AG-05K3-S-17-0005_CVRD_Roofing_Replacement.pdf

PDF 4 MB Posted

Attached to
CVRD Main Office Roofing Replacement Federal contract opportunity
Solicitation number
AG-05K3-S-17-0005
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

CVRD Office Roof Replacement Solicitation and Attachments

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

829996

GIFFORD PINCHOT NATIONAL FOREST

10600 NE 51ST CIRCLE

VANCOUVER WA 98682

05K3

Gifford Pinchot National Forest

501 E. 5th Street #404, Vancouver WA 98661 If delivering by FedEx or UPS please use 991 McClellan Road, Vancouver WA 98661

STEVONNE FULLER 360-891-5085

1x 11/22/2016

AG-05K3-S-17-0005

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Cowlitz Valley Ranger District Office Roof Replacement.

Period of Performance: 30 Days from Notice to Proceed.

Proposals due 12/21/2016 1230 PT. Note: Email and fax offers are NOT accepted. See Section L for Proposal Submittal Details.

If you're mailing an offer through USPS use the following address:

Attn: Stevonne Fuller 501 E. 5th Street #404 Vancouver, WA 98661

If you're mailing an offer through UPS or FedEx please use the following address:

Attn: Stevonne Fuller 991 McClellan Road Vancouver, WA 98661

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

5 30 calendar days and complete it within ________________ ________________ calendar days after receiving

12/21/2016

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

GIFFORD PINCHOT NATIONAL FOREST

10600 NE 51ST CIRCLE

VANCOUVER WA 98682

05K3

STEVONNE FULLER

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

Invoice Processing Platform (IPP)

Contract No. AG-05K3-S-17-0005 CVRD Main Office No. 2051 Roofing Replacement

PART I – THE SCHEDULE

1 A.1 FOR INFORMATION CALL:

Robert Jeter 360-497-1152 COR Telephone No.

Sarah Rockey 360-497-1113 Technical Contact Telephone No.

A.2 THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK

DESCRIBED IN THESE DOCUMENTS

Project Name: CVRD Main Office No. 2051 Roofing Replacement Gifford Pinchot National Forest Cowlitz Valley Ranger District Lewis County, Washington

Price Range: $100,000 to $250,000.

PART I - SCHEDULE OF ITEMS

SECTION B – SUPPLIES, SERVICES AND PRICES

CVRD Main Office No. 2051 Roofing Replacement

Gifford Pinchot National Forest Cowlitz Valley Ranger District

Lewis County, Washington The bidder must bid on all items.

NOTE: If Bidder does not intend to charge for a bid Item, a price of "0" or "NO COST" should be shown. If the price is left blank or shown as "No Bid", the entire Bid will be considered Non-Responsive.

Base Item No. 1

ITEM NO. Description Estimated Quantity Unit Unit Price TOTAL

PRICE

07610 Preformed Metal Roofing All LS $____________ $____________ 07631 Gutters and Downspouts 580 LF $____________ $____________

06100 Rough Carpentry (roof deck) 1000 SF $____________ $____________

06100 Rough Carpentry (fascia) 250 LF $____________ $____________

TOTAL PRICE BASE ITEM. $

UNIT MEASUREMENTS: LS = Lump Sum, LF = Linear Foot, SF = Square Foot

Work incidental to item no. ALL ITEMS, include:

CSI Specification Section:

01200 – Mobilization 01620 – Color Schedule 01732 – Selective Demolition 07900 – Sealants 09901 – Painting

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

CVRD Main Office No. 2051 Roofing Replacement General Tasks and Requirements

C.1 Description of Work

The contractor shall complete services in accordance with the requirements specified and in this contract. The project consists of the following major items of work:

GENERAL

This structure currently has one layer of composition type roofing shingles. These shingles shall be removed and replaced with a standing seam, concealed fastener, 24 gauge steel roofing. Roofing shall be installed in strict accordance with manufacturer’s instructions.

ROOFING

The Cowlitz Valley Ranger District has many structures which have had metal roofs installed. The roofing product used on these structures was Taylor MS150 1-1/2” Mechanical Seam.

1. The roofing to be installed by this project will be expected to match the other roofs so that it is not possible to find differences in style, installation, or aesthetic details between the existing residential metal roofs and roof to be applied to the office.

2. Target structure is approximately 11964 square feet.

3. Contractor will provide color samples. Color will be approved by CO at least seven days prior to installation.

4. 30# unperforated asphalt saturated roofing felt underlayment is required.

