File Type Posted
Amendment__2.pdf PDF
Amendment__1.pdf PDF
Copy_to_Submit_Solicitation_AG-05M6-S-16-0028_Electrical_Upgrades.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 130

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-05M6-S-16-0028 05/06/2016 UNDER BDSA REG. 2

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date) Mt. Baker-Snoqualmie National Forest 2930 Wetmore Avenue Suite 3A.

Everett, WA 98201

See Section F.2

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

JORGE A SOMOZA 425 783-6053 a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.

This request does not commit the Government to pay any costs incurred in the preparation of the

30 June 2016 2:00 PM submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT

PRICE

AMOUNT

(a) (b) (c) (d) (e) (f) Mt. Baker-Snoqualmie National Forest

Electrical Upgrades

All Ranger Districts

Do Not Enter Prices Here

See Schedule of Items

Mail Quote to Contracting Officer

2930 Wetmore Avenue, Suite 3A

Everett, WA 98201 or e-mail to jsomoza@fs.fed.us or fax at

(425) 783-0129

Technical Point of Contact is Thomas Warter at 425-783-6082

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

DUNS:_______________

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a) mailto:jsomoza@fs.fed.us

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

GLACIER COMPOUND BUILDINGS ELECTRICAL REPAIRS,

MT. BAKER RANGER DISTRICT

WHATCOM COUNTY, WA

SCHEDULE OF ITEMS

BASE ITEMS:

ESTIMATED PAY

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

1096 Residence Building 1 L.S. $_______ $______

1097 Residence Building 1 L.S. $_______ $______

1098 Residence Building 1 L.S. $_______ $______

1099 Residence Building 1 L.S. $_______ $______

1332 Residence Building 1 L.S. $_______ $______

2021 Glacier Public Service Center 1 L.S. $_______ $______

2130 Recreation Storage Buildings 1 L.S. $_______ $______

2131 Carpentry Shop Building 1 L.S. $_______ $______

2230 Bunkhouse/Office Building 1 L.S. $_______ $______

2330 Storage/Kitchen Building 1 L.S. $_______ $______

2530 Gas/Storage Building 1 L.S. $_________ $______

5720 Heather Meadows PSC 1 L.S. $_________ $______

SUBTOTAL: $__________

VERLOT COMPOUND BUILDINGS ELECTRICAL REPAIRS,

DARRINGTON RANGER DISTRICT

SNOHOMISH COUNTY, WA

SCHEDULE OF ITEMS

BASE ITEMS:

ESTIMATED PAY

ITEM NO. DESCRIPTION

QUANTITY UNIT UNIT PRICE TOTAL

1136 Residence Building 1 L.S. $______ $______

1137 Residence Building 1 L.S. $_______ $______

1138 Residence Building 1 L.S. $_______ $______

1141 Residence Building 1 L.S. $_______ $______

1346 Bunkhouse 1 L.S. $_______ $______

1545 Garage 1 L.S. $_______ $______

1546 Garage 1 L.S. $_______ $______

1746 Pump house Building 1 L.S. $_______ $______

2031 Verlot Public Service Center 1 L.S. $_______ $______

2345 Storage Buildings 1 L.S. $_______ $______

2545 Gas Storage Building 1 L.S. $_______ $______

5723 Verlot Public Restroom 1 L.S. $_________ $______

BAKER RIVER WORK CENTER ELECTRICAL REPAIRS,

MT. BAKER RANGER DISTRICT

SKAGIT COUNTY, WA

SCHEDULE OF ITEMS

OPTION ITEMS:

ESTIMATED PAY

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

1000 Residence Building 1 L.S. $_______ $______

1002 Residence Building 1 L.S. $_______ $______

1004 Residence Building 1 L.S. $_______ $______

1005 Residence Building 1 L.S. $_______ $______

2003 Fire Office Building 1 L.S. $_______ $______

2201 Storage Building 1 L.S. $_______ $______

2204 Chapel Church Building 1 L.S. $_______ $______

2301 Warehouse 1 L.S. $_______ $______

2501 Fuel Storage Building 1 L.S. $_______ $______

2600 Fire Engine Storage Building 1 L.S. $_______ $______

SILVER SPRINGS COMPOUND BUILDINGS ELECTRICAL REPAIRS,

SNOQUALMIE RANGER DISTRICT

KING COUNTY, WA

SCHEDULE OF ITEMS

OPTION ITEMS:

