DBA_WD.pdf

PDF 55 KB Posted

Attached to
RECOVERY: Road Maintenance Federal contract opportunity
Solicitation number
AG-4419-S-09-0074
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center East

About this file

Davis-Bacon Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY: Road Maintenance, newest first.
File Type Posted
Pit-plan.pdf PDF
Pit-Plan_notes.pdf PDF
SF 1442 Cont_0074.pdf PDF
Experience_Capability Statement.doc DOC document
turnout_details.pdf PDF
culvert_details.pdf PDF
reconstructionMap.pdf PDF
SF 1442 cover pages.pdf PDF
construction_details.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: PA080004 07/24/2009 PA4

Superseded General Decision Number: PA20070004

State: Pennsylvania

Construction Types: Heavy and Highway

Counties: Allegheny, Armstrong, Beaver, Bedford, Blair, Butler, Cambria, Cameron, Centre, Clarion, Clearfield, Clinton, Crawford, Elk, Erie, Fayette, Forest, Franklin, Fulton, Greene, Huntingdon, Indiana, Jefferson, Lawrence, McKean, Mercer, Mifflin, Potter, Somerset, Venango, Warren, Washington and

Westmoreland Counties in Pennsylvania.

HEAVY AND HIGHWAY CONSTRUCTION PROJECTS (excluding sewer grouting projects and excluding sewage and water treatment plant projects)

Modification Number Publication Date

0 02/08/2008

1 02/22/2008

2 03/07/2008

3 03/21/2008

4 04/11/2008

5 05/30/2008

6 06/20/2008

7 06/27/2008

8 07/04/2008

9 07/18/2008

10 09/19/2008

11 10/03/2008

12 10/24/2008

13 11/07/2008

14 11/28/2008

15 12/05/2008

16 12/12/2008

17 12/19/2008

18 12/26/2008

19 01/02/2009

20 02/27/2009

21 03/06/2009

22 04/03/2009

23 04/17/2009

24 04/24/2009

25 05/01/2009

26 06/05/2009

27 06/12/2009

28 06/26/2009

29 07/03/2009

30 07/10/2009

31 07/24/2009

BOIL0013-005 09/30/2008

CENTRE, FRANKLIN, POTTER, CLINTON, FULTON, HUNTINDON AND

MIFFLIN COUNTIES

8/12/2009http://www.wdol.gov/wdol/scafiles/davisbacon/PA4.dvb

Rates Fringes

BOILERMAKER......................$ 38.81 25.26

BOIL0154-004 06/01/2008

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER, CAMBRIA,

CAMERON, CLARION, CLEARFIELD, CRAWFORD, ELK, FAYETTE, FOREST,

GREENE, INDIANA, JEFFERSON, LAWRENCE, MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON AND WESTMORELAND COUNTIES

BOILERMAKER......................$ 33.90 22.07

BOIL0744-003 07/01/2008

ERIE COUNTY

BOILERMAKER......................$ 35.34 18.48

BRPA0009-023 12/01/2008

BEAVER COUNTY

BRICKLAYER.......................$ 25.95 13.60

BRPA0009-024 12/01/2008

WASHINGTON (Cross Creek, Hanover, Jefferson, Mt Pleasant, Nottingham, Peters, Robinson, Smith, Union Twps) COUNTY

BRICKLAYER.......................$ 27.98 13.22

BRPA0009-025 12/01/2008

BUTLER, LAWRENCE, AND MERCER COUNTIES

BRICKLAYER.......................$ 25.95 13.48

BRPA0009-032 12/01/2008

FAYETTE (Jefferson & Washington Twps), GREENE (Except

Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND

WESTMORELAND (Rostraver Twp) COUNTIES

BRICKLAYER.......................$ 26.90 13.64

BRPA0009-033 12/01/2008

ARMSTRONG, CLARION (Brady, Madison, Perry, Tobe, Porter, Redbank Twps), FAYETTE (Except Jefferson & Washington Twps), GREENE (Cumberland, Dunkirk, Greene, Monongahelia Twps), INDIANA, AND WESTMORELAND (Except Rostrave Twp) COUNTIES

BRICKLAYER.......................$ 27.02 13.52

BRPA0009-034 05/01/2009

ERIE COUNTY

BRICKLAYER.......................$ 24.87 13.99

CARP2235-005 01/01/2009

PILEDRIVERMAN

Piledriverman (welder)......$ 29.15 12.10

Piledriverman...............$ 28.85 12.10

CARP2235-006 01/01/2007

Diver............................$ 40.40 10.77

Tender...........................$ 26.93 10.77

CARP2274-001 01/01/2009

CARPENTER (ALLEGHENY,

ARMSTRONG, BEAVER, BUTLER,

ERIE, FAYETTE, GREENE,

LAWRENCE, MERCER, WASHINGTON,

AND WESTMORELAND COUNTIES)

Carpenter (Welders).........$ 28.23 12.16

Carpenters..................$ 27.53 12.16

CARPENTER (BEDFORD, BLAIR,

CAMBRIA, CAMERON, CENTRE,

CLARION, CLINTON, CLEARFIELD,

CRAWFORD, ELK, FOREST,

FRANKLIN, FULTON, HUNTINGDON,

INDIANA, JEFFERSON, MCKEAN,

MIFFLIN, POTTER, SOMERSET,

VENANGO, AND WARREN COUNTIES)

Carpenters (Welders).......$ 27.99 12.16

Carpenters..................$ 27.28 12.16

ELEC0005-006 12/26/2008

ALLEGHENY, ARMSTRONG, BEDFORD, BLAIR, BUTLER CAMBRIA, CAMERON,

CENTRE (Remainder), CLARION, CLEARFIELD, ELK, FAYETTE, FULTON, GREENE, HUNTINGDON, INDIANA, JEFFERSON, MCKEAN, SOMERSET, VENANGO, WASHINGTON, AND WESTMORELAND COUNTIES

ELECTRICIAN......................$ 33.11 3%+$15.65

ELEC0056-004 06/01/2009

ERIE, FOREST AND WARREN COUNTIES

ELECTRICIAN......................$ 25.90 3%+16.32

ELEC0126-005 06/01/2008

ALLEGHENY, ARMSTRONG, BEAVER, BEDFORD, BLAIR, CAMBRIA, CENTRE,

CLARION, CLEARFIELD, FAYETTE, FULTON, GREENE, HUNTINGDON,

INDIANA, JEFFERSON, SOMERSET, WASHINGTON AND WESTMORELAND

Line Construction:

Groundman...................$ 21.22 26%+5.55

Lineman.....................$ 37.45 26%+5.55

Truck Driver................$ 23.09 26%+5.55

Winch Truck Operator........$ 24.96 26%+5.55

ELEC0126-007 06/01/2008

FRANKLIN AND MIFFLIN COUNTIES

Groundman...................$ 19.63 26%+5.55

Lineman.....................$ 34.65 26%+5.55

Truck Driver................$ 21.36 26%+5.55

Winch Truck Operator........$ 23.10 26%+5.55

ELEC0143-007 06/01/2009

FRANKLIN and MIFFLIN COUNTIES

ELECTRICIAN......................$ 27.20 14.69

ELEC0712-003 03/02/2009

CRAWFORD, BEAVER, LAWRENCE AND MERCER COUNTIES

ELECTRICIAN......................$ 29.20 17.48

ELEC0812-008 06/01/2007

CLINTON COUNTY

ELECTRICIAN......................$ 24.34 14.58

ELEC0812-009 06/01/2007

POTTER COUNTY

ELECTRICIAN......................$ 25.35 14.61

ELEC0812-011 06/01/2007

CENTRE COUNTY (Burnside, Curtin, Liberty, Howard, Marion, Walker, Miles, Haines Townships)

ELECTRICIAN......................$ 25.35 14.61

ELEC1319-004 08/31/2008

BUTLER, CAMERON, CLINTON, CRAWFORD, ELK, ERIE, FOREST,

LAWRENCE, MCKEAN, MERCER, VENANGO, WARREN AND POTTER COUNTIES

Groundman...................$ 24.53 17.13

Heavy Equipment Operator....$ 39.17 17.13

Lineman.....................$ 39.57 17.13

Truck Drivers...............$ 25.72 17.13

ENGI0066-016 01/01/2009

Power equipment operators:

