J_1-Specifications.pdf
PDF 613 KB Posted
- Attached to
- Kachess Campground Water & Wastewater System Improvements Federal contract opportunity
- Solicitation number
- AG-05G2-S-16-0023
About this file
J-1 Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| f_g_C6_and_C7_Drawings.pdf | ||
| c_Section_110500.pdf | ||
| b_Section_011100.pdf | ||
| a_Schedule_of_Items.pdf | ||
| e_Gale_Creek_Loop_VT_3_Relocation_6_28_2016.pdf | ||
| d_Seed_Kachess_2016.pdf | ||
| Amendment_No_001.pdf | ||
| J-5_Seed_Sources_Kachess2016.pdf | ||
| Solicitation_Kachess_Construction_RFP.pdf | ||
| J_4-Fire_Plan.pdf | ||
| J_2-Plans_Kachess_CG_Phase_I_FINAL.pdf | ||
| J_3-Wage_Determination_No_WA160055.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KACHESS CAMPGROUND SECTION 011100
WATER & WASTEWATER IMPROVEMENTS SUMMARY
1 April, 2013 011100-1
PART 1 - GENERAL
1.01 SUMMARY
A. Section includes:
1. Replacement of approximately 2,900 linear feet of water main and appurtenances, and associated site work.
2. Associated site work includes clearing, grubbing, removal of obstructions, excavation, trenching, filling, grading, paving, and restoration/cleanup.
3. Demolish and abandoning existing facilities. Existing facilities to be demolished include nine flush toilet comfort stations, six concrete septic tanks, 5 steel septic tanks, 6 wood vault toilets, and various water faucet, valves and standpipes.
B. Related Sections:
1. Division 0 Proposal and Contract Requirements
2. Section 013113 - Project Communication and Coordination
3. Section 013215 - Construction Schedules
4. Section 013310 - Submittal Procedures
5. Section 017700 - Closeout Procedures
1.02 DESCRIPTION
A. Unless otherwise indicated, work and responsibilities include, but are not limited to the following:
1. Employing specialists having experience in similar construction projects and in sufficient numbers for supervision and coordination of construction activities, including those by subcontractors and suppliers, and as required to maintain the Construction Progress Schedule and complete the portions of the work by the dates indicated in the Construction Progress Schedule.
2. Providing and paying for labor, materials, equipment, tools, machines, facilities, and services necessary for proper execution, supervision and completion of work.
3. Performing initial review and certification that submittals are complete and comply with requirements of the Contract Documents before submitting to the Contracting Officer (CO) for review.
4. Paying required taxes (including state sales tax).
5. Giving required notices.
6. Using new materials, except as noted.
7. Maintaining required egress and other requirements in accordance with governing
Codes and Ordinances throughout the work.
8. Obtaining and paying for required permits, fees and notices.
1.03 MISCELLANEOUS EXPLANATIONS - INTENT
A. See Division 00 for definitions of terms used in Division 00, Proposal and Contract Requirements.
B. Intent of Language Used in this Project Manual:
1. "Project Manual" means the volume usually assembled for the Work which may include the Proposal requirements, contractual conditions, general requirements and technical specifications.
1 April, 2013 011100-2
2. The Project Manual is part of the Contract Documents between Government and Contractor and is therefore written addressing the Contractor. Although references to subcontractors are made occasionally, it is not the intent of the Project Manual to divide the work into subcontracts; this is the responsibility of the Contractor.
3. The following information is provided to facilitate Project Manual comprehension, format, language, implications, conventions, and content. This information does not modify the substance of any requirements.
a. Project Manual is divided into divisions and sections for convenience. Division titles are not intended to fully describe the work of each division or section, and are not an integral part of the text specifying requirements.
b. Division and section numbers listed in Table of Contents, and items of work included in each section, conform in general to the Construction Specifications Institute’s "Masterformat - Master List of Numbers and Titles for the Construction Industry,” 2004 edition. Numbering of sections is merely for identification and may not be consecutive. Verify contents to be sure manual is complete in accordance with Table of Contents.
c. Except for sections in Division 00, Proposal and Contract Requirements, and certain Division 01 Sections, sections are usually subdivided into three “parts” for uniformity and convenience (Part 1 - General; Part 2 - Products; and Part 3 - Execution).
d. Section pages are numbered independently for each section. Section numbers and page numbers appear at the right bottom of each page of most sections.
e. Trade Associations and General Standard Abbreviations: Generally understood abbreviations may be used in text.
f. The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1) Imperative mood and streamlined language are generally used in the
Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
2) Specification requirements shall be performed by Contractor unless specifically stated otherwise.
