SOW_Awnings,_LLS.docx

DOCX document 206 KB Posted

Attached to
Waterproofing and Grease Trap installation Federal contract opportunity
Solicitation number
AG-32SD-C-17-0069
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

SOW, Two awnings, WRRC, Albany, CA

View the file

Other files for this federal contract opportunity

Other files attached to Waterproofing and Grease Trap installation, newest first.
File Type Posted
SITE_VISIT_ATTENDEES.docx DOCX document
revised_proposal_pricing_sheet.docx DOCX document
Q&A.docx DOCX document
A00004.pdf PDF
SOW_Awnings,_LLS,_9-8-17.docx DOCX document
Amendment_0003,_Provide_and_install_two_awnings.pdf PDF
S-17-0069,_A00002.pdf PDF
S-17-0069,_Amendment_00001.pdf PDF
clz-prv,_8-17-2017,_Amendment_0001.docx DOCX document
SF1442,_S-17-0069.pdf PDF
S-17-0069,_DB,_8-4-17.docx DOCX document
clz-prv,_8-7-2017.docx DOCX document
South_Wing_WP_Bid_Set_Specifications_20170630.pdf PDF
South_Wing_WP_Bid_Set_11x17_20170630.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Provide and install two awnings over the laboratory gases, storage, and sheltered parking for the FSIS fork lift.

The awnings shall be installed as follows:

1. On the south side of the courtyard, positioned near the FSIS roll-up door.

It shall extend eastward for 46 feet providing 12 feet of coverage from the wall going north.

The design shall be the same as the existing courtyard awning, i.e. free-standing, supported from the existing wall. See the attached photos.

Each awning shall be pre-engineered/designed by the firm that is to fabricate and install it, in consideration of these existing conditions:

The existing stucco finish/substrate, at those points where the awning supports shall to be attached to the exterior wall, shall be removed such that the supports are secured directly to the bare concrete of the exterior wall. The interface between the exposed stucco substrate and the supports shall be caulked or otherwise waterproofed to prevent the infiltration of rainwater into the stucco substrate.

2. On the west side of the West Annex Building, positioned from the exit of the FSIS Breakroom.

It shall extend southward for 36 feet, to provide 18 feet of coverage from the wall toward the west.

The design shall be supported by poles as provided in the attached “WAB” photo.

Height: 10 – 12 feet, as appropriate.

Each awning shall be pre-engineered/designed by the firm that is to fabricate and install it, in consideration of these existing conditions:

The vertical supports shall be located so as not to obstruct the paths of egress at the FSIS Break Room exterior double doors and the west side elevator/steam line ramp.

The existing EIFS (Exterior Insulation Finish System), at the points where the awning supports are attached to the r wall, shall be removed so the supports can be secured directly to the bare concrete of the exterior wall. The interface between the exposed EIFS substrate and the supports shall be caulked or otherwise waterproofed to prevent the infiltration of rainwater into the EIFS substrate.

Awnings need not be load bearing as their purpose is to provide shade and precipitation protection.

Construction materials may be plastic, aluminum or as best determined by the offeror, and color choices, to complement the existing structures, shall be provided with your quote.

Photo of awning design for the courtyard: Photo of awning design for the WAB:

image1.jpeg image2.jpeg