SF30_Amendment02.pdf

PDF 143 KB Posted

Attached to
Wenatchee River RD Mechanical Fuels Cows Lop Federal contract opportunity
Solicitation number
AG-05K3-S-14-0003a
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This amendment is to provide clarification about the option of Contractor Self-Inspection.

View the file

Other files for this federal contract opportunity

Other files attached to Wenatchee River RD Mechanical Fuels Cows Lop, newest first.
File Type Posted
SF30_Amendment.pdf PDF
Cowslop_AG-05K3-S-14-0003.pdf PDF
Cowslop_AG-05K3-S-14-0003_Attachments.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-05K3-S-14-0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

05K3

VANCOUVER WA 98682

10600 NE 51ST CIRCLE

GIFFORD PINCHOT NATIONAL FOREST

67163011/22/2013

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/15/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Wenatchee River Ranger District Mechanical Fuels Cows Lop

This Amendment is to provide clarification about the option of Contractor Self-Inspection.

See attached for details.

Closing date has not been extended. Offers due 12/3/2013 1400 PT. Acknowledge receipt of this amendment by submitting signed original to issuing office (Box 6) Attn: Stevonne Fuller.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STEVONNE FULLER

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text scfuller Typewritten Text

Contractor Question: Regarding “opt”ing to perform Self Inspection, as described under Contractor Inspection of Thinning on page 13, can you send me more detail about this process?

Answer: See details below.

Contractor Self Inspection

A.The Contractor shall perform inspection of the services using the precise prodecures and methods established below. In addition, the Contractor shall:

1.Provide an Inspector with at least one year of experience thinning trees for the Forest Service. The inspector shall be trained in the required inspection procedures.

2.Perform inspections concurrent with thinning or no later than one day after completing the work on the contract item.

3.Complete inspections on Government-Furnished plot cards (Form R6-

2470-117a).

4.Number all plots consecutively. Mark all plot centers on the ground with colored flagging (Contractor Furnished). A locator plastic flagging of the same color will be tied on the nearest bush or other object at least four feet above ground level. Written information on the locator flag shall include: plot number and date of inspection.

5. Submit the original plot cards to the Contracting Officer's

Representative within one day after completion of each subitem.

Inspection cards will become the property of the Government and will remain a part of the permanent contract file.

6 By submission of the plot cards to the Government, the Contractor is considered to be certifying that the unit is:

a.Satisfactorily completed.

b.Plot cards reflect work accomplished.

7.Contractor shall turn in legible plot cards. Illegible plot cards will be returned to the Contractor, corrected and resubmitted before Government verification inspections are performed.

8.If the Contractor falsifies the inspection results, the Government may choose to terminate the contract for default.

Reinspection Upon Contractor's Request-Self Inspection Verification

A. If the Contractor disputes the Government's verification inspections, the Government will reinspect as stated herein.

B. If the reinspection results are within + 5 percent of the original Contractor's inspections, pay will be based on the Contractor's inspection; the Contractor will not be billed for the Government's inspection costs.

C. If the reinspection results are greater than + 5 percent of the original

Contractor's inspections, pay will be based on a composite of the Government's inspections; the Contractor will be billed for the Government inspection costs.

INSPECTION AND ACCEPTANCE

Weeding, Cleaning and Thinning Inspection Procedure

A.The Contracting Officer Representative will make periodic inspections. The Contractor or his Representative is encouraged to observe the inspection and will receive inspection summaries upon request.

B.Initial inspections will consist of a 100 percent visual inspection and will be based on adherence to the contract specifications.

C. Inspection for acceptance and payment will involve inspection of a series of plots distributed over the entire Subitem sufficient to yield at least a one percent sample of each acre. Plot size will be 1/50 acre. Plot centers will be marked and numbered.

D.Each plot will be examined to record findings on the items listed below:

1.Number of leave trees that should have been left.

2.Number of trees that were left.

3.Number oF satisfactory leave trees.

4.Number of deficient trees.

5.Number of excess trees.

E.Upon inspection of all plots for a Subitem, the quality of weeding, cleaning and thinning shall be calculated as follows:

1.00 - (No. of deficient trees + No. of excess trees x 100 = Quality %

(No. of leave trees that should have been left)

Rework and Reinspection After Rework

When inspection results are below 90 percent and excess trees constitute any part of the deficiency, payment will not be made until the excess tree deficiency has been corrected (see definition of Excess Tree in Section C1.5).

Reinspections after rework will be made in the same manner as the first inspection but on different plot lines. The Contractor shall pay for inspections necessitated by the rework.

Reinspection of Thinning Upon Contractor Request

If the original inspection results are unacceptable to the Contractor and a second inspection is requested without rework, the same inspection procedure will be used. However, the inspection pattern will be shifted. If the second inspection shows less than 5 percent variance from the first inspection, the Contractor shall pay the cost of the second inspection, and the results of the second inspection will be used in determining payment. Requests for reinspection must be made in writing.