4. Reference to Specifications Sections in Division 01: Where General Conditions provisions and Modifications thereto relate generally to work of Contractor and subcontractors as project administrative requirements, procedural requirements, temporary facilities, and the like, these provisions may be amplified by specifications sections in Division 01, “General Requirements.”
5. Government's Representative:
a. The Contracting Officer (CO) is the Government's Representative for contractual and administrative procedures as well as technical matters.
b. The Government’s On-Site Representative or the Contracting Officer’s
Representative (COR) is responsible for day-to-day communications and on-site observation.
C. Intent of Drawings:
1. The Drawings are the graphic and pictorial portions of the Contract Documents showing the design, location and dimensions of the Work, generally including plans, elevations, sections, details, schedules and diagrams. Drawings are in part diagrammatic and do not necessarily show complete details of construction, work or materials, performance or installation. They do not necessarily show how construction details, other items or work, fixtures, and equipment may affect any particular installation. Ascertain and correlate the work to bring the parts together into a satisfactory and completed whole.
1 April, 2013 011100-3
2. Drawings do not show exact characteristics of the Work, piping and air distribution configurations, or necessary number of fittings. The Drawings indicate only such details as are necessary to show intent of the work. In order to illustrate the Work, the CO may furnish additional Drawings, explanations and clarifications consistent with the original Drawings, purpose and intent of the Contract. Conform Work to such Drawings and explanations. The furnishing of such additional Drawings, explanations or clarifications is for the convenience of the Contractor and shall not entitle the Contractor to an increase in the Contract time or Contract Sum.
3. Furnish and install work not covered under any heading, Section, branch, class or trade of the Project Manual, but shown on or reasonably inferable from the Drawings. This includes work necessary to produce the intended results.
4. Do not scale drawings. Dimensional accuracy is not guaranteed, and field verification of dimensions, locations, and levels to suit field conditions is required.
D. First Class Workmanship is expected.
1. Prior to installing an item or material, verify that receiving surfaces are plumb, level, true to line, and straight to the degree necessary to achieve tolerances specified or required.
Perform without extra cost shimming, blocking, grinding, or patching required to make such surfaces plumb, level, true to line and straight.
2. Take care in attention to details and fitting at intersections and junctures of materials.
Joints are to be tight, straight, even, and smooth.
E. Fastening and Connections: Furnish fastenings and connections necessary and adequate to assemble work whether indicated or not. Provide proper assemblage for intended performance of components and assemblies; bonds shall bond properly, fastening shall fasten properly; operable items shall operate smoothly, without sticking or binding, and without “play” or looseness; and the like.
F. Presence of Government's Representatives: Do not construe presence of these persons at the Project Site as assuring compliance with Contract Documents.
G. General Installation Provisions: Provide items, articles, materials, and operations listed, including labor, materials, equipment and incidentals required for their completion.
1. Installer’s Inspection of Conditions:
a. Require the installer of each major unit of work to inspect the substrate to receive work and conditions under which the work is to be performed.
b. The installer shall report unsatisfactory conditions in writing to the Contractor.
c. Do not proceed with the work until unsatisfactory conditions have been corrected in a manner acceptable to the installer. Start of work constitutes acceptance of substrates.
2. Inspection of Items to be Installed:
a. Inspect each item of materials or equipment immediately prior to installation.
b. Reject damaged and defective items.
3. Attachment and Connection:
a. Provide attachment and connection devices and methods for securing work.
Secure work true to line and level, and within recognized industry tolerances.
Allow for expansion and building movement.
b. Provide uniform joint width in exposed work. Arrange joints in exposed work as drawn or to obtain the best visual effect. Refer questionable visual-effect choices to the CO for final decision.
4. Measurements: Check measurements and dimensions of the work, as an integral step of starting each installation.
1 April, 2013 011100-4
5. Dimensions and Measurements on Drawings:
a. Dimensions govern.
b. Do not scale.
c. Check dimensions in the field and verify them with respect to adjacent or incorporated work.
1) Information concerning existing conditions was considered suitable for preparation of the Drawings and is given for Contractor’s convenience. CO and Government do not guarantee accuracy of such conditions.