ROOFING PENETRATIONS

1. Vented ridge cap will be installed and the six existing turbo-vents removed.

2. Restroom vents (2) will be replaced with new, including end dams or, alternatively, venting ducts may be re-routed to eaves. Plans for re-routing to eaves must be approved prior to work commencing.

3. New flashings shall be installed in accordance with manufacturer’s instruction.

These shall include but not be limited to eaves, gable ends, and roofing penetrations. End dams shall be installed on all roofing penetrations.

ROOF DECK

1. Roof decking will be brought back into compliance with applicable codes and regulations prior to application of new roofing.

2. Roof decking repairs shall be paid by square foot of replacement material, regardless of material thicknesses. Specification 06100, Rough Carpentry (roof deck) payments includes installation.

For example:

a) One square foot of plywood equals one square foot of installed repair.

b) Ten feet of 2X6 lumber equals five square feet of installed repair.

3. All repairs that are exposed to weather shall be primed and painted. Contractor shall provide paint to match existing colors. Painting is incidental to 06100, Rough Carpentry.

FASCIA AND BARGE TRIM BOARDS

1. Damaged and/or rotten fascia boards shall be replaced.

2. Damaged and/or rotten barge trim boards shall be replaced

3. All fascia and barge trim boards shall be painted. Painting is incidental to specification 06100 – Rough Carpentry (fascia). Contractor shall provide matching paint.

GUTTERS AND DOWNSPOUTS

1. Currently installed gutters and downspouts will be replaced with like style (“K” style), color to match roofing. 24 gauge steel minimum.

2. Old concrete splash guards shall be removed and disposed off-site. New guards shall installed, concrete, minimum 36” length.

The contractor shall provide any and all labor, equipment, vehicles, services, permits, and licenses, necessary to perform this contract.

This statement of work consists of completing tasks/subtasks required in this contract and meeting the performance requirements as identified following each task/subtask.

C.2 Project Location This project is located at the Forest Service office at 10024 US Highway 12, in Randle, WA, 98377 on the Cowlitz Valley Ranger District of the Gifford Pinchot National Forest, Township 12 North, Range 7 East, Section 16, near the town of Randle, Washington. It may be reached by traveling east on US Highway 12 from the town of Chehalis, WA.

See attached drawings.

(a) Existing Conditions:

The indications of existing conditions on the drawings and specifications are the result of on-site facilities inspections and the best information available at the time.

(b) Weather Conditions:

Weather conditions suitable for roofing replacement are normally expected in July through October. Rain, sometimes heavy, is normal.

(c) Pre-bid Conference: None scheduled.

C.3 Prosecution of Work

(a) General:

The contractor shall conduct activities so that interference with the public and residents is kept to a minimum and existing level of safety is maintained.

C.4 Availability of Specifications or Product Descriptions Not Listed in the GSA Index of Federal Specifications and Standards (FAR 52.210-3) (APR 1984)

Specifications or product descriptions cited herein, but not attached to this solicitation nor listed in the General Services Administration Index of Federal Specifications and Standards (GSAIFSS), may be obtained from:

ASTM Standards American Society for Testing and Materials 100 Bar Harbor Drive West Conshohocken, PA 19428

(610) 832-9585 http://www.astm.org

C.5 Applicable Specifications and Material Certifications

(a) Applicable Specifications:

References to Standard Specifications in the contract refer to the Construction Specifications Institute, Inc. standard specifications for construction and are physically included in Section J of the Contract under the title “LIST OF ATTACHMENTS.”

(b) Product Substitution:

a. Any modification of other items, designs, materials, products or equipment

(including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

(c) Shop Drawings: None required

(d) Submittals: Submittals are required by the following specifications:

http://www/

Brief Title

Basic Reference Specificatio n

Detailed Regulations Specificatio n

Copie s To Submi t

Time For Government Approval After Total Submittal

Work Schedule F.3 (a) 52.236- 15 1 7 days

Landscape Preservation H.2 1 7 days Roofing and Flashing Specs 07610 1.04 1 7 days Gutter and Downspout Specs 07631 1.04 1 7 days Primer and Paint Specs 09901 1.04 1 7 days Color Schedule 01620 2.01a 1 7 days

Work requiring submittals shall not begin until submittals have been approved.

Submittals shall include:

Date and Revision Dates.

Project Name and Contract Number.

Names of Contractor, Subcontractor, Supplier, and Manufacturers.

Contractor's stamp, initialed or signed, certifying review of submittal, verification of field measurement and compliance with contract documents.

Samples:

Physical examples shall illustrate materials, equipment, or workmanship, and establish standards by which completed work shall be judged. Samples shall be of sufficient size and quantity to illustrate the functional characteristics of product or material, with integrally related parts and devices.

Manufacturer's requirements:

Supply manufacturer's catalog sheets or brochures with diagrams, schedules, or performance charts. Illustrations shall be clearly marked to identify pertinent materials or models, dimensions, and clearances required. Supplement standard drawings to provide information unique to this project.

Approval or Rejection Time Allowance:

Submittals will be reviewed and either approved or rejected within _7_ calendar days of receipt by the Contracting Officer or COR.

C.6 AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.7 AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988 )

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

C.8 Definitions and Abbreviations

Wherever in these provisions, or in other contract documents, the following terms, or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:

Building Limits - A line 5 feet outside foundations of the structure.

Calendar Day - Every day shown on the calendar, Sundays and holidays included.

Change Order - A written order issued by the Contracting Officer, to the Contractor documenting modifications within the scope of the contract.

Contract Amendment - A bilateral written supplemental agreement between the Government and the Contractor.

Contract Time - The number of calendar days allowed by the contract for the completion of the work.

Contracting Officer's Representative (COR) - The duly authorized representative of the Contracting Officer, responsible for on-site administration of the contract within the limits of specific written delegation of authority.

Contractor - The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Equipment - All machinery and equipment, together with the necessary supplies for upkeep and maintenance, including tools and apparatus necessary for the proper construction and acceptable completion of the work.

Forest Supervisor - The person, or designated representative, responsible for administration of a National Forest.

Inspector - The Government authorized representative designated in writing by the COR responsible for detailed inspections of contract performance, within delegation of authority.

Materials - Any substances specified for use in the construction of the project and its appurtenances.

Notice of Non-Compliance - Written notice issued detailing specific area(s) of Non- Compliance with contract requirements.

Original Contract Quantities - Those quantities shown in the Schedule of Items.

Right-of-way - A general term denoting land, property, or interest therein acquired for or devoted to a road or a construction site.

Schedule of Items - Schedule in the contract which contains a listing and description of construction items, quantities, units of measure, method of measurement, unit price and amount.

Specifications - A general term applied to all written directions and requirements pertaining to performance of the work.

Utility Services - Services such as electricity, gas, steam, water and sewerage.

Work Order - A written instruction directing the Contractor to fulfill contract requirements.

Reference to a specific standard or specification shall mean the latest edition or amendment in effect on date of invitation to bid.

––-–––– ACRONYMS –––––––

AA Aluminum Association

AASHTO

American Association of State Highway and Transportation Officials

ACI American Concrete Institute ADA Americans With Disabilities Act AGC Associated General Contractors AI Asphalt Institute AISC American Institute of Steel Construction AISI American Iron and Steel Institute AITC American Institute of Timber Construction ALSC American Lumber Standards Committee ANSI American National Standards Institute APA American Plywood Association API American Petroleum Institute ARTBA American Road and Transportation Builders Association

ASHRAE

American Society of Heating, Refrigerating & Air Conditioning Engineers

ASME American Society of Mechanical Engineers ASTM American Society for Testing and Material ATCC American Type Culture Collection AWPA American Wood Preservers Association AWPB American Wood Preservers Bureau AWS American Welding Society AWWA American Water Works Association CFR Code of Federal Regulations CRSI Concrete Reinforcing Steel Institute CS Commercial Standard issued by U.S. Department of Commerce CSI Construction Specifications Institute DEMA Diesel Engine Manufacturers Association DOT U.S. Department of Transportation FAR Federal Acquisition Regulations

FED. SPEC.

FS

Federal Specifications

FHWA Federal Highway Administration FLH Federal Lands Highway (Federal Highway Administration) FSS Federal Specifications and Standards GSA General Services Administration ICBO International Conference of Building Officials ISSA International Slurry Surfacing Association MIL Military Specifications MSHA Mine Safety and Health Administration MUTCD Manual on Uniform Traffic Control Devices NBFU National Board of Fire Underwriters NBS National Bureau of Standards NEMA National Electrical Manufacturers Association NESC National Electrical Safety Code NFPA (Fire) National Fire Protection Association NFPA (Forest) National Forest Products Association NWMA National Woodwork Manufacturers Association OSHA Occupational Safety and Health Act PCA Portland Cement Association

PCI Prestressed Concrete Institute PS Product Standard Issued by the U.S. Department of Commerce PTI Post-Tensioning Institute RIS Redwood Inspection Service SAE Society of Automotive Engineers SF Standard Form SI International System of Units SMACNA Sheet Metal & Air Conditioning Contractors National Association SSPC Steel Structures Painting Council UBC Uniform Building Code UFC Uniform Fire Code UL Underwriter's Laboratories, Inc.