ESTIMATED PAY

ITEM NO. DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL

1060 Residence Building 1 L.S. $_______ $______

1362 Public Service Center 1 L.S. $_______ $______

1560 Detach Garage 1 L.S. $_______ $______

1747 Pump House 1 L.S. $_______ $______

2260 Fire Storage Building 1 L.S. $_______ $______

2360 Recreation Storage Building 1 L.S. $_______ $______

1248 Boundary Creek Trailer A 1 L.S. $_______ $______

1249 Boundary Creek Trailer B 1 L.S. $_______ $______

2264 McCullough Seed Orchard 1 L.S. $_______ $______ Warehouse

2060 McCullough Seed Orchard Office 1 L.S. $_______ $______

SUBTOTAL: $_______

TOTAL $

NOTE : ONLY OFFERS TO THE NEAREST CENT WILL BE ACCEPTED.

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF CONTRACT

The purpose of this contract is to repairs electrical deficiencies and code upgrades of buildings in Verlot Public Service Center, Glacier Public Service Center, Heather Meadows Visitor Center, Baker River Work Center, Silver Springs Compounds, McCullough Seed Orchard and Boundary Creek Work Center. Work includes installation of lights, outlets, switch and wiring, repair reverse polarity outlets and all electrical works as indicated in the specs. (SEE

ATTACHED ELECTRICAL INSPECTION DEFICIENCIES).

For technical information contact Thomas Warter at (425) 783-6082, cell phone (425) 201-5751.

Contractor shall give Contracting Officer ten days’ notice prior to beginning work at the project site.

C.2 PRE-BID CONFERENCE

While the solicitation being issued on Federal Business Opportunities (FBO) website the Forest Service will hold a pre-bid meeting on the following dates, time and locations:

Pre-Bid Meeting on Wednesday, June 15, 2016 at 9:30 AM Glacier Public Service Center Compound 1094 Mt. Baker Hwy.

Glacier, WA 98244

Pre-Bid Meeting on Thursday, June 16, 2016 at 9:30 AM Baker River Work Center 41382 State Route 20 Concrete, WA 98237

Pre-Bid Meeting on Friday, June 17, 2016 at 9:30 AM Verlot Public Service Center Compound

33515 Mountain loop Highway Granite Falls, WA 98252

Pre-Bid Meeting on Friday, June 21, 2016 at 9:30 AM Silver Springs Compound

69211 SR 410 E

Enumclaw, WA 98022

PRE-BID MEETING RSVP:

If you will be attending the pre-bid meeting please RSVP with Thomas Warter at Telephone

(425) 783-6082. Email: twarter@fs.fed.us, also indicate the location you are planning to attend;

Please RSVP no later than Wednesday, June 13, 2016.

mailto:twarter@fs.fed.us

C.3 PROJECT LOCATION

Mt. Baker Ranger District:

Glacier Public Service Center Compound 1094 Mt. Baker Hwy.

Glacier, WA 98244

Heather Meadows Visitor Center The building is approximately 55.5 miles east of Bellingham, Wa.

On SR 542 near the Mt. Baker Ski Area.

Baker River Work Center 41382 State Route 20 Concrete, WA 98237

Darrington Ranger District:

Verlot Public Service Center Compound 33515 Mountain loop Highway Granite Falls, WA 98252

Snoqualmie Ranger District:

Silver Springs Compound

69211 SR 410 E

Enumclaw, WA 98022

McCullough Seed Orchard Compound 16 miles west of Silver Springs Compound and 20 miles east of City of Enumclaw, WA. 98022

Boundary Creek Work Center 3 miles west of McCullough Seed Orchard Compound and 17 miles east of City of Enumclaw, WA. 98022

C.4 PRICE RANGE

The Government's estimate is: between $25,000 and $100,000.