(ALLEGHENY, ARMSTRONG,

BEAVER, BLAIR, BUTLER,

CAMBRIA, CENTRE, CLARION,

CLEARFIELD, CRAWFORD, ERIE,

ELK, FAYETTE, GREENE,

INDIANA, JEFFERSON, LAWRENCE,

MCKEAN, MERCER, SOMERSET,

VENANGO, WARREN, WASHINGTON,

AND WESTMORELAND COUNTIES)

GROUP 1.....................$ 26.38 14.44

GROUP 2.....................$ 26.12 14.44

GROUP 3.....................$ 22.47 14.44

GROUP 4.....................$ 22.01 14.44

GROUP 5.....................$ 21.76 14.44

Power equipment operators:

(BEDFORD, CAMERON, CLINTON,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, MIFFLIN, AND

POTTER COUNTIES)

GROUP 1.....................$ 26.09 14.44

GROUP 2.....................$ 25.81 14.44

GROUP 3.....................$ 22.17 14.44

GROUP 4.....................$ 21.68 14.44

GROUP 5.....................$ 21.47 14.44

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1 - Asphalt Paving Machine (Spreader), Autograde

(C.M.I. and similar); Backfiller, Compactor with Blade, Backhoe - 360 and 180 degree Swing; Cableway; Caisson Drill

(similar to Hugh Williams), Central Mix Plant; Cooling

Plant; Concrete Paving Mixer, Concrete Pump (self-propelled); Cranes; Cranes (boom or mast over 101ft.$.50 per each additional 50 feet inclusive of jib), Cranes

(Tower Stationary- Climbing Tower Crane); Derrick; Derrick

Boat; Dozer(greater than 25,000 lbs.); Dragline; Dredge;

Dredge Hydraulic; Elevating Grader; Franki Pile Machine;

Gradall (remote control or otherwise),Grader (power-fine grade); Hllift (4 cy. and over); Hoist 2 Drums or more (in one unit); Hydraulic Boom Truck with pivotal cab (single motor-Pitman or similar), (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used;)

Kocal; Mechanic, Locomotive (std. Gauge); Metro-chip

Harvester or similar; Milling Machine (Roto Mill or similar); Mix Mobile; Mix Mobile (with Self Loading

Attachment), Mucking Machine (tunnel); Pile Driver Machine;

Pipe Extrusion Machine; Prespliter Drill (self contained);

Refrigeration Plant (soil Stablization) Rough Terrain Crane

(25 ton over) (Boom and Mast over 101 feet will be paid an additional 50 feet inclusive of jib if used); Rough Terrain

Crane (under 25 ton), Scrapers; Shovel-Power; Slip form

Paver (C.M.I. and similar); Trenching Machine (30,000 lbs.

and over), Trenching Machine (under 30,000 lb.), Tunnell

Machine (Mark XXI Jarva or similar), Vermeer Saw, Whirley, Mechanic, Pipe bursting machine, Slip Lining machine

GROUP 2: Asphalt plant operator; auger (tractor mtd.); auger

(truck mtd.); belt loader (euclid or similar); boring machine; cable placer or layer; compactor with blade, concrete batch plant (electronically synchronized);

concrete belt placer (C.M.I. and similar); concrete finishing machine and spreader, concrete mixer (over 1 cy.)

concrete pump (stationary); core drill (truck or skid mtd.

- similar to penn drill), dozer (25,000 lbs or less); Ditch

Witch Saw, force feedloader; fork lift (lull or similar);

grader - power; grease unit opertor (head); guard rail post driver (truck mounted) guard rail post driver (skid type);

hilift (under 4 cy.); skid steer loader; hydraulic boom truck (non-pivotal cab); job work boat (powered), jumbo operator; locomotive (narrow guage); minor equipment operator (accumulative four units); mucking machine;

multi-head saw (groover); overhead crane; roller -power-asphalt; ross carrier; side boom or tractor mounted boom;

shuttle buggy (asphalt), stone crusher (screening-washing plants); stone spreader (self propelled) truck mounted drill (davey or similar); welder and repairman; well point pump operator.

GROUP 3: Broom Finisher (C.M.I. or similar);

Compactors/Rollers (static or vibratory (Self-propelled) on dirt or stone; Curb Builder; Minor Equipment Opertor (two or three units); Multi-head Tie Tamper; Pavement Breaker

(self-propelled or ridden); Soil Stablizer Machine; Tire

Repairman; Tractor (snaking and hauling); Well Driller and

Horizontal: Winch or "A" Frame Truck (when hoisting and lowering).

GROUP 4: Ballast Regulator; Compressor; Concrete Mixer (1

cy. & under with skip); Concrete Saw (Ridden or selp-propelled); Conveyor; Elevator (Material hauling only); Fork-lift (Ridden or self-propelled); Form Line

Machine; Generator; Groute Pump; Heater (Machinical); Hoist

(single Drum); Ladavator, Light Plant; Mulching Machine;

Personnel Boat (Powered), Pulverizer, Pumps, Seeding

Machine, spray Cure Machine (powered Driven); Subgrader;

Tie Puller; Tugger; Welding Machine (Gas or Diesel).

GROUP 5: Deck Hand; Farm Tractor; Fireman on Boiler; Oiler;

Power Broom; Side Delivery Shoulder Spreader (attachment).

IRON0003-001 06/01/2009

ALLEGHENY, FAYETTE, WESTMORELAND, CAMBRIA, INDIANA, ARMSTRONG,

BUTLER, BEAVER, CLARION, AND WASHINGTON COUNTIES

IRONWORKER.......................$ 29.43 21.25

IRON0207-002 06/01/2009

LAWRENCE, MERCER, AND VENANGO COUNTIES

IRONWORKER.......................$ 26.66 16.83

IRON0348-002 06/01/2009

CRAWFORD, ERIE, FOREST, AND WARREN COUNTIES

IRONWORKER.......................$ 25.33 20.17

IRON0404-008 07/01/2009

FRANKLIN (Remainder), HUNTINGDON (Remainder), AND MIFFLIN

COUNTIES

IRONWORKER, STRUCTURAL...........$ 27.07 21.85

IRON0549-002 12/01/2008

GREENE COUNTY

IRONWORKER.......................$ 28.75 10%+15.69

IRON0568-004 05/01/2009

BEDFORD, FRANKLIN (Southwest 1/3), FULTON, HUNTINGDON (Western

2/3), AND SOMERSET COUNTIES

Ironworkers:

Sheeter, Bucker-Up..........$ 26.33 12.88

Structural, Ornamental, Reinforcing, Machinery

Mover, Rigger & Machinery

Erector, Welder, Fence

Erector.....................$ 26.08 12.88

IRON0772-001 06/01/2009

BLAIR, CAMERON, CENTRE, CLEARFIELD, CLINTON, ELK, JEFFERSON,

MCKEAN AND POTTER COUNTIES

IRONWORKER.......................$ 24.73 19.94+A

A. HOLIDAYS

The following holidays shall be observed: New Years Day, Goodfriday, Memorial Day, Fourth of July, Labor Day, Veterans Day (Observed the day after Thanksgiving), Thanksgiving Day, Christmas Day.

Any holiday which occurs on Sunday shall be observed the following Monday.

LABO1058-001 01/01/2009

LABORER (BEDFORD, CAMERON,

CENTRE, CLINTON, CRAWFORD,

FOREST, FRANKLIN, FULTON,

HUNTINGDON, JEFFERSON,

MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 23.20 12.65

GROUP 2.....................$ 23.36 12.65

GROUP 3.....................$ 23.85 12.65

GROUP 4.....................$ 24.30 12.65

GROUP 5.....................$ 24.71 12.65

GROUP 6.....................$ 21.55 12.65

GROUP 7.....................$ 24.20 12.65

GROUP 8.....................$ 25.70 12.65

Laborers: (ALLEGHENY, ARMSTRONG, BEAVER, BLAIR, BUTLER, CAMBRIA, CLARION, CLEARFIELD, ELK, ERIE, FAYETTE, GREENE, INDIANA, LAWRENCE, MCKEAN, MERCER, SOMERSET, VENANGO, WARREN, WASHINGTON, AND WESTMORELAND

COUNTIES)

GROUP 1.....................$ 23.30 12.65

GROUP 2.....................$ 23.46 12.65

GROUP 3.....................$ 23.85 12.65

GROUP 4.....................$ 24.30 12.65

GROUP 5.....................$ 24.71 12.65

GROUP 6.....................$ 21.55 12.65

GROUP 7.....................$ 24.30 12.65

GROUP 8.....................$ 25.80 12.65

LABORERS CLASSIFICATIONS

GROUP 1: Asphalt curb sealer; Asphalt tamper; Batcherman

(weigh) Blaster,Boatman, Brakeman, Change house attendant, Coffer dam, Concrete curing pitman, Puddler, Drill Runner's helper (Includes Drill Mounted on Truck, Track, or similar and Davey Drill Spots, Clean up, helps to maintain), Electric Brush and or Grinder, Fence Construction