6. Weather Conditions:
a. Install each unit of work during weather conditions and project status which will ensure the best possible results in coordination with the entire work.
b. Isolate each unit of finished work and protect as necessary to prevent deterioration.
c. Inspection and Tests: Coordinate enclosure of the work with required inspections and tests, so as to minimize the necessity of uncovering work for that purpose.
7. Inspection and Tests: Coordinate enclosure of the work with required inspections and tests, so as to minimize the necessity of uncovering work for that purpose.
1.04 CONTRACT
A. Contract: Construct work under a single, fixed-price Contract.
1.05 GOVERNMENT’S REPRESENTATIVE
A. This Project is administered by the Contracting Officer (CO) and the Government’s Field Representative (COR) as identified above and in Division 00, Proposal and Contract Requirements.
1.06 SEQUENCE/PHASING
A. Use any sequence of operations compatible with monthly Progress Schedule, in accordance with Section 013215, Construction Schedules, and following:
1. These documents shall not be interpreted implicitly or explicitly as definition of procedure and sequence of operations. Order as to procedure and sequence of operations are Contractor’s options, consistent with Contract Documents and as approved by Government.
2. Protect existing operations and maintenance functions from disruption during construction of new facilities until new facilities have been occupied and are fully functional. Conduct demolition of existing facilities and site work to be removed in a manner that does not interrupt Government activities. Maintain public access to all areas not actively under construction.
3. Access Road: Schedule to minimize impacts on Government’s use of premises. No temporary roads or access corridors shall be constructed without prior approval.
B. The project site includes an operational United States Department of Agriculture Forest Service (USDA FS) campground. The project includes demolition and replacement of restroom facilities. The Contractor shall schedule the construction work in a phased manner to maintain adequate facilities at all times.
1. Contractor shall schedule Work in a manner conforming to the requirements of this
Construction Sequence. Contractor shall schedule the Work, prepare and submit a critical path schedule in accordance with Section 013215 Construction Schedules.
1 April, 2013 011100-5
Contractor may submit for review a proposed alternate sequence that meets the requirements of the project. It shall be the Contractor’s responsibility to locate staging and project trailers in a manner consistent with the phased construction of the site.
2. Contractor shall prepare a Stormwater Pollution Prevention Plan, and shall construct, maintain and relocate Temporary Erosion and Sedimentation Control (TESC) measures in accordance with Section 312513 Erosion Controls. The stormwater controls shall follow the phasing of construction.
3. Utility construction and demolition of existing facilities shall be scheduled such that services to the occupied campground areas are maintained at all times.
C. Construction vehicle access shall be via the existing access. Contractor shall provide traffic control in accordance with DOT requirements.
1.07 CONTRACTOR’S USE OF PREMISES
A. Contractor shall have use of the premises as indicated in Section 015200, Construction Facilities, for execution of the work during the contract time. Schedule and coordinate work in areas indicated as "intermittent work areas" to minimize impacts to Government use.
1. Construction Staging Area: To protect subgrade in areas designated for infiltration facilities, Contractor shall limit parking, staging, temporary offices and stockpiling to areas already paved or otherwise compacted.
2. Coordinate use of Project Site with the Government prior to utilization of area and during the construction phase. Modify or change the staging and parking areas as required by Paragraph 011100-1.06 Sequence/Phasing, the Progress Schedule described in Section 013215, Construction Schedules. Provide barriers as described in Section 015200, Construction Facilities.
3. Coordinate staging and parking areas with subcontractors and material suppliers.
4. Protection of existing trees and sensitive vegetation: Take steps to assure protection of trees and vegetation to be retained including “unique species areas”.
B. Assume full responsibility for the protection and safekeeping of products and equipment under this Contract, stored on the Project Site.
C. Move stored products at no cost to the Government, under Contractor’s control, which interfere with operations of the Government or separate contractors.
D. Obtain and pay for the use of additional storage or work areas on or off Project Site as needed for operations.
E. Do not allow storage of flammable liquid or hazardous materials in any of the campground buildings.
F. Procedure in the event unknown hazardous materials are encountered:
1. Immediately stop work and seal off the areas.
2. Immediately report discovery to Government.
G. There is a water supply well on site as well streams and Lake Kachess, as noted on the drawings. The well has a 100-foot radius pollution control protection area. The streams and lake have designated setbacks. The contractor shall not; dump waste, store materials, locate temporary facilities, park vehicles or equipment in these areas.
