AMENDMENT NO. 3 (SF-30) AND CONTINUATION SHEET

View the file

Other files for this federal contract opportunity

Other files attached to Elkwater Fork Mitigation Project, newest first.
File Type Posted
Signed Bid Abstract.pdf PDF
AG 3D47 S 09 0015.IFB.Elkwater Mitigation.Amend3.pdf PDF
AG 3D47 S 09 0014.SF30.Amend 2.pdf PDF
Elkwater Fork Mitigation - Final Design Drawings.pdf PDF
davis bacon.highway rates.pdf PDF
Constr_Specs_EWF.pdf PDF
Elkwater Fork Mitigation - Design Drawings.pdf PDF
AG 3D47 S 09 0015.IFB.Elkwater Mitigation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-3D47-S-09-0015

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-WV-123D47

MORGANTOWN WV 26505

ROOM 301

75 HIGH STREET

USDA-NRCS-WEST VIRGINIA STATE OFFIC

NRCS-WV-123D47

MORGANTOWN WV 26505

ROOM 301

75 HIGH STREET

USDA-NRCS-WEST VIRGINIA STATE OFFIC

08/28/2009000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/31/2009

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide:

1. the Questions and Answers from the Site Showing held on August 12, 2009 and those submitted via email or by telephone.

2. the List of Attendees from the Site Showing which was held August 12, 2009.

3. the Revised Drawings and Specifications

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

AMY BOLYARD

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-3D47-S-09-0015/000003

4. the Revised Pages to the Solicitation

5. the instructions for CCR and ORCA

6. information regarding Davis Bacon Act and

Conformance of wage rates

All other items in the solicitation remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

AG-3D47-S-09-0015

Amendment No.3

REMOVE INSERT

SF-30

Continuation Sheet

Elkwater Fork On-Site Mitigation Project Elkwater Fork Dam, Randolph County, West Virginia

1. This amendment transmits the Meeting Attendees List for the pre-bid site showing, the Questions and Answers for the pre-bid site showing, and changes to the specifications, drawings, and contract provisions.

2. Attachment No. 1, “Meeting Attendees List”.

3. Attachment No. 2, “Questions and Answers”.

4. Attachment No. 3, “Changes to Construction and Material Specifications”. The following is a list of the specifications revised by this amendment. Unless otherwise noted, filing instructions are to remove the following construction and material specifications and replace with the revised pages dated “August 2009”.

PAGES DATED PAGES

DATE

D CHANGES

Spec List Page 1 of 1 7/10/2009 Spec List Page 1 of 1 8-13-09 Specification 91 added to list

2-3 7/10/2009 2-3 8-13-09 Changed item name, 7.a.(6)(a)

8-2,8-3 7/10/2009 8-2,8-3 8-13-09 Changed first sentence, 4.a.(5); changed item name, 4.a.(10)(d)

21-5,21-6 7/2/2009 21-5,21-6 8-13-09

Changed item name, 10.a.(8)(b);

Mobilization added to 10.b.(1); Bid Item 9 added and Bid Item 21 corrected, 10.b.(4)

23-8 7/10/2009 23-8 8-13-09 Changed item name, 10.b.(6)( c )

32-7, 32-8, 32-9 7/2/2009 32-7, 32-8, 32-9 8-26-09

Add Excavation item to 24.c.(8) and renumber. ASTM reference for aggregate replaces AASHTO.

44-3 7/2/2009 44-3 8-13-09 Changed 9.a(4), class 1 to class 2 geotextile.

460-2, 460-3 7/10/2009 460-2, 460-3 8-13-09

Revised Section 6 regarding stream crossings

Changed item name, 10.a.(2),(d)

CONTINUATION SHEET FOR SF-30

ELKWATER FORK ON-SITE MITIGATION PROJECT

AMENDMENT NO. 3

5. Attachment No. 4, “Changes to Construction Drawings”. The following is a list of construction drawings revised by this amendment. Filing instructions are to remove the following sheets and replace with revised sheets dated “08/26/09, Revision #1”.

REMOVE INSERT

PAGES DATED PAGES

DATE

D CHANGES

Sheet 1 of 14 7/10/09 Sheet 1 of 14 8-26-09 See Revisions Block

* Sheet 2 – See Changes Column

* On sheet 2, manually change “Sheet 3” of Note 2 of the Silt Fence Detail to read

“Sheets 7 & 10”. Approximate silt fence locations are shown on Sheet 7.

Sheet 6 of 14 7-09 Sheet 6 of 14 8-26-09 Typ. Sidewalk Detail and Notes, Changed

4,000 psi to 3,000 psi Concrete

Sheet 7 of 14 7-09 Sheet 7 of 14 8-26-09 Changed quantity of Rock Ford Stream

Crossings

Sheet 11 of 14 7-09 Sheet 11 of 14 8-26-09 Revised Geotextile Notes on Typical Hiking

Trail Sections

Sheet 12 of 14 7-09 Sheet 12 of 14 8-26-09 Erosion Control Matting applies to both sides of channel, Section F. Added line.

Sheet 14 of 14 7-09 Sheet 14 of 14 8-?-09

Added Section P/14; Changed Note 3 Section C/14; Added Geotextile arrows to

Section B/14.

6. Changes to Solicitation Package/Contract Provisions The following pages have been changed in the solicitation package. Please replace the following pages with the Revised Pages in this Amendment.

Change to Solicitation Package Page to Replace Clerical Changes in Table of Contents Table of Contents (page i) Clerical Change (Numbering of pages in Section H) Pages 14-21 Addition of Special Provision in Section H Page 21 Clerical Change- Addition of Spec 91 in Listing Page 35

7. Other Items included in this Amendment

1. Full text version of the Davis Bacon Act Clause (52.222-6)

2. Federal Division of Labor Rules for Conformance

3. Instructions for Registering at CCR.gov

4. Instructions/Help for Registering with ORCA

Amendment3-ContinuationSheet_Revised.pdf
SF-30

File details come from the government source that posted it. Updated .