Comers_Rock_Overlook_Restoration_-_Technical_Proposal.docx
DOCX document 18 KB Posted
- Attached to
- Comers Rock Overlook Restoration Federal contract opportunity
- Solicitation number
- AG-3395-S-13-0032
About this file
Technical Proposal Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FS_EM-7720-103_Std_Spec_for_Constrxn_and_Maint_of_Trails.pdf | ||
| Comers_Rock_Overlook_Restoration_-_Statement_of_Intent.docx | DOCX document | |
| Comers_Rock_Overlook_Restoration_-_Project_Requirements.docx | DOCX document | |
| Comers_Rock_Overlook_Restoration_-_SOI.docx | DOCX document | |
| Comers_Rock_Overlook_Restoration_-_p.w._index.docx | DOCX document | |
| Technical_Capability-Experience-Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comers Rock Overlook Restoration Technical Proposal (Note: Where necessary, use additional sheets) A. Describe the overall design approach for restoring the posts and rails at the overlook, including dimensions of features, spacing, and general appearance. Attach sketches to illustrate the design approach. Attach photos, if appropriate, that illustrate the general appearance and aesthetic of the proposed design.
B. Describe the materials to be used at the overlook and the sources of those materials.
C. Describe the methods of construction to be used at the overlook, including how this will impact the access needed and the project schedule.
Comers Rock Overlook Restoration, Technical Proposal D. Discuss how requirements identified in the solicitation (for overlook) will be addressed by this design.
E. What aspects of this design (for the overlook) are addressing cost control for the project?
F. Discuss other aspects of the design (for the overlook) that help to justify it as the ideal approach.
Comers Rock Overlook Restoration, Technical Proposal G. Bid Option #2: Describe the proposed handrail design and installation procedures for the trail. Attach photos, if appropriate, that illustrate the general appearance and aesthetic of the proposed design for the handrail.
File details come from the government source that posted it. Updated .