Correction 2 DB.doc

DOC document 36 KB Posted

Attached to
RECOVERY - Roof Replacement Federal contract opportunity
Solicitation number
AG-4419-S-10-0478
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Correction 2 to Davis Bacon Wage Rates

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Roof Replacement, newest first.
File Type Posted
evaluation criteria.doc DOC document
Roof Q A.doc DOC document
Salem Tour Roster(1).xlsx XLSX spreadsheet
Brick Damage Pics.pdf PDF
DB.doc DOC document
Salem Roof Specs.doc DOC document
Schedule of Items.pdf PDF
Clauses.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: MO100008 03/12/2010 MO8

Superseded General Decision Number: MO20080008

State: Missouri

Construction Type: Building

Counties: Crawford, Dent, Iron, Phelps, Reynolds and

Washington Counties in Missouri.

BUILDING CONSTRUCTION PROJECTS (Does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date

0 03/12/2010

CARP0008-002 05/06/2009

Rates Fringes

Carpenters: (Including

Drywall Hanging)

Crawford, Dent and Phelps

Counties....................$ 31.65 11.05

CARP0008-004 05/06/2009

Iron, Reynolds and Washington Counties

Rates Fringes

Carpenters: (Including

Drywall Hanging)

Projects $1.5 million and over........................$ 26.66 11.40

Projects under $1.5 million.$ 23.89 11.40

ELEC0001-005 06/01/2009

Iron, Reynolds and Washington Counties

Rates Fringes

Electricians:....................$ 33.60 22.242

ELEC0257-002 03/01/2009

Crawford, Dent and Phelps Counties

Rates Fringes

Electricians:....................$ 29.07 15.049

PAIN1265-004 07/01/2009

Crawford,Dent and Phelps Counties

Rates Fringes

Painters: (Including Drywall

Finishing)

Brush and Roller............$ 23.00 10.66

Floor Work..................$ 23.50 10.66

Lead Abatement..............$ 25.25 10.66

Spray.......................$ 24.50 10.66

Structural Steel, Sandblasting and All Tank

Work........................$ 24.25 10.66

Taping, Paperhanging........$ 24.00 10.66

PAIN1292-004 09/01/2009

Iron and Washington Counties

Rates Fringes

Painters: (Including Drywall

Finishing)

Commercial..................$ 21.33 10.00

Lead Abatement..............$ 22.08 10.00

Spray & Abrasive Blasting...$ 23.33 10.00

Tapers (Tools)..............$ 21.58 10.00

Water Blasting..............$ 23.33 10.00

Height Rates (All Areas):

Over 60 ft. $0.50 per hour

Under 60 ft. $0.25 per hour.

PAIN1292-005 09/01/2009

Reynolds County

Rates Fringes

Painters: (Including Drywall

Finishing)

Commercial..................$ 19.23 10.00

Spray & Abrasive Blasting...$ 21.23 10.00

Taper (Tools)...............$ 19.48 10.00

Water Blasting..............$ 21.23 10.00

Height Rates:

Over 60 ft. $0.50 per hour

Under 60 ft. $0.25 per hour

PLAS0527-006 06/01/2008

Crawford, Dent and Phelps Counties

Rates Fringes

Cement Masons:...................$ 27.33 6.61

PLAS0527-008 05/07/2008

Iron, Reynolds and Washington Counties

Rates Fringes

Cement Masons:

Projects $10 million and more........................$ 28.21 12.45

Projects less than $10 million.....................$ 27.51 12.10

PLUM0035-004 07/01/1999

Crawford, Phelps and Washington Counties

Rates Fringes

Plumbers and Pipefitters

(Including HVAC Pipe Work).......$ 25.855 9.52

PLUM0562-007 01/01/2010

Dent, Iron and Reynolds Counties

Rates Fringes

Plumbers and Pipefitters

(Including HVAC Pipe Work)

Projects $7.0 million and over........................$ 34.00 21.43

Projects under $7.0 million.$ 32.66 16.04

* SHEE0036-004 02/01/2010

Crawford, Dent, Iron, Phelps and Washington Counties

Rates Fringes

Sheet Metal Worker (Including

HVAC Duct Work)..................$ 34.82 19.68

SHEE0036-005 07/01/2009

Reynolds County

Rates Fringes

Sheet Metal Worker (Including

HVAC Duct Work)..................$ 25.91 12.62

SUMO1999-004 10/14/1999

Rates Fringes

Asbestos Workers/Insulator

Includes application of all insulating materials, protective coverings,coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls,floors, ceilings and curtain walls...............$ 23.26 8.19

Ironworkers, Structural..........$ 7.50

Laborer, Unskilled...............$ 12.46 4.83

Power equipment operators:

Backhoes....................$ 19.08 8.72

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .