Solicitation_AG-05M6-S-16-0051.pdf
PDF 1 MB Posted
- Attached to
- BAKER RIVER STORAGE BLDG #2301 RE-ROOFING Federal contract opportunity
- Solicitation number
- AG-05M6-S-16-0051
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_to_Submit_AG-05M6-S-16-0051.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 62
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
AG-05M6-S-16-0051 08/02/2016 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.
Everett, WA 98201
See Section F.2
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
JORGE A SOMOZA 425 783-6053 a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
22 August 2016 2:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f) Re-Roof Baker River Storage Building
#2301
Mt. Baker-Snoqualmie National Forest Mt. Baker Ranger District
Do Not Enter Prices Here
See Schedule of Items
Mail Quote to Contracting Officer Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue, Suite 3A Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at
(425) 783-0129
Technical Point of Contact is Thomas Warter at 425-783-6082
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
DUNS:_______________
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) mailto:jsomoza@fs.fed.us
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
RE-ROOF BAKER RIVER STORAGE BUILDING #2301
MT. BAKER RANGER DISTRICT
SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
UNIT
OF
ISSUE
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
01 Re-Roof Baker River Storage Building #2301
L.S.
02 1/2” CDX Roof Sheathing L.S. 1 $_______ $___________
TOTAL $___________
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 SCOPE OF CONTRACT
The purpose of this solicitation is to re-roof single story Warehouse Building #2301 at US Forest Service - Baker River Work Center Compound 22 miles east of Sedro Woolley, WA. Work includes removal of existing roof, remove and dispose existing plywood roof sheathing, supply and installation new flashing, new snap-log metal roofing. Roof area is estimated 3,200 Sq. Ft.
(Contractor needs to measure the building to verify the roofing area). Roof pitch is 5:12, See enclosed photograph
C.2 PROJECT LOCATION
This project is located at The Baker River Work Center on the Mt. Baker Ranger District of the Mt.
Baker- Snoqualmie National Forest, Skagit County, Washington. Project may be reached from Sedro- Woolley, Washington by traveling east on Highway 20 follow the road for 22 miles then turn right onto Baker River Work Center.
C.3 PRICE RANGE
The Government's estimate is: between $25,000 and $100,000.
C.4 SUBMITTAL
Contractor should submit the roofing sample to Contracting Officer for approval prior to installation of the roof.
C.5 WARRANTY
Warranty workmanship and materials against leakage for 5 years. Materials shall be guaranteed for 30 years minimum.
C.6 CONSTRUCTION INFORMATION
Reasonable quantities of water and electricity relating to contract operations are available for contractor use at no charge during contract.
Work may proceed only week day Monday thru Friday daily between 8:00 AM and 6:00 PM.
Arrangements to view the buildings may be made by telephoning Jessica McAloon at 360-854- 2602 Monday–Friday or for specific information on the work call Thomas Warter at 425-783- 6082.
Portable tape players and radios playing audibly are prohibited.
Existing Condition
The building was constructed in 1964. The existing single three-tap composite asphalt are applied over plywood sheathing and is in poor condition. Roof pitch is 5:12. The roof eave is about 10 feet above the ground.
Work Included
Provide all labor, materials tools, equipment and services to furnish and install metal roofing, including flashing, venting and such other accessories to make the system complete and weathertight, as indicated in the specification.
Install one H-clip between rafters.
Safety Precautions
Contractor shall comply with WAC 296-155 Safety Standards for Construction Work. Safety belts and lifelines shall comply with WAC 296-155-225. Ladders and scaffolds shall comply with WAC 296-155.
Contractor personnel shall use protective devices to prevent slipping and falling from the roof.
Devices may include shingling foot locks, lifelines, crawling boards, hooked ladders or any other WISHA approved devices to furnish protection.
Safety belts and lifelines will be required for all personnel, including Government inspectors, on the roof.
Roofing supplies will be delivered to the roof by progressive scaffolding, stairs or hoisting device.
Demolition and roofing operations on projecting eaves and gabled ends will be conducted from scaffolding or mobile lift platforms.
Any alternate means of meeting safety requirements proposed by the Contractor will be reviewed and approved in advance by the CO.
Roof Tearoff
Remove all existing layers of shingles, roofing paper and roof sheathing. Remove all nails and/or staples.
Provide a plastic or cloth drop sheets to catch nails and roofing debris or sweep pavement daily to remove debris. Clean the area around the building of all demolition debris, including nails.
Provide dumpster containers or truck beds to accumulate debris. Remove roofing debris from the site daily during demolition. Dispose of material properly off the site.
Weather Protection
Provide weather protection for exposed areas during roof removal by covering when rain threatens and nightly with tarps when exposed.
Roof Installation
Flashings and Boots: Use ASTM A361 26 gauge thick steel with minimum 1.25 oz/SF Galvanized coated factory prefinished color valley flashings.
Provide 30" wide strips of No. 30 roofing felt in all cross gable Valleys under flashing. Provide new 26" wide “W” type flashing crimped to guide water centered in the valleys. Weather lap joints. Secure in place with concealed fasteners.
Provide 6” eave edge metal flashings tight with sheathing edge. Weather lap joints 2" and seal with silicone adhesive caulk.
Provide one layer of 12" wide flashing to form a drip edge over all gabled end fascia boards.
Weather lap joints. Secure in place with concealed fasteners.
Install ice shield strip shall extend from the edge of the eave 4 feet up the roof. The ice shield strip shall extend from edge of the gabled end overhang at least 2 feet into the roof.
Install No. 30 roof felt papers for entire roof building.
Install membrane in accordance with manufacturer’s recommendations. Any wrinkles in the membrane will be cut out and patched.
Metal Roofing:
Snap lock roofing. (SEE SPEC.)
Fasteners: Fasteners shall be nails or staples approved for roofing use by manufacturer’s recommendation. Fasteners shall not exposure through roofing.
Sheathing under soffits on the eaves or gabled ends. Drive fasteners per manufacturer’s recommendation.
Nails shall be of sufficient length to penetrate 1/2" through sheathing. Fasteners shall be stainless steel or hot dipped galvanized coated.
Ridge Vent System
Provide and install a ridge vent similar to Cor-A-Vent (V-600T). Prior to installation, submit a catalog cut if using similar product.
Provide and install the Cor-A-Vent (V-600T) along the main ridge. At the ridge, cut the roof decking to accommodate the vent and install in accordance with the vent manufacturer's instructions. Extend the ridge vent over solid sheathing to the edge of the gabled end to present a uniform appearance.
Cleanup
Remove all excess materials and debris from the site.
Keep work area as clean as possible during entire application of roof system.
At the end of work each day, secure all products as to prevent any movement because of weather conditions during the projects unmanned hours.
Tough-up all scraped or scratched areas with manufacturers supplied paint. Tape off all surrounding areas. Only apply pain to scraped or scratched area.
C.7 APPLICABLE SPECIFICATIONS
The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.
C.8 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
C.9 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS
(FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C.10 BIOBASED PRODUCTS
The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases
Dust suppressant 2-cycle engine oil Absorbents
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
Storage Building #2301
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-12 Inspection of Construction (AUG 1996) http://www.arnet.gov/far/
SECTION F--DELIVERIES OR PERFORMANCE
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.242-14 Suspension of Work (APR 1984)
F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days. The time stated for completion shall include final cleanup of the premises.
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at a location determined after contract award.
G.2 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H.1 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,
EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/?q=browsefar http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(OCT 2015)
52.204-13 System for Award Management Maintenance (JULY 2013) 52.204-18 Commercial and Government Entity Code Maintenance (JULY 2015) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-6 Construction Wage Rates Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rates Requirements and Related
Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(MAY 2014)
52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) http://www.dm.usda.gov/procurement/policy/agar.html
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
(AUG 2011)
52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $35,000) 52.228-5 Insurance—Work on a Government Installation (JAN 1997) 52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $35,000) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) (Applicable if contract exceeds $35,000) 52.228-14 Irrevocable Letter of Credit (NOV 2014)(Applicable if contract exceeds $35,000) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management
(JULY 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)
Alternate I (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (FEB 2016) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)
(APR 1984)Alternate 1 (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) (Applicable if contract is over $35,000)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I.2 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, https://acquisition.gov/far/current/html/Subpart%202_1.html%23wp1145508 http://uscode.house.gov/ plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/far/current/html/Subpart%2012_5.html%23wp1077123
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.
However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______
Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I.3 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) (Applicable to Contracts >$35,000 but < $150,000)
(a) The Contractor shall submit one of the following payment protections
A Payment Bond An Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
I.4 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to: USDA Forest Service.
I.5 ORDER OF PRECEDENCE—CONSTRUCTION
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following orde
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
I.6 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
http://www.biopreferred.gov/ http://www.sam.gov/
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Specification List 0
2. Supplemental Specifications 5
3. Project Drawings 3
Page No Description 1 of 3 Title Sheet 1 2 of 3 Vicinity Map 1 3 of 3 Project Location 1
4. DOL Wage Decision No. WA160039 8
5. Fire Protection and Suppression (R6-FS-6300-52) 6
6. Past and Current Contract Information 1
SECTION 06 16 00 - SHEATHING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Roof sheathing.