(Including Fence Machine Operator) Form stripper and Mover, Gabion (Erectors and Placers) Hydro jet blaster nozzleman;

Landscape laborer, Manually moved emulusion sprayer, Radio actuated traffic control operator Rip rap work, scaffolds and Runways, Sheeters and Shorers (includes lagging) structural concrete Top Surfacer, Walk Behind Street

Sweeper, and Wood Chipper

GROUP 2: Air tool operator (all types); Asphalt, batch & concrete plant operator (manually operated) Burner, Caisson; men (open air); Carryable pumps; Chain saw operator including attachments, Cribbing, (concrete or steel); Curb machine operator (asphalt or concrete walk behind); Diamond head Core Drller, Drill runner's helper

(tunnel) Fork Lift, (walk behind), Form Setter (Road Forms

Line man) Highway Slab reinforcement placers (including joint and Basket Setters) Hydraulic pipe pusher; Liner plates (Tile or Vitrified Clay) Mechanical compacting equipment operators, Mechanical joint sealer, Dope pot and

Tar Kettle, Mortar mixer (hand or machine) Muckers, Brakemen & all other Labor, (Includes installation of utility lines) Pipe Layers /Fusion /Heating Iron

(Regardless of materials) Portable Single Unit Conveyor, Post Hole Auger, (2 or 4 cycle hand operated) Power wheelbarrows and buggies, Rail porter or similar; Sand blaster;Signal Man,Vibrator operator, Crown Screed

Adjuster, All RAILROAD TRACK WORK TO INCLUDE THE FOLLOWING:

adzing machine, ballast Router, Bolting Machine, Power

Jacks, Rail Drills, Railroad Brakeman,Rail Saws, Spike

Drivers (Manually or hand held tool) Spike Pullers Tamping

Machine, Thermitweld

GROUP 3: Asphalt Luteman/Raker,Blacksmith, Blaster, Brick, stone and block pavers and block cutters (wood, belgian and asphalt); Cement mortar lining car pusher; Cement mortar mixer (pipe relining); Cement mortar pipe reliners;

concrete saw operator (walk behind); Curb cutters and setters; Elevated roadway drainage construction; erector of overhead signs, Form setter (road forms-lead man); Grout machine operator; Gunite or dry pack gun (nozzle and machine man); Manhole or catch basin builder (Brick block concrete or any prefabrication) Miners and drillers

(including lining, supporting and form workmen, setting of shields, miscellaneous equipment and jumbos); Multi-plate pipe (aligning and securing); Placing wire mesh on gunite projects; Wagon drill operators (air track or similar);

Walk behind ditching machine (trencher or similar)

GROUP 4: Reinforcing Steel Placer (Bending, aligning, and securing, Cadweld)

GROUP 5:High Burner, (Any burning not done from deck), Welder

(Pipeline)

GROUP 6: Uniformed Flagperson, Watchman

GROUP 7: Toxic/Hazardous Waste Removal Laborer Levels C & D

GROUP 8: Toxic/Hazardous Waste Removal Laborer Levels A & B

PAIN0021-019 05/01/2009

CLINTON COUNTY

Painters:

Bridge......................$ 25.60 12.05

Brush & Roller..............$ 24.65 12.05

Spray.......................$ 25.65 12.05

PAIN0021-024 05/01/2009

FRANKLIN COUNTY

PAINTER

Brush.......................$ 22.17 8.90

PAIN0057-014 06/01/2009

ALLEGHENY, FAYETTE, GREEN, WASHINGTON COUNTIES

Bridge......................$ 30.10 12.34

Brush & Roller..............$ 27.53 12.34

Spray.......................$ 28.06 12.34

PAIN0057-015 06/01/2009

ARMSTRONG, BEAVER, BEDFORD, BLAIR, BUTLER,CAMBRIA, CENTRE,

CLARION, CLEARFIELD, ELK, FULTON, HUNTINGTON, INDIANA,

JEFFERSON, LAWRENCE, MERCER, MIFFLIN, SOMERSET, VENANGO AND

WESTMORELAND COUNTIES

Bridge......................$ 30.10 12.34

Brush and Roller............$ 27.53 12.34

Spray.......................$ 28.06 12.34

PAIN0057-022 05/01/2009

Painters: (ERIE, McKEAN, AND

WARREN (Including Columbus and Freehold twps) COUNTIES)