UMC Uniform Mechanical Code UPC Uniform Plumbing Code USASI United States of America Standards Institute WCLIB West Coast Lumber Inspection Bureau WWPAA Western Wood Products Association WWPI Western Wood Preservation Institute

SECTION D – PACKAGING AND MARKING

(For this Solicitation, there are NO clauses in this Section)

SECTION E – INSPECTION AND ACCEPTANCE

E.1 Clauses Incorporated by Reference (FAR 52.252-2) (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

E.2 Inspection and Acceptance (AGAR 452.246-70) (FEB 1988)

(a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

(b) Inspection and acceptance will be performed at the project site.

E.3 Inspection of Roofing Improvements

Work not meeting contract requirements will cause the Contractor to:

• Rework at no cost to the government

• Repair or replace damaged infrastructure/utilities at no cost to the government

• Acceptance with a price reduction http://www.arnet.gov/far/

SECTION F - DELIVERIES AND PERFORMANCE

F.1 Clauses Incorporated by Reference (FAR 52.252-2)(FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the Contractor receives the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

Estimated start work date: December 21st , 2016

F.3 Maximum Workweek – Construction Schedule (AGAR 452.236-75)(NOV 1996)

Within 7 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The approved regular workweek is Monday through Friday, 8:00 a.m. to 5:00 p.m, except Federal Holidays and any other day(s) designated by Federal statute, Executive Order or Presidential proclamation. Requests to work hours outside of the regular workweek hours shall be submitted for approval to the COR at least 24 hours prior to extending work hours. Requests for weekend work will be entertained in the interest of public safety and minimizing employee disruptions. Exceptions to normal duty hours are shown below.

Government personnel observe the listed dates as holidays:

New Year's Day – 1st day of January;

Martin Luther King, Jr's. birthday – 3rd Monday of January;

President's Day – 3rd Monday of February;

Memorial Day - last Monday of May;

Independence Day – 4th of July;

Labor Day – 1st Monday of September;

Veteran's Day – 11th day of November;

Thanksgiving Day – 4th Thursday of November;

Christmas Day - 25th of December; and , any other day designated by federal statute, executive order, or presidential proclamation.

When a holiday falls on a Saturday, the preceding Friday is observed. When a holiday falls on a Sunday, the following Monday is observed.

The Government reserves the right to close its facilities due to weather conditions or medical emergencies as necessary. If the office is closed due to inclement weather or for any other reason, the COR will notify the Contractor as soon as closure is known.

SECTION G – CONTRACT ADMINISTRATION DATA

G.1 Government-Furnished Property

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract:

• None

G.2 Post Award Conference (NOV 1996) AGAR 452.215-73

A post award conference with the successful offeror is required. It will be scheduled and held within _5__ days after the date of contract award. The conference will be held at a mutually agreed upon location.

G.3 Designation of Contracting Officer’s Representative

The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.

The COR is responsible for administering the performance of work under this contract.

In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly.

(This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).

On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits.

Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

G-4 Contract Release

When submitting final payment, Contractor shall provide a signed and dated contract release that includes the following information: "In consideration of receipt of final payment in the amount of $__________ Contractor hereby releases the United States of America from any and all obligations arising under this contract and any modifications thereof except as reserved herein. Reservations:______________"

SECTION H – SPECIAL CONTRACT REQUIREMENTS

H.1 Emergency Control

(a) Maintenance of Existing Facilities:

1. The Contractor shall conduct operations to minimize disruptions to office visitors and employees.

2. The Contractor shall request permission in writing to the COR for any planned disruption of utilities. Such requests shall be submitted at least seven days prior to the planned disruption.

3. Utility disruptions shall be limited to a maximum of 12 hours duration at a time. Do not proceed with utility interruptions without Government’s written permission.

H.2 Landscape Preservation

(a) The Contractor shall confine operations to the immediate vicinity of buildings.

Measures shall be taken to protect flowerbeds, shrubbery, attachments, and etc. from damage and/or disturbance by contractor’s operations.

(b) All nails, flashing, metal debris, and other materials or garbage generated as a result of contractor’s operations shall be picked up and removed from the work areas and disposed of properly.

(c) Prevention of Oil Spills - Spilled product and other chemicals shall be immediately cleaned up

H.3 Plan for Weather-Caused Suspensions of Work

The Contractor shall prepare a plan for weather-caused suspensions of work to ensure protection of structures affected by long or short term precipitation events. The plans shall be consistent with the requirements in the LANDSCAPE PRESERVATION clause contained in this contract. The plan shall be submitted in writing to the Contracting Officer for review and, if acceptable, approval no later than 14 days after contract award.

If rejected by the Contracting Officer, the Contractor shall revise the plan and re-submit it for consideration within three working days of verbal or written notification by the Contracting Officer. The Contractor shall take action consistent with the plan before suspending activity on the site(s). Acceptance of the plan by the Contracting Officer in no way waives any of the requirements of the LANDSCAPE PRESERVATION clause.

H.4 Use of Premises

(a) A storage site will be permitted within the project area. The Forest Service assumes no liability for materials stored within the storage site. The Contractor will be allowed to erect a temporary fence to secure materials and equipment, however, the fence shall be removed and the site restored prior to final acceptance of the contract.

(b) Potable water is available for use during construction.

(c) Electric power is available on site for construction use.

(d) Sanitary facilities are available for use during construction.

H.5 Special Project Requirements

• None

H.6 Prosecution of Work

(a) The Contractor shall conduct activities so that interference with office visitors, employees and their daily activities shall be kept at a minimum. The work site shall be kept free of contractor’s work related hazards as much as possible at all times. Any activities requiring closure of an entrance shall be scheduled with the COR at least 7 days in advance and shall not be in effect more than eight (8) consecutive hours.

(b) The Contractor shall use measures and precautions necessary to warn and protect office visitors and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.

H.7 Final Cleanup

Contractor shall remove and dispose all of its own trash and refuse from the contract area.

This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed off National Forest Land and in accordance with State and Local disposal requirements.

H.8 Potential Safety Hazards

(a) Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[ ] Confined space entry.

[ ] Temporary excavation/deep trenching/slope stability.

[ ] Tree falling.

[x] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[ ] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[ ] Hazardous materials handling.

[ ] Electrical hazard.

[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.

[ ] Mechanical hazards such as pulleys, springs, etc.

[ ] Other __________________________________

H.9 Suspensions for Other Than Government’s Convenience

The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to become muddy or unsuitable; or (2) Failure of the Contractor to comply with Specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by his/her operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242- 14, Suspension of Work, and shall not qualify for equitable adjustment.

PART II – CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/ & www.usda.gov/procurement/plolicy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.202-1 Definitions (NOV 2013) 52.203-3 Gratuities (APR 1984) 52.203-5 Covenant Against Contingent Fees (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (SEP 2006) 52.203-7 Anti-Kickback Procedures (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

(MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform

Employees of Whistleblower Rights (APR 2014) 52.204-4 Printed or Copied Double-Sided on Recycled Paper (MAY 2011) 52.204-9 Personal Identity Verification of Contractor Personnel (JAN 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (OCT

2016) 52.204-13 System for Award Management Maintenance (OCT 2016) 52.204-16 Commercial and Government Entity Code Reporting (JUL 2016) 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

(JUL 2013)

52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-2 Audit and Records -- Negotiation (OCT 2010) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns (NOV 2016) 52.219-14 Limitations on Subcontracting (NOV 2011)

52.222-3 Convict Labor (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY

2014) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Requirements and Related Regulations

(MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (SEPT 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-36 Affirmative Action for Workers with Disabilities (JUL 2014) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employee Rights under the National Labor Relations Act (DEC

2010) 52.222-50 Combating Trafficking in Persons (MAR 2015) 52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2015) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction

Contracts (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG

2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014)

52.228-15 Performance and Payment Bonds – Construction (OCT 2010) 52.229-3 Federal, State, and Local Taxes (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (MAY 2014) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL

2013) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) 52.233-1 Disputes (MAY 2014) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.242-13 Bankruptcy (JUL 1995) 52.243-4 Changes (JUN 2007) 52.244-6 Subcontracts for Commercial Items (NOV 2016) 52.245-1 Government Property (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2015) 52.249-2 Termination for Convenience of the Government (Fixed-Price) (APR 2012)--

Alternate I (SEP 1996) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV

1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 FAR 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013)

(a) Definitions. As used in this clause—

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is “not dominant in its field of operation” when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

https://www.acquisition.gov/far/current/html/52_217_221.html#wp1135887

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts—

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the rerepresentation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its data in SAM, as necessary, to ensure that they reflect the Contractor’s current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs

(e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in ORCA for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it is, is not a small business concern under NAICS Code ______________ assigned to contract number ______________.

[Contractor to sign and date and insert authorized signer’s name and title].

I.3 FAR 52.225-9 Buy American -Construction Materials (MAY 2014) http://www.sba.gov/content/table-small-business-size-standards http://www.sba.gov/content/table-small-business-size-standards

(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means—

(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic;

or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508 http://uscode.house.gov/

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

_______________None_________________________________

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American statute.

(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award.