C.5 APPLICABLE SPECIFICATIONS (CSI PROJECTS)

The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached.

C.6 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.7 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.8 CONTRACT PRODUCTS AND MATERIALS

The Buy American Act applies to this contract with no exceptions. See I.4 FAR 52.225-9 Buy American Act-Construction Materials.

Brand names shown in this contract are not required brands but supplied products and materials are to be similar in material, quality, and appearance of those brands shown.

C.9 SUBMITTALS

Contractor must get Contracting Officer approval prior to installation of any improvements.

The Contractor shall provide submittals on proposed products and must obtain Contracting Officer’s approval, prior to use and installation.

All of the electrical work by Contractors in this contract shall be inspected by an independent State-certified electrical inspector prior to placing the facility into service. The contractor may complete this inspection through the State Labor and Industries or by obtaining an electrical permit from the appropriate local agency. A minimum notice of 5 business days shall be given to the Contracting Officer or their designated representative prior to the date of the inspection. Documentation of the inspection shall be provided to the Contracting Officer.

Contractor shall submit the check lists of all items that’s being done for each building.

C.10 BIOBASED PRODUCTS

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR).

The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases

Dust suppressant 2-cycle engine oil Absorbents

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996) http://www.arnet.gov/far/

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) Alternate I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 240 calendar days. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by July 1st 2016. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 15 days after the date of contract award. The conference will be held at the Supervisor’s Office located in Everett, WA.

G.2 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.

G.3 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS (APR 1984)

(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work sites, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workman, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by Contracting Officer.

(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site and (2) on adjacent property of a third party, the location of which are made know to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(OCT 2015)

52.204-13 System for Award Management Maintenance (JULY 2013) 52.204-18 Commercial and Government Entity Code Maintenance (JULY 2015)

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JULY 2013) 52.222-3 Convict Labor (JUNE 2003) 52.222-6 Construction Wage Rates Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JULY 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014)

52.222-13 Compliance with Construction Wage Rates Requirements and Related Regulations (MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014)

52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000

(MAY 2014)

52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2015) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (JULY 2014)

52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015)

52.223-3 Hazardous Material Identification and Material Safety Data (JAN 1997) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) http://www.usda.gov/procurement/policy/agar.html

52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011)

52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUNE 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014)

52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014)

52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (MAY 2014)

52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(JULY 2013)

52.232-39 Unenforceability of Unauthorized Obligations (JUNE 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984)

52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984)

Alternate I (APR 1984) 52.236-17 Layout of Work (APR 1984)

52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984)

52.244-6 Subcontracts for Commercial Items (FEB 2016) 52.245-1 Government Property (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV

1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 FAR 52.217-7 OPTION FOR INCREASED QUANTITY—SEPARATELY PRICED LINE

ITEM (MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance of the contract. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

I.3 FAR 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are https://acquisition.gov/far/current/html/Subpart%202_1.html%23wp1145508 http://uscode.house.gov/ produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or http://uscode.house.gov/ http://uscode.house.gov/ https://acquisition.gov/far/current/html/Subpart%2012_5.html%23wp1077123

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material.

However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON

Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:

Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______

Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I.4 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000) (Applicable to Contracts >$35,000 but < $150,000)

(a) The Contractor shall submit one of the following payment protections

A Payment Bond An Irrevocable Letter of Credit

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I.5 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)

If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to: USDA Forest Service.

I.6 ORDER OF PRECEDENCE—CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following orde

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

I.7 FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER

SERVICE AND CONSTRUCTION CONTRACTS (SEPT 2013)

(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—

(1) The product cannot be acquired—

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

(iii) At a reasonable price.

(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:

(i) Spacecraft system and launch support equipment.

(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.

(b) Information about this requirement and these products is available at http://www.biopreferred.gov.

(c) In the performance of this contract, the Contractor shall—

(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and

(2) Submit this report no later than—

(i) October 31 of each year during contract performance; and

(ii) At the end of contract performance.

http://www.biopreferred.gov/ http://www.sam.gov/

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

Title Pages

1. Specification List 1

2. Supplemental Specifications 47

3. Project Drawings 6 Page No Description 1 of 6 Title Sheet 1 2 of 6 Vicinity Map 1 3 of 6 Glacier Public Service Center 1 4 of 6 Baker River Work Center 1 5 of 6 Verlot Public Service Center Compound 1 6 of 6 Silver Spring Compound 1

4. DOL Wage Decision No. WA160044 Whatcom County 6

5. DOL Wage Decision No. WA160039 Skagit County 7

6. DOL Wage Decision No. WA160041 Snohomish County 8

7. DOL Wage Decision No. WA160036 King County 8

8. Fire Protection and Suppression (R6-FS-6300-52) 6

9. Past and Current Contract Information 1

MT. BAKER-SNOQUALMIE NATIONAL FOREST

SPECIAL PROJECT SPECIFICATIONS

Recommended Repairs 2011.

26 00 10 General Technical Provisions

26 00 50 Basic Methods and Materials

26 51 00 Lighting

The following electrical inspections were done in 2011 and recommended by inspector to be corrected.

Contractor shall repair the following electrical deficiencies per inspector recommendation:

Mt. Baker Ranger District: Glacier Public Service Compound

Buildings Location: BASE ITEMS

Glacier Public Service Center Compound 1094 Mt. Baker Highway Glacier, WA 98244

Building 1096 - Residence

• Install proper Ground Rod Clamp and drive Rod below grade.

• Install new Guy Wire Kit on Main Mast.

• GFI protect 2 – Outlets in Garage.

• Install Wires in Flex at cabinet above hood for physical protection.

• Install three Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Install four hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1098 - Residence

• Install proper Ground Rod Clamp and drive below grade.

• GFI (5) Outlets in garage. Requires 2 – GFI Outlets and routing Wire through the studs properly.

• Add GFI Circuit and Outlet to ½ Bath and disable 2-Prong Outlet built into the Light Fixture.

• Install Flex on Hood Wire for physical protection.

• Replace defective GFI Outlet in Kitchen.

• Install three Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Install four hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1099 - Residence

• Outside back Spot Light has an indoor Box. Replace with Weather Proof 4”0 Box.

• Install three Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Remove and cap five Outdoor Flood Lights.

• Install three hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1332 Guard Station

• Concrete Anchor and secure 20’ of Galvanized Rigid Conduit in the front of the building.

• GFI protect (2) Kitchen Outlets.

• GFI protect Bathroom Outlet.

• Continue Rigid Galvanized Conduit to and from Generator Transfer Switch in Crawl.

• J-Box and Blank-Off stubbed Wire in Crawl below Panel for safety.

• Install two Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

Building 2021 - Glacier PSC

• Find or drive new Ground Rod Wire – has been pulled out.

• (2) 2-Prong Outlets; change to 3-Prong and extend Ground Wire.

• Back Entry Outlet is not working; troubleshoot and repair

• Main Room – 2 Outlets not working shall be repair and replace.

• Main Room – 4 Outlets are weak or have no Grounding shall be repair and replace.

• Main Room – 1 Outlet – Reverse Polarity shall be repair and replace.

• Main Room - 9 – 2-Tube T-12; change to new 4’ length, ILLUMINA BS100LED, 50W.

• Office – 2 weak Grounds in Outlets.

• Exposed Romex on floor behind cash register needs to be physically protected.

• Cash Register Outlet has Reverse Polarity.

• Add 3-Way Switch System to Basement Stairs.

• Basement – (9) 4’ 3-Tube T-12; change to new 4’ length, ILLUMINA BS100LED, 50W.

• Basement Back Room – Ceiling Outlet has no Ground.

• Basement Fixtures are grounded by a Single Wire soldered to Water Pipe. Need to run all new

Grounded Wire (Panel is accessible).

• Install Flex at Hot Water Tank to physically protect.

• Install Flex at Outlet next to Hot Water Tank to physically protect and GFI protect.

• This is a cloth 2-Wire System; need to GFI protect 24 Circuits (QO type Breakers needed).

• Replace existing 20 Halo Track Light Heads with new Direct-Light 50154L GU10 LED Track Lighting

Heads (12 White Track Lighting Heads and 8 Black Track Lighting Heads).

Building 2130 – Rec Storage

• 1 – 4’ 1-Tube Strip Fluorescent T-12; change to new 4’ length, ILLUMINA BS100LED, 50W.

• 1 – 4’ 2-Tube Strip Fluorescent T-12; change to new 4’ length, ILLUMINA BS100LED, 50W.

• (2) Fluorescent Fixtures have no Connector where Romex enters Fixture. Install ½” Flex to protect

Wires.

• Drive Ground Rod below grade.

• GFI protect (4) Outlets.

• Romex is entering top of Panel without a Romex Connector to protect Wire. Add Connector.

• 2 – ½” KO Seals needed at top of Main Panel.

• Install one Dusk to Dawn, 250W Equivalent Forward Throw 55W LED Wall PACK-WMFT-250-BRZ includes Heavy Duty Electronic Photo Control or Equal.

Building 2131 – Carpentry Shop

• Replace Ground Wire from Panel to Ground Rods, drive Ground Rods below grade and install proper

Ground Rod Clamps.

• Outside Spot Light has indoor Box. Replace with Weather Proof Box and strap Conduit down with ½”

EMT.

• Secure (2) ½” EMT Conduits with Strut and Straps above Panel.

• Replace 12 – 8’ Fluorescents with new 4’ length, ILLUMINA BS100LED, 50W.

• Remove two existing mercury vapor luminaire on the roof posts and install two new TDD LED 2 LED

Area Luminaire included mounting arm.

Building 2230 – Bunk House

• Install proper Ground Rod Clamp and drive Ground Rod below grade.

• Bond Metal Rizer to Neutral Bushing with #4 Copper.

• Add 3-Way Switch System to stairs going upstairs.

• Add 3-Way Switch System to stairs going to Basement

• Add J-Box in Attic 4 X 4 – reinstall ½” Flex Connectors and secure Romex, Flex; Box and Blank off.

• KO Seals in Basement at 4 X 4 Boxes. Approximately (4) of them.

• Secure Romex Wires around the room at Ceiling.

• Add Outlet from existing on concrete wall so the Sump Pump Plug will reach.

• Install Connectors on (2) ½” EMT located on ceiling in Basement that has Romex going thru the EMT.

• Remove one existing mercury vapor luminaire on the pole and install one new TDD LED 2 LED Area

Luminaire included mounting arm.

Building 2330 – RBC/Fire/Kitchen

• Replace Ground Wire from Panel to Ground Rods, drive Ground Rod below grade and install proper

Ground Rod Clamps.

• Install Blanks on existing J-Boxes in Attic.

• Install one New Dusk to Dawn, 250W Equivalent Forward Throw 55W LED Wall PACK-WMFT-250-BRZ includes Heavy Duty Electronic Photo Control or Equal. (Locate center of the building)

Building 2530 – Gas & Storage

• Install proper Ground Rod Clamp and drive Rod below grade.

• Secure Panel Rizer with Strut and Strut Straps (X2).

Building 5720 – Heather Meadows

• Change (4) 4’ 4-Tube T-12 Fluorescent Fixtures to 4- new 4’ length, ILLUMINA BS100LED, 50W.

• Change Out (12) 4’ 1-Tube T-12 Fluorescent Fixtures to 6- new 4’ length, ILLUMINA BS100LED, 50W.

• Extend ¾” Flex on Generator and re-connect.

Buildings Location: (OPTION ITEMS)

Baker River Work Center 41382 State Route 20 Concrete, WA 98237

Building 1000 – Residence

• Disconnect and capped all power to this building for demolition.

Building 1002 – Residence/Bunk House

• Replace Strike Knob on Mast – 2” U-bolt (no porcelain left – broken off)

• Bond water and gas to Panel #4 in crawl

• Expose Romex outside back feeding light at slider door – need for physical protection

• 9 – Two Prong Outlets – has ground, but need to extend Ground Wire, Ground Metal Box, and install 3-prong Outlet

• 3 – Reverse Polarity entry Outlet in Living Room

• 1 – No GFI Outlet in Bath – need to add Circuit and Outlet and Disable Outlet in light

• 1 – Reverse Polarity Outlet in Master Bedroom

• Install two Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Replace three bedroom ceiling lights with Brushed Nickel LED Energy Star Flush Mount.

• Install four hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1004 – Residence/Bunk House

• Add 1 – GFI Protected Kitchen Outlet

• Add 1 – Add Bath GFI Circuit

• Add 1 – Gas pipe bond to water

• Install two Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Replace two bedroom ceiling lights with Brushed Nickel LED Energy Star Flush Mount.

• Install four hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1005 – Bunk House

• Gas pipe bond to water

• 1 – GFI protected Kitchen Outlet

• Add Bath Circuit and GFI Outlet

• Install proper J-Box with ½” KO’s at furnace J-Box

• Install proper Ground Rod Clam and Drive Ground Rod below grade

• Install two Bronze 10 ¾”H Dusk to Dawn LED Outdoor Flood Light, Style #3Y659 or Equal.

• Replace two bedroom ceiling lights with Brushed Nickel LED Energy Star Flush Mount.

• Install three hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 2003 – Office – Main Service Generator Back-up

• Existing Manual Generator Transfer Switch is not rated to be used as a Main Service.

• Remove existing Manual Generator Transfer Switch and Generator Plug and re-feed existing inside

Panel. There would be no Generator Back-up System for this building.

Building 2201 Storage Building

• No Ground Rods at Panel - Add new ground rods to panel.

• 2 – QO Breaker Blanks needed

• Secure Panel to Wall

• Strap 1 ¼” PVC above panel

• 6 – 8’ Fluorescent T-12 Single pin. Replace with new 4’ length, ILLUMINA BS100LED, 50W

• EMT Center Post – need Connector to protect Wire.

Building 2204 Office

• Add GFI Protected Bath Outlet

• 6 – Outlets in Dining area open Ground

• GFI protect Mechanical Room Work Outlet

• 14 – 4’ 2-Tube T-12 – Replace with new 4’ length, ILLUMINA BS100LED, 50W

• 4 – Outlets have reverse polarity in chapel – repair outlet.

• Outlets worn out – approximately 10 of them need to be replaced

• 12 – 4’ 4-Tube T-12 - Replace with new 4’ length, ILLUMINA BS100LED, 50W

• Exposed live wires at ceiling where a Spot Light was, and no box – install new LED Spot Light fixture

• No J-Box at 2nd Spot Light – install new LED Spot Light Fixture

• Proper Ground Rod Clamp, and drive Ground Rods below ground

• 5 or more open J-Boxes 3/0” and 4/0” and covered by cardboard in attic – Install proper covers.

Building 2301 Warehouse

• Over fused Wire on 30Amp – should be 20Amp QO

• ¾” KO Seal needed – small sub panel

• 1 ¼” KO Seal needed – small sub panel

• Romex needs protection on top of Panel – add ½” EMT

• At Panel, Conduit at top has no protection – needs connectors (4)

• PVC Conduit needs Connector at top

• Staple UF Wire in rafter in attic

• 4 – Outlet Conduits need Connectors at top for protection

• Alum SER Wire needs stapling in attic

• Romex needs stapling in attic

• Heater Wire needs Connector on Conduit in attic

• 1 ½” Conduit needs Connector at work bench area

• GFI protected carport Outlets (2)

• ½” KO Seal at light in shop

• ½” KO Seal 4X4 Box in Southeast corner

• 2 – 4’ 2-Tube Fluorescents – Replace with new 4’ length, ILLUMINA BS100LED, 50W

• Outlet in the corner shop (brown) has reverse polarity

• Shop Panel 2 – over fused wires; has 30, needs 20QO – replace.

• EMT pulled out and bent at storage room; needs re-securing

• Secure Romex on the front rafters of open bays up high

Building 2501 Gas Storage

• 2” Threaded Seal at Outside Main Panel

• Install Proper Ground Rod Clamp and drive Ground Rod below ground

• Need 1 – ¾” KO Seal at Main Panel (1803)

Building 2600 Fire Engine Storage Building

• Install Special 2-Gang Plate GFI/Blank

• Install 5 - GFI Protected Outlets

• Install running boards in attic next to wire running down the center of building

Darrington Ranger District: Verlot Public Service Center Compound

Buildings Location: BASE ITEMS

Verlot Public Service Center 33515 Mountain Loop Highway Granite Falls, WA 98252

Building 1136 - Residence

• Install GFI and Weather Proof Cover on side outside Outlet.

• Install a 3-Way Switch System to stairs to basement.

• 6 – 4’ 2-Tube T-12 Fluorescent Fixtures in basement; change to 4’ length, ILLUMINA BS100LED, 50W.

• 1 – 4’ 4-Tube T-12 Fluorescent Fixture in basement; change to 4’ length, ILLUMINA BS100LED, 50W.

• Install ½” Flex Connectors on Flex – (2) in Basement.

• 1 – 3/4” KO Seal needed at Sub Panel.

• 1 – GFI at Nook replace existing Receptacle.

• Dining Room – (1) 2-Prong Outlet – remove and install 3-Prong and extend Ground.

• Living Room – (2) 2-Prong Outlets; remove and install 3-Prong and extend Ground.

• Replace Porcelain in Bedroom closets with Fixture with Lens –Replace with Portfolio 9-in W Brushed

Nickel Ceiling Flush Mount Light 23-Watt, Energy Star.

• Small Bedroom – (1) 2-Prong Outlet; change to 3-Prong and extend Ground.

• Upper floor Bedroom – GFI protect (3) Outlets and change to 3-Prong for bedroom to the right.

• 2 – Open 4/0 J-Boxes in side Attic.

• Open J-Boxes in Attic 4/0 – up to (5).

• 1 – 4’ 4-Tube T-12 Fluorescents in Master Bedroom; change to change to Brushed Nickel LED Energy

Star Flush Mount.

• Install four hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Building 1137 - Residence

• 7 – 4-Tube T-12 Fluorescents; change to change to 4’ length, ILLUMINA BS100LED, 50W.

• Add 3-Way Switch System to stairs going upstairs.

• Disable (2) built in Outlets in Vanity Light in Main Floor Bath.

• Change (1) 2-Prong Outlet to a 3-Prong and extend Ground Wire.

• GFI protect (3) Kitchen Outlets.

• Add a 3-Way Switch System on stairs to Basement.

• Secure Dryer Outlet and Flex to concrete wall in Basement.

• GFI protect Outlet above the sink that the washer is plugged into.

• Washer Outlet EMT at Ceiling; install Connector where Wire enters the EMT.

• 2 – ½” KO Seals needed at Panel

• Main Floor Bedroom – change (2) 2-Prong Outlets to 3-Prong and extend Grounds.

• Main Floor 2 Bedrooms – Total of (3) 4’ 4-Tube Fluorescents; change to Brushed Nickel LED Energy Star

Flush Mount.

• Replace (4) Porcelain Pull Chains fixtures in Basement.

Building 1138 Residence (RE-WIRE ENTIRE HOUSE TO MEET TODAY’S CODES)

• Permit

• Install new Strike Knob – old one has pulled off of the house.

• EMT Mast is bent; need to change Mast to PVC.

o Note: PUD Disconnect and Reconnect is needed. Contractors to pay any PUD charges.

• Install proper Ground Rod Clamps and drive Rod below grade.

• Panel is okay

• Install three hardwired Interconnected Smoke and CO Alarm with Battery Backup.

Note: Full Basement has Washer/Dryer/Hot Water/Oil Furnace 120V – all concrete walls. Ceiling is open.

Note: Rooms to be re-wired to today’s codes: In addition install as below:

o Stairs to Basement – 3 Way Switch System o Basement o Kitchen 4 – Recessed Cans change to 6 in.