Plotseed_Planter_Specifications.pdf

PDF 41 KB Posted

Attached to
ROWPLOTSEED PLANTER EQUIPMENT Federal contract opportunity
Solicitation number
AG-32SD-SS-763603
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

Row/Plotseed Planter Specifications

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Planter Specifications

A new planter is required to sow a multitude of crops, ranged from grass seed and alfalfa to soybean, has different seed shape and size varied from 0.5-1.8mm to 3.2-8.0mm and in various plant densities and plot arrangements. The following specifications are required for planting field trials: precision planting capability for uniform distribution of seeds both intra- and inter-row for precise plant population.

Capable of even distribution of small quantities of small seeded crops in row spacing of 7.5 inches or wider for as many as 12 rows. Ability to plant plots at infinite lengths in the range of 7 to 100 feet.

Belted cone seed distributer of 12 rows outlet distributer for seeding at 7.5 inches between rows. Second belted cones to plant 1-row, 2-row and 4-row plots at 30 inches row spacing. Single funnel for filling a row and central feeder for filing 12 rows simultaneously. Seed depth accuracy via mechanically driven Great Plains double disk openers with pressure wheel. Individual opener down pressure. Stable frame and easy adjustment of the track width and row spacing. Driving wheels and integrated drive for changes in speed gear. Universal platform for seed deposit and seat for the operator. Plot management hardware and software compatible with existing tractor-based Tremble GPS auto steer system and FMXlOOO monitor. Communication software and cable connections for sequential control and monitoring. Parts kit. Availability of parts from a USA vendor. Prompt delivery time. Initial setup and training.

File details come from the government source that posted it. Updated .