SF30.Amendment No 3.pdf
PDF 139 KB Posted
- Attached to
- Elkwater Fork Mitigation Project Federal contract opportunity
- Solicitation number
- AG-3D47-S-09-0015
About this file
AMENDMENT NO. 3 (SF-30) AND CONTINUATION SHEET
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed Bid Abstract.pdf | ||
| AG 3D47 S 09 0015.IFB.Elkwater Mitigation.Amend3.pdf | ||
| AG 3D47 S 09 0014.SF30.Amend 2.pdf | ||
| Elkwater Fork Mitigation - Final Design Drawings.pdf | ||
| davis bacon.highway rates.pdf | ||
| Constr_Specs_EWF.pdf | ||
| Elkwater Fork Mitigation - Design Drawings.pdf | ||
| AG 3D47 S 09 0015.IFB.Elkwater Mitigation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-3D47-S-09-0015
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
NRCS-WV-123D47
MORGANTOWN WV 26505
ROOM 301
75 HIGH STREET
USDA-NRCS-WEST VIRGINIA STATE OFFIC
NRCS-WV-123D47
MORGANTOWN WV 26505
ROOM 301
75 HIGH STREET
USDA-NRCS-WEST VIRGINIA STATE OFFIC
08/28/2009000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/31/2009
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide:
1. the Questions and Answers from the Site Showing held on August 12, 2009 and those submitted via email or by telephone.
2. the List of Attendees from the Site Showing which was held August 12, 2009.
3. the Revised Drawings and Specifications
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
AMY BOLYARD
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-3D47-S-09-0015/000003
4. the Revised Pages to the Solicitation
5. the instructions for CCR and ORCA
6. information regarding Davis Bacon Act and
Conformance of wage rates
All other items in the solicitation remain the same.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
AG-3D47-S-09-0015
Amendment No.3
REMOVE INSERT
SF-30
Continuation Sheet
Elkwater Fork On-Site Mitigation Project Elkwater Fork Dam, Randolph County, West Virginia
1. This amendment transmits the Meeting Attendees List for the pre-bid site showing, the Questions and Answers for the pre-bid site showing, and changes to the specifications, drawings, and contract provisions.
2. Attachment No. 1, “Meeting Attendees List”.
3. Attachment No. 2, “Questions and Answers”.
4. Attachment No. 3, “Changes to Construction and Material Specifications”. The following is a list of the specifications revised by this amendment. Unless otherwise noted, filing instructions are to remove the following construction and material specifications and replace with the revised pages dated “August 2009”.
PAGES DATED PAGES
DATE
D CHANGES
Spec List Page 1 of 1 7/10/2009 Spec List Page 1 of 1 8-13-09 Specification 91 added to list
2-3 7/10/2009 2-3 8-13-09 Changed item name, 7.a.(6)(a)
8-2,8-3 7/10/2009 8-2,8-3 8-13-09 Changed first sentence, 4.a.(5); changed item name, 4.a.(10)(d)
21-5,21-6 7/2/2009 21-5,21-6 8-13-09
Changed item name, 10.a.(8)(b);
Mobilization added to 10.b.(1); Bid Item 9 added and Bid Item 21 corrected, 10.b.(4)
23-8 7/10/2009 23-8 8-13-09 Changed item name, 10.b.(6)( c )
32-7, 32-8, 32-9 7/2/2009 32-7, 32-8, 32-9 8-26-09
Add Excavation item to 24.c.(8) and renumber. ASTM reference for aggregate replaces AASHTO.
44-3 7/2/2009 44-3 8-13-09 Changed 9.a(4), class 1 to class 2 geotextile.
460-2, 460-3 7/10/2009 460-2, 460-3 8-13-09
Revised Section 6 regarding stream crossings
Changed item name, 10.a.(2),(d)
CONTINUATION SHEET FOR SF-30
ELKWATER FORK ON-SITE MITIGATION PROJECT
AMENDMENT NO. 3
5. Attachment No. 4, “Changes to Construction Drawings”. The following is a list of construction drawings revised by this amendment. Filing instructions are to remove the following sheets and replace with revised sheets dated “08/26/09, Revision #1”.
REMOVE INSERT
PAGES DATED PAGES
DATE
D CHANGES
Sheet 1 of 14 7/10/09 Sheet 1 of 14 8-26-09 See Revisions Block
* Sheet 2 – See Changes Column
* On sheet 2, manually change “Sheet 3” of Note 2 of the Silt Fence Detail to read
“Sheets 7 & 10”. Approximate silt fence locations are shown on Sheet 7.
Sheet 6 of 14 7-09 Sheet 6 of 14 8-26-09 Typ. Sidewalk Detail and Notes, Changed
4,000 psi to 3,000 psi Concrete
Sheet 7 of 14 7-09 Sheet 7 of 14 8-26-09 Changed quantity of Rock Ford Stream
Crossings
Sheet 11 of 14 7-09 Sheet 11 of 14 8-26-09 Revised Geotextile Notes on Typical Hiking
Trail Sections
Sheet 12 of 14 7-09 Sheet 12 of 14 8-26-09 Erosion Control Matting applies to both sides of channel, Section F. Added line.
Sheet 14 of 14 7-09 Sheet 14 of 14 8-?-09
Added Section P/14; Changed Note 3 Section C/14; Added Geotextile arrows to
Section B/14.
6. Changes to Solicitation Package/Contract Provisions The following pages have been changed in the solicitation package. Please replace the following pages with the Revised Pages in this Amendment.
Change to Solicitation Package Page to Replace Clerical Changes in Table of Contents Table of Contents (page i) Clerical Change (Numbering of pages in Section H) Pages 14-21 Addition of Special Provision in Section H Page 21 Clerical Change- Addition of Spec 91 in Listing Page 35
7. Other Items included in this Amendment
1. Full text version of the Davis Bacon Act Clause (52.222-6)
2. Federal Division of Labor Rules for Conformance
3. Instructions for Registering at CCR.gov
4. Instructions/Help for Registering with ORCA
| Amendment3-ContinuationSheet_Revised.pdf |
| SF-30 |
File details come from the government source that posted it. Updated .