1.3 DELIVERY, STORAGE, AND HANDLING
A. Stack panels flat with spacers beneath and between each bundle to provide air circulation.
Protect sheathing from weather by covering with waterproof sheeting, securely anchored.
Provide for air circulation around stacks and under coverings.
PART 2 - PRODUCTS
2.1 ROOF SHEATHING
A. Plywood Roof Sheathing: Exterior, Structural I, Exposure 1, sheathing.
1. Span Rating: 24/0.
2. Nominal Thickness: 1/2 inch.
3. H-Clip: one clip between rafters.
4. Material: CDX
2.2 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified in this article for material and manufacture.
1. For roof sheathing, provide fasteners with hot-dip zinc coating complying with ASTM A 153/A 153M or Type 304 stainless steel.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: NES NER-272.
SHEATHING 06 16 00 - 1
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Do not use materials with defects that impair quality of sheathing or pieces that are too small to use with minimum number of joints or optimum joint arrangement. Arrange joints so that pieces do not span between fewer than three support members.
B. Cut panels at penetrations, edges, and other obstructions of work; fit tightly against abutting construction unless otherwise indicated.
C. Securely attach to substrate by fastening as indicated, complying with the following:
1. NES NER-272 for power-driven fasteners.
2. Table 2304.9.1, "Fastening Schedule," in ICC's "International Building Code."
3. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2), "Alternate Attachments," in ICC's "International Residential Code for One- and Two- Family Dwellings."
D. Use common wire nails unless otherwise indicated. Select fasteners of size that will not fully penetrate members where opposite side will be exposed to view or will receive finish materials.
Make tight connections. Install fasteners without splitting wood.
E. Coordinate roof sheathing installation with flashing and joint-sealant installation so these materials are installed in sequence and manner that prevent exterior moisture from passing through completed assembly.
F. Do not bridge building expansion joints; cut and space edges of panels to match spacing of structural support elements.
G. Coordinate sheathing installation with installation of materials installed over sheathing so sheathing is not exposed to precipitation or left exposed at end of the workday when rain is forecast.
H. Space panels 1/8 inch apart at edges and ends.
PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for in a Lump Sum basis.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section.
Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
02 ½ CDX Roof Sheathing Lump Sum
END OF SECTION 06 16 00
SHEATHING 06 16 00 - 2
USDA FOREST SERVICE PROJECT SPECIFICATIONS
SECTION 07 14 13
“SNAP LOCK” STANDING SEAM PREMIUM
1. PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies metal roofing and accessories.
1.02 WARRANTIES
A. Manufacturer’s standard warranty for 30 years, following delivery date, that under normal usage, panels will not rupture, fail structurally or perforate due to corrosion.
B. Contractor’s workmanship warranty that the panel is installed per manufacturer’s specifications; and, will be free from defective workmanship;
and, will remain watertight for a period of 5 years following substantial completion of this project.
1.03 SUBMITTALS
A. Submit catalog cuts or brochures, and fully describing all materials.
B. Manufacturer’s standard color chart.
1.04 QUALITY ASSURANCE
A. Before Fabrication: The contractor shall take field measurements of the structure and substrates indicated and specified to ensure that panel lengths and brake formed flashings are dimensioned accurately to facilitate easy installation. Fabrication shall not begin until all field conditions have been verified. Allow for sufficient trimming of panel unit at eaves, valley, and gables prior to fabrication.
2. PART 2 - PRODUCTS
2.01 MATERIALS
A. Profile Configuration: 1 inch vertical standing seam “SNAP-LOCK”;
measurement to seam height to be made using the under lap side of panel.
Vertical ribs to be 12:o.c.
B. Panel Lengths: Where physically possible and/or practical, panel are to be full length, ridge to eaves.
C. Roofing panels: 0.018 inch aluminum, embossed finish, or 26 gauge steel, baked enamel, embossed finish.
Ridge cap: 0.018 inch aluminum or 26 gauge steel, 2 piece interlocking type, formed to match roofing.
Valley flashing, gable and eave trim: 0.018 inch aluminum or 26 gauge steel.
Valley flashing 36 inches wide minimum.
Felt: ASTM D226 Type I, 30 pounds/square
Project Name: Re-Roof Baker River Storage Building #2301 SNAP LOCK
D. Panel Fasteners: When applied directly to sheathing, 1 inch hi-tensile, double threaded, sealed drywall screws will be used for the roofing panel attachment through the screwing clima-flange. Other applications-follow manufacturer’s recommendations.
E. Flashing Fasteners: Self-drilling screws for sufficient length to properly secure flashings. Use types and number to match manufacturer’s recommendations.
F. Roof Flashings:
1) Shall be flashed using manufacturer’s recommended materials.
2) Metal flashings will be of same finish, thickness and matching color, unless otherwise noted.
G. Sealant – Caulking gun dispense “FLEXO SEAL” by AC Products, La Jolla, CA. NO PERFORMED CLOSURES OR TAPES to be used on this project.
2.02 FLASHING AND TRIM
A. All exposed standard or special flashing/trim and such other brakeformed in the same gauge, color, and finish to match roofing panels, furnished with protective strippable film to be removed upon installation.
B. Accessories such as clips, closures, fasteners, etc., shall be as recommended by the Manufacturer.
3. PART 3 – EXECUTION
3.01 INSPECTION
A) Contractor is to inspect project sight to confirm that no problems are visible. That the surface is in such a condition as to allow an installation of the quality that is acceptable to the manufacturer and the Engineer. Any problems shall be brought to Contracting Officer Representative, prior to installation of the roofing panels.
3.02 INSTALLATION
A. Apply metal roofing over 30 pound felt. Apply felt in horizontal courses starting at the eaves. Lap edges a minimum of 3 inches. Scatter nail or staple felt.
B. Apply sheets with ribs extending up the slope of the roof. Install gable and eave trim under roofing sheets.
C. Start at the lower corner of the roof, away from the prevailing winter wind.
Extend sheets 2 inches beyond eave trim. Lap edges of sheets one rib. Lap ends of sheets 9 inches minimum.
D. Apply a 1/4 inch bead of caulking at all end laps and at ridge cap laps.
E. Nail eaves, end laps and ridge at each rib. Nail side laps, 6 inches on center.
Nail through one intermediate rib, 12 inches on center.
F. Caulk and fasten in such a manner as to maintain a complete weather tight system. Once project is complete, no sealant should be visible.
G. Do not use any tool to cut panel that will burn metal or uses heat to cut- i.e.
circular saw or torch.
3.03 FASTENING
A) Wood Decks
1) Roofing decking shall be a minimum of 1/2” plywood or furring.
2) Fasteners shall be a minimum 1” coated bugle head screw, placed every 16”o.c.
3) On exposed soffits, fasteners shall be 9/16” coated bugle head screw, placed every 9” or 10” o.c.
B) Wood Purlins
1) 2’ Center spacing; (2)-1” bugle head screws placed every purlin.
4. PART 4 - MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for on a Lump Sum basis.
4.2 BASIS OF PAYMENT
A. Payment: Prices and payment will be full compensation for the work described in this section. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01 Re-Roof Baker River Storage Building #2301 Lump Sum
END OF SECTION 07 14 13
Bellingham
Everett
Seattle
Tacoma
Arlington
Darrington
VICINITY MAP
Mt. Baker
Ranger Station
Supervisor's
Office
Enumclaw
Mt. Baker District
Darrington District
Skykomish District
Snoqualmie District
Baker River
Work Center
MT. RAINIER
NATIONAL PARK
Mt. Baker-Snoqualmie
National Forest
North Bend
Sedro Woolley
Sheet of
General Decision Number: WA160039 07/29/2016 WA39
Superseded General Decision Number: WA20150039
State: Washington
Construction Type: Building
County: Skagit County in Washington.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 03/25/2016 2 05/13/2016 3 06/24/2016 4 07/08/2016 5 07/15/2016 6 07/29/2016
ASBE0007-002 06/01/2016
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 48.46 14.97
BRWA0001-010 06/01/2015
Rates Fringes
BRICKLAYER.......................$ 37.54 14.77
CARP0770-019 06/01/2015
Rates Fringes
CARPENTER (Acoustical Ceiling Installation)....................$ 40.36 13.66 CARPENTER (Including Formwork, Drywall Hanging and Metal Stud Installation).........$ 40.36 13.66
PILEDRIVERMAN....................$ 40.61 13.66
8/2/2016http://www.wdol.gov/wdol/scafiles/davisbacon/WA39.dvb?v=6
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - ALL
CLASSIFICATIONS EXCEPT MILLWRIGHTS AND PILEDRIVERS
Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:
Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles Centralia Mount Vernon Sunnyside Chelan Pt. Townsend
Zone Pay:
0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour
(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON - MILLWRIGHT
AND PILEDRIVER ONLY)
Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center
Zone Pay:
0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour
ELEC0191-013 06/01/2015
Rates Fringes
ELECTRICIAN
DOUGLAS, CHELAN, and OKANOGAN Counties...........$ 38.15 18.16
ISLAND, SAN JUAN, SKAGIT,
SNOHOMISH and WHATCOM Counties....................$ 41.15 18.25
ENGI0302-018 06/01/2013
Rates Fringes
Power equipment operators:
Group 1A...................$ 37.39 16.65 Group 1AA..................$ 37.96 16.65 Group 1AAA.................$ 38.52 16.65 Group 1.....................$ 36.84 16.65 Group 2.....................$ 36.35 16.65 Group 3.....................$ 35.93 16.65 Group 4.....................$ 33.57 16.65
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)
GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Excavator/Trackhoe, Backhoes: Over 90 metric tons
GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments); Loaders-overhead, 8 yards and over; excavator/Trackhoe, backhoes: over 50 metric tons to 90 metric tons
GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments); Excavator/Trackhoe, backhoes: over 30 metric tons to 50 metric tons; Loader-overhead 6 yards to, but not including 8 yards; Dozer D-10;
Screedman; Scrapers: 45 yards and over; Grader/Blade
GROUP 2 - Cranes, 20 tons thru 44 tons with attachments;
Drilling machine; Excavator/Trackhoe, backhoe: 15 to 30 metric tons; Horizontal/directional drill operator;
Loaders-overhead under 6 yards; Crane Oiler-100 Tons and Over; Compactor; Scraper: under 45 tons
GROUP 3 - Cranes-thru 19 tons with attachments; Dozers-D-9 and under; Motor patrol grader-nonfinishing; Roller-Plant Mix; Crane Oiler under 100 tons; Excavator/Trackhoe, backhoe: under 15 metric tons; Forklift: 3000 lbs and over with attachments; Service Oiler
GROUP 4 - Roller-other than plant mix; Forklift: under 3000 lbs with attachments
IRON0086-010 07/01/2016
Rates Fringes
IRONWORKER (Reinforcing, Structural and Ornamental).......$ 40.52 24.71
LABO0001-015 06/01/2014
ZONE 1:
Rates Fringes
Laborers:
GROUP 2.....................$ 25.79 10.30
GROUP 3.....................$ 32.29 10.30
GROUP 4.....................$ 33.08 10.30
GROUP 5.....................$ 33.62 10.30
ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):
ZONE 2 - $1.00
ZONE 3 - $1.30
BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT,
TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT.
TOWNSEND, PT. ANGELES, AND BREMERTON
ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall
LABORERS CLASSIFICATIONS
GROUP 2: Flagman
GROUP 3: General Laborer; Mason Tender-Cement/Concrete;
Chipping Gun (under 30 lbs.); Form Stripping
GROUP 4: Chipping Gun (over 30 lbs.); Concrete Saw Operator;
Grade Checker; Gunite; Pipe Layer; Vibrating Plate
GROUP 5: Mason Tender-Brick
* PAIN0005-028 07/01/2016
Rates Fringes
PAINTER (Excluding Spray)........$ 28.99 11.34
PAIN0005-029 07/01/2015
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 37.65 16.12
PAIN0188-004 07/01/2015
CLALLAM, JEFFERSON, KING, KITSAP, LEWIS, MASON, PIERCE,
SNOHOMISH, THURSTON COUNTIES
Rates Fringes
GLAZIER..........................$ 40.00 16.00
PLUM0026-012 12/01/2015
Rates Fringes
Plumbers and Pipefitters.........$ 44.82 20.40
ROOF0054-007 06/01/2014
Rates Fringes
ROOFER (Includes Roof Tear Off, Waterproofing, and Installation of Metal Roofs).....$ 32.07 12.62
SHEE0066-022 06/01/2012
Rates Fringes
Sheet metal worker (Including HVAC Pipe and System Installation)....................$ 44.44 22.49
* TEAM0174-004 01/01/2016
Rates Fringes
Truck drivers:
ZONE A:
GROUP 1:...................$ 33.38 17.87
GROUP 2:...................$ 32.54 17.87
ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.
ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BELLINGHAM CENTRALIA RAYMOND OLYMPIA
EVERETT SHELTON ANACORTES BELLEVUE
SEATTLE PORT ANGELES MT. VERNON KENT
TACOMA PORT TOWNSEND ABERDEEN BREMERTON
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1 - Dump Trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with 16 yards to 30 yards capacity: Over 30 yards $.15 per hour additional for each 10 yard increment.
GROUP 2 - Dump trucks, side, end and bottom dump, including semi-trucks and trains or combinations thereof with less than 16 yards capacity.
HAZMAT PROJECTS
Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.
LEVEL B: +$.50 per hour - Uses same respirator protection as Level A.