Attachment_I_-_Statement_of_Work.pdf
PDF 185 KB Posted
- Attached to
- Janitorial Services-Base plus 4 Option Years Federal contract opportunity
- Solicitation number
- AG-32SD-RFQ-15-MD15
About this file
Attachment I-Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_ _A's_for_AG-32SD-RFQ-15-MD15_(08-12-2015).pdf | ||
| Q_ _A's_for_AG-32SD-RFQ-15-MD15_(8-6-2015).pdf | ||
| AG-32SD-RFQ-15-MD15__Amendment_02.pdf | ||
| AG-32SD-RFQ-15-MD15_-_Amendment_01.pdf | ||
| AG-32SD-RFQ-15-MD15.pdf | ||
| Attachment_III_-_Service_Wage_Determination.pdf | ||
| Attachment_II_-_Buildings_and_Layout_of_Area.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment I
Specifications/Statement of Work Janitorial Services
USDA, ARS, PA
Grassland Soil and Water Research Laboratory Temple, Texas
BASE Year - Oct. 1, 2015 through Sept. 30, 2016
OPTION Year 1 - Oct. 1, 2016 through Sept. 30, 2017 OPTION Year 2 - Oct. 1, 2017 through Sept. 30, 2018 OPTION Year 3 - Oct. 1, 2018 through Sept. 30, 2019 OPTION Year 4 - Oct. 1, 2019 through Sept. 30, 2020
RFQ No.: AG-32SD-RFQ-14-MD15
Page | 1
JANITORIAL SERVICE SPECIFICATIONS
USDA-ARS Grassland, Soil and Water Research Laboratory 808 East Blackland Road
Temple, TX 76502
A. Period of Performance
BASE Period: 10/01/2015 through 09/30/2016 OPTION Year 1: 10/01/2016 through 09/30/2017 OPTION Year 2: 10/01/2017 through 09/30/2018 OPTION Year 3: 10/01/2018 through 09/30/2019 OPTION Year 4: 10/01/2019 through 09/30/2020
SCOPE OF WORK
The services specified in Matrix of Services shall be performed by the Contractor in accordance with the requirements of this specification. Such services shall include the providing of all labor and supervision necessary for performance of the work specified herein.
B. CONTRACT SPECIFICATIONS
The USDA, ARS, Southern Plains Range Research Station is located at 2000 18th Street, Woodward, OK 73801.
The Contractor, in accordance with the requirements of this Statement of Work (SOW), shall perform the services identified in the Matrix of Services. Such services shall include the providing of all labor and supervision necessary for performance of the work specified herein. The Government has made an effort to provide an estimated square footages. It is the responsibility of all prospective quoters to visit the site and make appropriate determinations of size of areas and services required within each area. All consumables used in this contract will be furnished by the U.S. Government, to include paper towels, toilet paper, soap, plastic can liners, some floor care products, and any other consumables needed to complete this scope of work.
A site visit is scheduled for August 13, 2015 at 9:00 a.m. Central Time at the site where services shall be provided.
Quoters are advised to visit the site and fully inform themselves as to the location of the work, verify areas to be cleaned and the conditions under which the work is to be performed prior to submitting a quotation.
Failure to do so will not relieve the successful quote of their responsibility under the resulting contract.
For Directions to the Site please contact Janice Brown, Location Site Manager (LSM) at (254) 770-6543 or Email at Janice.brown@ars.usda.gov.
C. Supervision:
Prior to commencement of services, the contractor shall furnish to the Contracting Officer Representative (COR), a list of employees they propose to use in the performance of the on-site work required and designate the On- Site Manager who will be responsible for supervision of such employees. The Manager shall:
a. be the Contractor's primary on-site representative, having the Contractor's full authority to act on matters pertaining to the performance of services under this contract;
b. notify the LSM of any work scheduled to be performed on Saturday or Sunday;
mailto:Janice.brown@ars.usda.gov
Page | 2
c. report damage to Government property, loss of keys, personal injuries, and/or hazardous conditions, to the LSM within 24 hours after occurrence.
d. report any facility maintenance issues to the LSM within 24 hours, to include leaks, plumbing problems in restrooms, exterior locks not working, etc.
D. Responsibility for Performance:
The Contractor shall be directly responsible for work performance specified in the contract. The Contractor shall provide adequate supervision at all times.
Contractor shall be responsible for background checks on any employees on site. The contractor will provide a police report on each employee to the LSM prior to bringing that employee on site.
E. Quality Control:
The Contractor shall establish a quality control program to assure the requirements of the contract are provided as specified. The program shall include, but not be limited to the following:
a. An inspection system covering all services being performed.
b. A method of identifying deficiencies in the quality of services.
F. Key Control:
The Contractor shall establish and implement methods of insuring that all keys issued to the Contractor by the U.S. Government are not lost, misplaced, or used by unauthorized personnel. NO KEYS SHALL BE DUPLICATED, and such action would be cause for immediate termination of the contract by the U.S. Government.
If a building key or a master key is lost, all locks and keys for that system will be replaced by the Government and the total cost deducted from any payment due the Contractor. Estimated cost is in excess of $10,000.00.
G. Conduct of Contractor Employees:
Contractor personnel shall comply with the Laboratory's traffic regulations and other policies pertaining to the conduct of persons on Government facilities. They shall not disturb papers on desks, open desks or cabinets, or use office equipment. Extreme care must be exercised while cleaning in laboratories due to sensitivity of delicate instruments located therein. Use of the telephone is provided only for emergency calls. Contractor personnel shall utilize energy conservation policies by not adjusting heating/cooling devices, and by turning off lights in unoccupied areas, unless, otherwise directed. Contractor personnel shall not enter any area where janitorial services are not rendered.
All outside doors will be secured while janitorial work is being performed in the buildings.
All Government facilities are "Smoke and Drug-Free." Smoking is not permitted inside any Government building.
Use designated smoking areas.
Children under age 18 are not allowed on site. Presence of minors accompanying any contractor employee will be cause for immediate termination of the contract by the U.S. Government.
H. U.S. Government-Furnished Equipment and Supplies:
a. High-speed buffing and polishing machine; vacuum cleaning machine (for carpeted areas)
Page | 3
1. All equipment shall have bumpers and guards to prevent marking or scratching fixtures, furniture, or building surfaces.
2. All equipment used shall have the necessary safety protection and be UL approved. Equipment must operate using existing building circuits.
b. Supplies to include plastic trash bags, toilet tissue, soap, wax, stripper, window cleaner, bowl cleaner, liquid cleaner, mops (wet or dry), brooms, mop buckets, paper towels.
I. Period of Performance and Location:
The Contractor shall, in accordance with the frequencies delineated in the Matrix of Services, perform Janitorial Services for the USDA-ARS Grassland, Soil and Water Research Laboratory, Temple, Texas, in the buildings depicted on the sketch attached to the Matrix of Services.
Such services shall be performed during the time period of 5:00 p.m. (4:30 p.m. for auto shop) through 12:00 a.m. Monday through Friday, excluding weekends and Federal Holidays. THE ONLY WORK ALLOWED ON WEEKENDS SHALL BE MAJOR WORK (stripping and re-waxing halls and labs).
No services required on Federal Holidays (or on the day of observance if the holiday falls on a weekend): New Year’s Day, Martin Luther King Birthday, President’s Day, Memorial Day, July 4th, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving, and Christmas.
J. Payment:
Payment will be made in arrears on a monthly basis. Invoices shall be submitted to:
All invoices should be submitted electronically through the Invoice Processing Platform (IPP) at http://www.ipp.gov/. The IPP Customer Support Desk is available to assist users Monday through Friday (excluding bank holidays) from 8 a.m. - 6 p.m. ET, including answering any questions related to accessing IPP or completing the registration process. Their toll-free number is 1-866-973-3131 or they can be reached at IPPCustomerSupport@fms.treas.gov. If you have any questions or concerns, please contact the Controller Operations Division Help Desk at 1-877-243-3072 or cod.help@usda.gov.
NOTE-Please email a copy of the invoice for reference to:
Michael Douglas, Contracting Officer
USDA-ARS-WBSC
1001 Holleman Drive East College Station, TX 77840 Email: Michael.douglas@ars.usda.gov Phone: (979) 260-9480
K. MATRIX OF SERVICES
Contractor shall be responsible for locking exterior doors and gates as marked on the attached building layout (daily). Contractor shall be responsible for arming the security systems and for overall security when their employees are on the job (daily).