Bridges,Stacks,Towers.......$ 22.52 11.60

Brush and Roller............$ 20.52 11.60

Spray and Sandblasting......$ 21.27 11.60

PAIN0057-027 06/01/2009

CAMERON, CRAWFORD, POTTER, WARREN, (Excluding Columbus and

Freehold twps)

PAINTER

Brush and Roller............$ 22.49 11.84

PLAS0526-002 01/01/2009

CEMENT MASON/CONCRETE FINISHER

Beaver, Cameron, Clarion, Crawford, Elk, Forest, Lawrence, McKean, Potter, Venango and Warren

Counties....................$ 26.72 12.97

Bedford, Blair, Cambria, Centre, Clinton, Huntingdon, Mifflin and

Somerset Counties...........$ 26.72 12.97

All Other Counties..........$ 26.72 12.97

PLUM0027-001 06/01/2009

ALLEGHENY, ARMSTRONG, GREENE (Except extreme Eastern portion), WASHINGTON (Except extreme Eastern portion) and WESTMORELAND

(City of Arnold and City of New Kensington Only) COUNTIES

Plumbers and Pipefitters

(Bridge Drain Pipe)..............$ 33.75 16.37

PLUM0047-005 05/01/2009

BEAVER, BUTLER, MCKEAN, MERCER, VENANGO, CLARION, LAWRENCE,

FOREST, WARREN, CRAWFORD, AND ERIE COUNTIES

(Bridge Drain Pipe)..............$ 34.18 16.90

PLUM0354-005 06/01/2009

BEDFORD, BLAIR, CAMBRIA, CAMERON, CLEARFIELD, ELK, FAYETTE,

GREENE (Extreme Eastern portion), HUNTINGDON, INDIANA, JEFFERSON, SOMERSE, WASHINGTON (Extreme Eastern portion), AND

WESTMORELAND COUNTIES

(Bridge Drain Pipe)..............$ 28.54 18.48

TEAM0040-001 01/01/2009

TRUCK DRIVER (ALLEGHENY,

ARMSTRONG, BEAVER, BLAIR,

BUTLER, CAMBRIA, CENTRE,

CLARFIELD, CRAWFORD, ERIE,

FAYETTE, GREENE, INDIANA,

JEFFERSON, LAWRENCE, MCKEAN,

MERCER, SOMERSET, VENANGO,

WARREN, WASHINGTON, AND

WESTMORELAND)

GROUP 1.....................$ 24.23 $11.44 A+B

GROUP 2.....................$ 24.38 $11.51 A+B

GROUP 3.....................$ 24.91 $11.75 A+B

Truck drivers: (BEDFORD, CAMERON, CLAIRON, CLINTON, ELK, FOREST, FRANKLIN, FULTON, HUNTINGDON, MIFFLIN, AND POTTER COUNTIES)

GROUP 1.....................$ 24.05 $11.35 A+B

GROUP 2.....................$ 24.23 $11.44 A+B

GROUP 3.....................$ 24.74 $11.69 A+B

FOOTNOTES: A. Hazardous/toxic waste material/work level A

& B receive additional $2.50 per hour above classification rate

B. Hazardous/toxic waste materials/Work level C & D receive

$1.00 per hour above classification

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Single Axle (2 axles including steering axle);

Includes partsman and warehoueman

GROUP 2 - Tandem - Tri-Axle - Semi-Tractor Trailer

(combination) (3 axles or more including steering axle)

GROUP 3 - Specialty Vehicles; Heavy equipment whose capacity exceeds that for which state licenses are issued specifically refers to units in excess of eight (8) feet width (such as Euclids, Atley Wagon, Payloder, Tournawagons, and similar equipment when not self loaded);

Tar and Asphalt Distributors Trucks, Heavy Duty Trailer, such as Low Boy, High Boy

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .