-03 Product Data 2.1Sealants 2.2Primers 2.3Bond breakers 2.4Backstops
SD-07 Certificates 3.3.6Sealant
08 60 45 SD-02 Shop Drawings 3.2Shop Drawings
SD-03 Product Data
2.1SKYLIGHTS
1.6Warranty
SD-06 Test Reports 2.1Test Reports
SD-07 Certificates 1.4Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
Section 01 42 00 Page 1
SECTION 01 42 00
SOURCES FOR REFERENCE PUBLICATIONS
11/14
1.1 REFERENCES
Various publications are referenced in other sections of the specifications to establish requirements for the work. These references are identified in each section by document number, date and title. The document number used in the citation is the number assigned by the standards producing organization (e.g. ASTM B564 Standard Specification for Nickel Alloy Forgings). However, when the standards producing organization has not assigned a number to a document, an identifying number has been assigned for reference purposes.
1.2 ORDERING INFORMATION
The addresses of the standards publishing organizations whose documents are referenced in other sections of these specifications are listed below, and if the source of the publications is different from the address of the sponsoring organization, that information is also provided. Documents listed in the specifications with numbers which were not assigned by the standards producing organization should be ordered from the source by title rather than by number.
AMERICAN FOREST & PAPER ASSOCIATION (AF&PA)
American Wood Council ATTN: Publications Department 1111 Nineteenth Street NW, Suite 800 Washington, DC 20036 Ph: 800-890-7732 or 202-463-2766 Fax: 202-463-2791 E-mail: awcpubs@afandpa.org Internet: http://www.awc.org/
AMERICAN LUMBER STANDARDS COMMITTEE (ALSC)
P.O. Box 210 Germantown, MD 20875-0210 Ph: 301-972-1700 Fax: 301-540-8004 E-mail: alsc@alsc.org Internet: http://www.alsc.org
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
1899 L Street, NW,11th Floor Washington, DC 20036 Ph: 202-293-8020 Fax: 202-293-9287 E-mail: storemanager@ansi.org Internet: http://www.ansi.org/
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
1801 Alexander Bell Drive Reston, VA 20191 http://www.awc.org/ http://www.alsc.org/ http://www.ansi.org/
Section 01 42 00 Page 2
Ph: 703-295-6300; 800-548-2723 E-mail: member@asce.org Internet: http://www.asce.org
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
1800 East Oakton Street Des Plaines, IL 60018 Ph: 847-699-2929 Internet: http://www.asse.org
AMERICAN WELDING SOCIETY (AWS)
13301 NW 47 Ave Miami, FL 33054 Ph: 888-WELDING, 305-824-1177, 305-826-6192 Fax: 305-826-6195 E-mail: customer.service@awspubs.com Internet: http://www.aws.org
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
P.O. Box 361784 Birmingham, AL 35236-1784 Ph: 205-733-4077 Fax: 205-733-4075 Internet: http://www.awpa.com
ASME INTERNATIONAL (ASME)
Two Park Avenue, M/S 10E New York, NY 10016-5990 Ph: 800-843-2763 Fax: 973-882-1717 E-mail: customercare@asme.org Internet: http://www.asme.org
ASPHALT ROOFING MANUFACTURER'S ASSOCIATION (ARMA)
750 National Press Building 529 14th Street, NW Washington D.C. 20045 Ph: 202-591-2450 Fax: 202-591-2445 Internet: http://www.asphaltroofing.org
ASTM INTERNATIONAL (ASTM)
100 Barr Harbor Drive, P.O. Box C700 West Conshohocken, PA 19428-2959 Ph: 877-909-2786 Internet: http://www.astm.org
FM GLOBAL (FM)
270 Central Avenue P.O. Box 7500 Johnston, RI 02919-4923 Ph: 877-364-6726 Fax: 401-275-3029 E-mail: servicedesk.myrisk@fmglobal.com Internet: http://www.fmglobal.com http://www.asce.org/ http://www.asse.org/ http://www.aws.org/ http://www.awpa.com/ http://www.asme.org/ http://www.asphaltroofing.org/ http://www.astm.org/ http://www.fmglobal.com/
Section 01 42 00 Page 3
GREEN SEAL (GS)
1001 Connecticut Avenue, NW Suite 827 Washington, DC 20036-5525 Ph: 202-872-6400 Fax: 202-872-4324 Internet: http://www.greenseal.org
INTERNATIONAL CODE COUNCIL (ICC)
500 New Jersey Avenue, NW 6th Floor, Washington, DC 20001 Ph: 800-786-4452 or 888-422-7233 E-mail: order@iccsafe.org Internet: www.iccsafe.org
MIDWEST ROOFING CONTRACTORS ASSOCIATION (MRCA)
8735 W Higgins Road Suite 300 Chicago, IL 60631 Ph: 800-497-6722 Fax: 847-375-6473 E-mail: info@mrca.org Internet: General Information: http://www.mrca.org
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
1 Batterymarch Park Quincy, MA 02169-7471 Ph: 617-770-3000 Fax: 617-770-0700 Internet: http://www.nfpa.org
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
10255 West Higgins Road, Suite 600 Rosemont, IL 60018-5607 Ph: 866-275-6722 (866-ASK-NRCA) Fax: 847-299-1183 E-mail: info@nrca.net Internet: http://www.nrca.net
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
4201 Lafayette Center Drive Chantilly, VA 20151-1219 Ph: 703-803-2980 Fax: 703-803-3732 Internet: http://www.smacna.org
U.S. ARMY CORPS OF ENGINEERS (USACE)
CRD-C DOCUMENTS available on Internet:
http://www.wbdg.org/ccb/browse_cat.php?c=68 Order Other Documents from:
USACE Publications Depot Attn: CEHEC-IM-PD 2803 52nd Avenue Hyattsville, MD 20781-1102 Ph: 301-394-0081 http://www.greenseal.org/ http://www.iccsafe.org/ http://www.mrca.org/ http://www.nfpa.org/ http://www.nrca.net/ http://www.smacna.org/ http://www.wbdg.org/ccb
Section 01 42 00 Page 4
Fax: 301-394-0084 E-mail: pubs-army@usace.army.mil Internet: http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx
U.S. DEFENSE LOGISTICS AGENCY (DLA)
Fort Belvoir, VA Internet: http://www.dla.mil
U.S. DEPARTMENT OF DEFENSE (DOD)
Order DOD Documents from:
Room 3A750-The Pentagon 1400 Defense Pentagon Washington, DC 20301-1400 Ph: 703-571-3343
FAX: 215-697-1462
E-mail: customerservice@ntis.gov Internet: http://www.ntis.gov Obtain Military Specifications, Standards and Related Publications from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Department of Defense Single Stock Point (DODSSP) Document Automation and Production Service (DAPS) Building 4/D 700 Robbins Avenue Philadelphia, PA 19111-5094 Ph: 215-697-6396 - for account/password issues Internet: http://assist.daps.dla.mil/online/start/; account registration required Obtain Unified Facilities Criteria (UFC) from:
Whole Building Design Guide (WBDG) National Institute of Building Sciences (NIBS) 1090 Vermont Avenue NW, Suite 700 Washington, CD 20005 Ph: 202-289-7800 Fax: 202-289-1092 Internet: http://www.wbdg.org/references/docs_refs.php
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
General Services Administration 1275 First St. NE Washington, DC 20417 Ph: 202-501-1231 Internet: http://www.gsaelibrary.gsa.gov/ElibMain/home.do Obtain documents from:
Acquisition Streamlining and Standardization Information System
(ASSIST)
Internet: https://assist.dla.mil/online/start/; account registration required
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
8601 Adelphi Road College Park, MD 20740-6001 Ph: 866-272-6272 http://www.publications.usace.army.mil/ http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx http://www.dla.mil/ http://www.ntis.gov/ http://assist.daps.dla.mil/online/start http://www.wbdg.org/references/docs_refs.php http://www.gsaelibrary.gsa.gov/ElibMain/home.do https://assist.dla.mil/online/start
Section 01 42 00 Page 5
Fax: 301-837-0483 Internet: http://www.archives.gov Order documents from:
Superintendent of Documents U.S.Government Printing Office (GPO) 710 North Capitol Street, NW Washington, DC 20401 Ph: 202-512-1800 Fax: 202-512-2104 E-mail: contactcenter@gpo.gov Internet: http://www.gpoaccess.gov
UNDERWRITERS LABORATORIES (UL)
2600 N.W. Lake Road Camas, WA 98607-8542 Ph: 877-854-3577 E-mail: CEC.us@us.ul.com Internet: http://www.ul.com/ UL Directories available through IHS at http://www.ihs.com
PART 2 PRODUCTS
Not used
PART 3 EXECUTION
Not used http://www.archives.gov/ http://www.gpoaccess.gov/ http://www.ul.com/ http://www.ihs.com/
SECTION 01 50 00 Page 1
SECTION 01 50 00
PROJECT CLOSEOUT
1.1 AS-BUILT DRAWINGS
At the completion of the project, the Contracting Officer will furnish the
Contractor, free of charge, one set of drawings on which the Contractor will indicate all variations in locations, construction, equipment, etc.
from that shown on the original Drawings. They shall also indicate the exact location, size, etc. of the following:
a. Roofing work
1.2 SUBSTANTIAL COMPLETION AND COMPLETION OF PUNCH LIST CORRECTIONS
Set date and notify Contracting Officer as to time construction will be ready for preliminary punch list and, upon completion of that list, set time and date for inspection of punch list corrections. The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents. When the Contracting Officer on the basis of an inspection, determines that the Work or designated portion thereof is sufficiently complete, in accordance with the Contract Documents, so that the Owner or separate contractors can occupy or utilize the Work or designated portion thereof for the use for which it is intended, he will prepare a Certificate of Substantial Completion which shall establish the Date of Substantial Completion, shall state the responsibilities of the Owner and the Contractor for security, maintenance, heat, utilities, damage to the Work, and insurance, and shall fix the time within which the Contractor shall complete the items listed therein or attached thereto. Warranties required by the Contract Documents shall commence on the Date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. The Certificate of Substantial Completion shall be submitted to the Owner and the Contractor for their written acceptance of the responsibilities assigned to them in such Certificate.
1.3 FINAL INSPECTION
The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection.
An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. If the project is complete, in the opinion of the Contracting Officer, the Contracting Officer shall issue a certificate as set forth hereinafter. Minor unfinished items of work may be excluded from the certificate. The Contracting Officer and Contractor shall mutually agree on a date for the completion of these items of work.
Should the Contractor fail to complete the work within the agreed time, the Owner shall have the option of having the unfinished work completed.
1.4 RELEASE OF LIENS AND CERTIFICATION ALL BILLS ARE PAID
SECTION 01 50 00 Page 2
The Contractor, before final acceptance is given by the Contracting Officer, shall furnish for himself and all sub-contractors, in triplicate, duly certified by a notary, a full release of liens, damages, and a guarantee that all materials and labor are paid in accordance with the Contractual Documents.
1.5 GUARANTEE
The Contractor, before final acceptance by the Contracting Officer, shall furnish the Owner, in triplicate, a written notarized guarantee. All Contractors shall guarantee their work for a period of one year from the date of Substantial Completion as stated by the Contracting Officer.
Neither the final Certificate for Payment, nor any provision in the Contract Documents shall relieve the contractors of their responsibility for negligence or defective materials or workmanship within the extent and period covered by law; and upon written notice he shall remedy any defects due thereto, and pay all expenses for any damages to other work resulting therefrom. Emergency defective workmanship and defective materials within the year's guarantee shall be corrected within a few days after receipt of a written order from the Contracting Officer. Any items that are not considered of an emergency nature by the Contracting Officer may be corrected prior to the expiration of the Guarantee period.
1.5.1 The wording for the Guarantee shall be as follows:
"We hereby guarantee all work performed by us on the above captioned project to be free from defective materials and workmanship for a period of one year, or for such longer period of time as may be called for in the Contractual Documents for such portions of the work."
1.6 OTHER FINAL DOCUMENTS
Deliver to the Owner, through the Contracting Officer, all required bonds, warranties, individual guarantees, etc. that are required by the various following sections of these specifications.
1.7 ACCEPTANCE
Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and excepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate.
Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.
SECTION 01 57 50 Page 1
SECTION 01 57 50
TEMPORARY ENVIRONMENTAL CONTROLS
1.1 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
ENVIRONMENTAL PROTECTION AGENCY (EPA)
40 CFR 112 Regulations on Oil Pollution Prevention
40 CFR 261 Regulations Identifying Hazardous Waste
40 CFR 262 Regulations for Hazardous Waste Generators
40 CFR 263 Regulations for Hazardous Waste Transporters
40 CFR 264 Regulations for Owners and Operators of Permitted
Hazardous Waste Facilities
40 CFR 403 General Pretreatment Standards
PL 96 510 Comprehensive Environmental Response Compensation and Liability Act of 1980
DEPARTMENT OF TRANSPORTATION (DOT)
49 CFR 171 Standards for Transportation of Hazardous Materials
49 CFR 172 Hazardous Materials Tables and Regulations
49 CFR 178 Regulations for Shipping Container Specifications
1.2 DEFINITIONS
1.2.1 Sediment
Soil and other debris that have eroded and have been transported by runoff water or wind.
1.2.2 Solid Waste
Rubbish, debris, garbage, and other discarded solid materials, except hazardous waste as defined in paragraph entitled, "Hazardous Waste," resulting from industrial, commercial, and agricultural operations and from community activities.
1.2.3 Rubbish
Combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.
1.2.4 Debris
Combustible and noncombustible wastes such as ashes and waste materials resulting from construction or maintenance and repair work, leaves, and tree
SECTION 01 57 50 Page 2 trimmings.
1.2.5 Chemical Waste
This includes salts, acids, alkalies, herbicides, pesticides, and organic chemicals.
1.2.6 Sanitary Wastes
1.2.6.1 Sewage
Waste characterized as domestic sanitary sewage.
1.2.6.2 Garbage
Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.
1.2.7 Hazardous Waste
Hazardous substances as defined in 40 CFR 261 or as defined by applicable state and local regulations.
1.2.8 Oily Waste
Petroleum products and bituminous materials.
1.2.9 Landscape Features
Trees, plants, shrubs and ground covers.
1.2.10 Hazardous Substances
As defined in EPA PL 96-510.
1.2.11 Hazardous Materials
As defined in DOT Regulation 49 CFR 171 and listed in 49 CFR 172.
1.3 ENVIRONMENTAL PROTECTION REQUIREMENTS
Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with Federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances and noise pollution.
PART 2 EXECUTION
2.1 NATURAL RESOURCES
Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.
2.1.1 Landscape Features
SECTION 01 57 50 Page 3
Do not remove, cut, deface, injure, or destroy existing landscape features without the Contracting Officer's permission. Do not fasten or attach ropes, cables, or guys to existing nearby trees for anchorages, unless authorized by the Contracting Officer. Where such use of attach ropes, cables, or guys is authorized, the Contractor shall be responsible for any resultant damage.
2.1.1.1 Protection
Protect existing landscape features which are to remain and which may be injured, bruised, defaced, or otherwise damaged by construction operations.
By approved excavation, remove trees with 30 percent or more of their root systems destroyed.
2.1.1.2 Replacement
Remove existing landscape features scarred or damaged by equipment operations, and replace with equivalent, undamaged features. Obtain the Contracting Officer's approval before replacement.
2.1.2 Water Resources
2.1.2.1 Oily and Hazardous Substances
Prevent oily or other hazardous substances from entering the ground, drainage areas, or local bodies of water. Take precautions to ensure that no oil or other hazardous material is released to the water, land, sanitary sewer system, or storm sewer system. Environmental requirements for the prevention of oil spills are contained in 40 CFR 112. For oil and hazardous substance spills which may be large enough to violate Federal, State or Local Regulations, the Contracting Officer shall be verbally notified immediately. Clean up any spills of oil or hazardous substances which result from the Contractor's operations. If the Contractor can not clean up any spill in a timely manner, the Government will perform the cleanup at the Contractor's expense.
2.1.3 Fish and Wildlife Resources
Do not disturb fish and wildlife. Do not alter water flows or otherwise disturb the native habitat adjacent to the project and critical to the survival of fish and wildlife, except as indicated or specified.
2.2 HISTORICAL AND ARCHEOLOGICAL RESOURCES
Carefully preserve and report immediately to the Contracting Officer items having possible historical or archeological interest which are discovered in the course of work. Protect monuments, markers, and works of art.
2.3 EROSION AND SEDIMENT CONTROL
2.3.1 Burnoff
Burnoff of the ground cover is prohibited.
2.3.2 Protection of Erodible Soils
Immediately finish the earthwork brought to a final grade, as indicated or specified. Immediately protect the side slopes and back slopes upon completion of rough grading. Plan and conduct earthwork to minimize the duration of exposure of unprotected soils.
SECTION 01 57 50 Page 4
2.3.3 Temporary Protection of Erodible Soils
Provide the following methods to prevent erosion and control sedimentation.
2.3.3.1 Mechanical Retardation and Control of Runoff
Mechanically retard and control the rate of runoff from the construction site. Provide diversion ditches, benches, and berms to retard and divert runoff to protected drainage courses.
2.3.3.2 Seeding
Provide seeding where ground is disturbed. Include topsoil or nutriment during the seeding operation necessary to establish or re-establish a suitable stand of grass.
2.4 SOLID AND SANITARY WASTES
Pick up solid wastes, and place in containers which are regularly emptied.
Prevent contamination of the site and other areas when handling and disposing wastes. On completion, leave the areas clean. Control and dispose of wastes.
2.4.1 Disposal of Solid Wastes
Dispose of solid wastes in accordance with the requirements specified.
2.4.1.1 Removal From Government Property
Remove solid wastes from Government property.
2.4.2 Garbage Disposal
Place garbage in approved containers, and move to a pickup point or disposal area, where directed.
2.4.3 Sewage, Odor, and Pest Control
Dispose of sewage through connection to a municipal or district sanitary sewage system, where such a system is not available, use chemical toilets.
Empty wastes into a municipal, district, or station sanitary sewage system.
Provide pest control and elimination of odors. No substances shall be disposed of which will interfere with treatment plant operations in accordance with 40 CFR 403.
2.5 HAZARDOUS WASTES
2.5.1 General
Handle generated hazardous wastes in accordance with 40 CFR 262. Store hazardous waste in approved containers in accordance with 49 CFR 178. Label to identify the type of waste and the date the container was filled. Remove the containers from the project site, and store and dispose of hazardous waste in accordance with 40 CFR 263 and 264. For hazardous wastes spills, verbally notify the Contracting Officer immediately.
2.5.2 Petroleum Products
Conduct the fueling and lubricating of equipment and motor vehicles to protect against spills and evaporation. Dispose of lubricants and excess
SECTION 01 57 50 Page 5 oils.
2.6 DUST
Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, haul roads, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead, use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air blowing will be permitted only for cleaning nonparticulate debris such as steel reinforcing bars.
2.7 ABRASIVE BLASTING
Provide tarpaulin drop cloths and windscreens to enclose abrasive blasting operations to confine and collect dust, abrasive agent, paint chips, and other debris. Dispose of abrasive blasting debris.
2.8 NOISE
Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times.
2.9 FOOD
Preparation, cooking and dispensing of food products will not be permitted.
2.10 TEMPORARY CONSTRUCTION
Remove temporary construction facilities including haul roads, work areas, structures, foundations of temporary structures, and stockpiles of excess or waste materials. Grade temporary roads, parking areas, and temporarily used areas to conform with surrounding contours.
Section 02 41 00 Page 1
SECTION 02 41 00
DEMOLITION
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the
AMERICAN SOCIETY OF SAFETY ENGINEERS (ASSE/SAFE)
ASSE/SAFE A10.6 (2006) Safety Requirements for Demolition
Operations
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008) Safety and Health Requirements Manual
U.S. DEFENSE LOGISTICS AGENCY (DLA)
DLA 4145.25 (June 2000) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders
U.S. DEPARTMENT OF DEFENSE (DOD)
DOD 4000.25-1-M (2006; Notice 1) Requisitioning and Issue
Procedures
MIL-STD-129 (Rev P; Notice 3; Change 4) Military Marking for Shipment and Storage
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 61 National Emission Standards for Hazardous Air
Pollutants
49 CFR 173.301 Shipment of Compressed Gases in Cylinders and
Spherical Pressure Vessels
1.2 GENERAL REQUIREMENTS
Do not begin demolition until authorization is received from the Contracting Officer. The work of this section is to be performed in a manner that maximizes salvage and recycling of materials. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the buildings. The work includes demolition of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.
Section 02 41 00 Page 2
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33
00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Existing Conditions; G
SD-07 Certificates
Demolition Plan; G
Notifications; G
Proposed demolition and removal procedures for approval before work is started.
1.4 REGULATORY AND SAFETY REQUIREMENTS
Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.
1.4.1 Notifications
1.4.1.1 General Requirements
Furnish timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M.
Notify the Regional Office of the United States Environmental Protection Agency (USEPA), State's environmental protection agency, local air pollution control district/agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M.
1.5 DUST AND DEBRIS CONTROL
Prevent the spread of dust and debris to occupied portions of the building and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.
1.6 PROTECTION
1.6.1 Traffic Control Signs
Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Notify the Contracting Officer prior to beginning such work.
1.6.2 Existing Conditions Documentation
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work.
Section 02 41 00 Page 3
Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document.
1.6.3 Items to Remain in Place
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.6.4 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.
1.6.5 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.6.6 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and…