Building 4 – Office/Laboratory (Approx. 26,000 sf) Daily:
Entry-Foyer, Halls, Restrooms, Conference Room, Offices, Lunchroom, Library
1. Sweep and dust mop floors – halls and lunchroom http://www.ipp.gov/ mailto:IPPCustomerSupport@fms.treas.gov mailto:cod.help@usda.gov mailto:Michael.douglas@ars.usda.gov
Page | 4
2. Clean disinfect fountains (3)
3. Empty ALL trash containers; install new plastic liners as required
4. Clean and disinfect restrooms -- wash basins, stools, urinals, mirrors, mop floors
5. Service restrooms -- paper towels, toilet paper, and soap
6. All trash will be in plastic bags, tied as to prevent trash from spilling in the process of dumping
7. Table tops in lunch room to be washed and wiped down daily.
Twice a Week:
1. Sweep/dust mop floors – laboratories
2. Wet mop floors – halls, lunchroom (more frequently as required to maintain appearance)
Weekly:
Conference Room, Library, Offices, Lunchroom
1. Clean all glass
2. Spray buff/polish main corridor hall ways
3. Vacuum walk-in mats -- all carpeted areas
4. Clean and sanitize table tops -- Conference Room, Library
5. Vacuum ALL carpeted floors
Monthly:
1. Dust corners, ceiling to floor-Library, Conference Room and Lunchroom
2. Machine scrub/wet mop laboratory floors (as required to maintain appearance)
3. Scrub floors and walls of restrooms
Quarterly:
1. Scrub and recoat composite floors – halls, lunchroom
2. Dust/damp wipe all door frames
Semi-Annually:
1. Scrub and recoat as required composite floors – laboratories (March and September)
Building 5 – Headhouse Daily:
Restrooms:
1. Sweep and spot wet mop floors
2. Clean and disinfect wash basin, stool, urinal, shower stall
3. Service paper towels, toilet paper, soap
4. Empty all trash containers
Labs:
Empty all trash containers in HL2, HL4, HL5, HL6, Quarantine, Agronomy
Building 12 – Multi-Purpose Daily:
1. Lower overhead doors and all entry doors should be locked
1. Clean and disinfect restrooms -- wash basins, stools, urinals, mirrors
2. Empty restroom trash containers; install plastic liners
3. Service restrooms -- paper towels, toilet paper and soap
Page | 5
Building 8 – Auto Shop (Approx. 1,000 sf)
1. Clean and disinfect restrooms -- wash basins, stools, urinals, mirrors
2. Empty restroom trash containers; install plastic liners
3. Service restrooms -- paper towels, toilet paper and soap
4. Sweep and spot wet mop lunchroom and office floors
5. Empty all trash containers
L. TECHNICAL REQUIREMENTS
Sweeping and Wet Mopping:
After sweeping and mopping operations, all floors shall be clean and free of dirt streaks; no dirt in corners, under furniture, and behind doors (under furniture means chairs, desks, or tables having airspace). After being mopped, the floor shall have a uniform appearance with no streaks, swirl, or detergent marks, or any evidence of soil, stains, film, or standing water. There shall not be any splash marks or mop streaks on furniture, walls, baseboards, or mop strands remaining in the area.
Cleaning Glass (Windows & Mirrors):
After glass has been cleaned, all traces of film, dust or dirt, smudges, or other foreign matter shall have been removed from frames and casings.
Trash Removal:
All waste trash containers and other trash containers shall be emptied and returned to their original location.
The trash shall be secured (tied) in plastic bags and deposited in the nearest outside trash dumpster to the building, DAILY.
Vacuuming:
After vacuuming, the carpeted floor shall be free of all visible litter and/or soil.
Drinking Fountains:
Disinfect all polished metal surfaces. After cleaning, the fountain shall be free of streaks, stains, spots, smudges, scale, or other obvious soils.
Cleaning Walk-In Mats:
Carpet-type entrance mats shall be vacuumed to remove soil and grit. Soil and moisture underneath the mats shall be removed and mats returned to their normal location.
Cleaning Toilet Bowls, Wash Basins, Urinals:
Cleaning, disinfecting, and descaling the entire surface, inside and outside, shall leave the fixture free from stains, streaks, scum, scale, or rust, DAILY.
Floor Maintenance:
ALL tile floor covered under this contract shall receive floor maintenance. This includes dry buffing, spray buffing, stripping, and waxing. Extremely stubborn spots -- gum, rust, burns -- shall be removed by hand.
Corners and other areas that floor machines cannot reach shall also be cleaned by hand. After maintenance, the floor shall have a uniform, glossy appearance, free of scuff marks, heel marks, and other stains or discolorations.
M. BIOBASED PRODUCTS REQUIREMENTS:
This procurement requires the use of biobased products to the extent that such products are
Page | 6 reasonably available, meet agency or relevant industry performance standards, and are reasonably priced. Where available, these products should first be acquired from among qualified products that fall under the umbrella of items designated through the USDA BioPreferred SM Program
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February, 2012 to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g. biobased greases;
biobased hydraulic fluids, biobased absorbents) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Location Site Manager (LSM).
The following is an example list of products that may be used in this contract for custodial services for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
All-purpose cleaner, Heavy duty cleaner, Carpet shampoo, Gum remover, Degreaser/cleaner, Deodorizer, Floor finish, Floor finish restorer, Disinfectant sanitizer, Extraction fluid, Floor stripper, Floor sealer, Furniture polish, Glass cleaner, Neutral cleaner (liquid), Stain remover, Air freshener including dispenser, Bathroom cleaner, Brass polish/cleaner, Chrome polish/cleaner, Liquid hand soap including dispenser, Lime and scale remover (tub and tile cleaner), Grout sealer, Stainless steel polish, Toilet bowl cleaner, White board cleaner, Wood floor cleaner, Laundry detergent, Cream cleaner, Solvent.
Biobased products that are designated for preferred procurement under USDA's' BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content.
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other biobased products.
The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of the contract. Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with tile provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products under Service and Construction Contracts.
http://www.biopreferred.gov/
Page | 7
Within thirty (30) days of contract award, the Contractor shall submit an Operations and Maintenance Plan. This submittal shall be approved by the LSM in writing. The Contractor shall not commence work until this submittal is approved by the LSM in writing.
The Plan must be reviewed and updated annually, and as required by the LSM. The Plan must contain and define the following elements:
• The Contractor's written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.
• Detail on how the Contractor intends to keep abreast of the development and increasing availability of biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.
• Proposed biobased custodial products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.
• NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
• The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.
The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract.
The data will be submitted to the LSM quarterly. A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product. Therefore we will look for a Contractor who will 1) demonstrate products, and 2) when selected, offer any necessary training to all of the construction staff and 3) be available with technical assistance to trouble shoot problems.
N. Deficiency Reports:
Deficiency reports showing areas not cleaned and the reason, damage to equipment, damage to building, broken dispensers, broken floor tile, stopped-up plumbing, etc., shall be furnished to the LSM within 24 hours of work time.
O. Inspections:
To assure compliance with specifications, terms and conditions, the LSM will make random inspections of parts of the buildings for which service are provided. The LSM will receive, check and verify complaints related to non-compliance, and re-inspect those areas to assure corrective action has taken place.
The results of the LSM's inspection shall be recorded on the form entitled "Janitorial Services Inspection Report" and submitted to the Contractor for corrective action. This document shall be used to determine whether the provision of the Deduction Clause will apply. This determination will be made by the CO.
P. Insurance:
The Contractor’s Workers’ Compensation Insurance shall cover all Contractor personnel. All contractor personnel work related injuries shall be handled by the Contractor’s Workers’ Compensation Insurance.
Additionally, the Contractor shall maintain insurance to cover any site damages caused as a direct or indirect
Page | 8 result of the janitorial services provided under the terms of this contract.
Q. Liability & Bonding:
Proof of bonding and liability insurance of a minimum of $10,000.00 will be required after award of contract and before commencement of work.
R. Deductions:
Clean and maintained buildings are the Governments goal. While the deduction provision for work omitted or improperly performed is designed to protect the Government’s interest, it is not a desirable substitute for accomplishing the job through normal processes. It is designed only to assure that the Government pays only for the services rendered.
A Deduction Table will be used by the Government in determining deductions for nonperformance of work or for deficiencies in the work performed.
Deductions will be made from the Contractor’s monthly invoice for instance of less than satisfactory performance or nonperformance of services required under the contract, after one warning. The Contractor is advised that the Government’s application of deductions in no way limit the Government’s right under the termination provision of this contract or any other provisions or rights to which the Government is entitled under law.
Payment for the first month will be made at the amount stated without deductions. If deductions are proposed to be made from payments, the CO will inform the Contractor in writing of the proposed deductions. The Contractor must present their reasons why the deductions are not warranted within ten (10) days therefore after. If the CO decides any or all of the proposed deductions are not warranted, the Contractor will be notified and paid accordingly.
| Attachments Options.pdf |
| Temple-Janitorial SOW FINAL (7-30-2015).pdf |
File details come from the government source that posted it. Updated .