Condensing_Boiler_SOW.pdf
PDF 71 KB Posted
- Attached to
- Install Boiler Federal contract opportunity
- Solicitation number
- AG-32SD-S-17-0014
About this file
Condensing Boiler SOW
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AG-32SD-S-17-0014_001.pdf | ||
| Wage_Determination_OR170022_01-13-2017__OR22.pdf | ||
| RFI_FORM.pdf | ||
| Calculation_of_Self_Performed_Work.pdf | ||
| AG-32SD-S-17-0014-1.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Project Title: “Condensing Boiler Installation”
2. Government Points of Contact
Contracting Officer (CO):
Jeff Ridenour
(309) 363-5914 Peoria, IL jeffery.ridenour@ars.usda.gov
Research Program Representative (RPR):
Bob Martin
(541) 738-4041 Corvallis, OR bob.martin@ars.usda.gov
Occupational Health and Safety Representative:
Jeff Strang
(510) 559 6002 Albany, CA jeff.strang@ars.usda.gov
Location Monitor(LM):
Joe Sears
(514) 738-4007 Corvallis, OR joe.sears@ars.usda.gov
3. Location: The site of work is located at the Agricultural Research Service, Horticultural Crop Research Laboratory, Corvallis, OR.
4. Site Visit: A site visit and inspection tour is required. Vendor will be notified of the exact time and date to attend the site visit.
5. Scope of Service: The contractor shall provide all professional services necessary for the accomplishment of the contract project and such required services shall be in accordance with requirements as described herein.
a) The Contractor shall provide services for the following tasks marked by an “X”.
[X] Provide a technical and cost proposal to complete the project as per project requirements.
[X] Provide and install all material to complete the project as per project requirements.
mailto:jeffery.ridenour@ars.usda.gov mailto:bob.martin@ars.usda.gov mailto:jeff.strang@ars.usda.gov mailto:joe.sears@ars.usda.gov
6. Project Requirements: Contractor shall furnish a technical and cost proposal to provide services to remove and dispose of existing identified Sectional Boiler and install new Condensing Boiler, and Vent Piping. The contractor shall also provide supporting electrical cabling, conduit, and accessories/components as required for complete installation. The contractor shall provide a turn-key product including proper installation of all material and equipment per manufacturer’s recommendations.
a) The contractor shall work with the site personnel to ensure project is accomplished in a timely manner.
b) Davis Bacon Wage Rates apply to all construction contracts in excess of $2,000. Employee payroll logs for the project will be required to verify application of accurate wage rates.
c) Projects in excess of $35,000 will require a bid bond. Additional, Payment and Performance bonds will be required for projects exceeding $35,000. Obtaining and the cost of these bonds is the responsibility of the Contractor. Contractor shall provide proof of Insurance.
File details come from the government source that posted it. Updated .