1 April, 2013 011100-6
H. There shall be no camping or overnight occupancy on National Forest land.
1.08 EXISTING UTILITIES
A. Utilities of record are shown on the Drawings. Utilities are shown for convenience only. The Government and Government’s representatives assume no responsibility for improper locations or failure to show utility locations on the Drawings. At own expense, immediately repair utilities damaged during construction.
B. Prior to commencing activities which may damage utilities, exercise appropriate care (by use of probes, hand excavation, and the like) to locate and prevent damage to existing utilities and drainfields.
C. Contact locating services as needed to assure utility locations on site and in Right-of-Way.
D. Maintain current utilities serving existing buildings until new are constructed and fully operational.
1.09 CONFLICTS AND OMISSIONS IN DRAWINGS AND SPECIFICATIONS
A. Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by Government. If, during the performance of the Work, Contractor finds a conflict, error, inconsistency, or omission in the Contract Documents, it shall promptly and before proceeding with the Work affected thereby, report such conflict, error, inconsistency, or omission to the CO and COR in writing.
1. Where conflicts and omissions have not been brought to the CO and COR’s attention, it is understood that provisions for the most costly method or methods have been made.
1.10 GOVERNMENT FURNISHED PRODUCTS
A. General: Certain items, designated on the Drawings by the abbreviations “GFCI,” “GFOI” and “NIC” often require blocking, backing and accessory items necessary to complete the installations. This blocking, backing and accessory items for complete installations are requirements of this Project as further defined below.
B. Items, designated by the Drawings by the abbreviations “GFCI” meaning “Government Furnished, Contractor Installed”, “GFOI” meaning “Government Furnished, Government (owner) Installed”, or “NIC” meaning “Not In Contract,” will be furnished and installed by the Government.
1. GFCI Items:
a. Provide installation and any other necessary work required for proper installation and future operation of the specified equipment. Confirm with Government work to be done such as final finished grading and site restoration.
b. GFCI items include but are not necessarily limited to:
1) CXT Vault Toilets.
2. GFOI Items:
a. Provide blocking and any other necessary work required prior to actual installation. Confirm with Government work to be done such as blocking or cut outs.
b. GFOI items include but are not necessarily limited to:
1) Refer to Equipment Schedule for existing equipment to be relocated and new equipment.
1 April, 2013 011100-7
3. NIC Items:
a. Provide blocking and any other necessary work required prior to actual installation. Confirm with Government work to be done such as blocking or cut outs.
b. Contractor is not required to perform work except where tolerances and other parameters are illustrated or Contract work is clarified. Bring to Government’s attention where NIC items may be compromised by Contract work.
1.11 MISCELLANEOUS
A. Miscellaneous Items include, but are not limited to:
1. Maintaining pedestrian and vehicular access to and around existing facilities. No pioneering roads may be created without prior approval.
2. Not unreasonably encumbering site with materials or equipment.
3. Not loading structure with weight endangering it.
4. Repairing to original conditions damage to existing paving or adjacent buildings or improvements.
5. Maintaining existing “accessible” (“ADA”) routes.
END OF SECTION
KACHESS CAMPGROUND SECTION 012200
WATER & WASTEWATER IMPROVEMENTS UNIT PRICES
1 April, 2013 012200-1
1.01 SUMMARY
A. Section includes:
1. Administrative and procedural requirements for unit prices.
B. Related Sections:
1. Section 00100 Section 1 - Instructions to Proposers, Proposal Evaluation and
Contract Award:
Section 8 – Mandatory Forms and Documents
1.02 DEFINITIONS
A. Unit price is an amount proposed by Proposers, stated on the Proposal Form, as a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if the estimated quantities of Work required by the Contract Documents are increased or decreased.
B. Unit prices include all necessary material, labor, equipment, services, mobilization, demobilization, safety and tool costs, delay and impact costs, insurance, overhead, profit, and applicable taxes.
1.03 PROCEDURES
A. Notify the Government’s Construction Representative/Commissioning Agent when work designated as an allowance or unit price is to be performed.
B. Change Order Pricing -- Unit Prices: Whenever Government’s Construction Representative/Commissioning Agent authorizes any Work on a unit-price basis the following rules shall apply:
1. The Government's authorization shall clearly state:
a. Scope of work to be performed;
b. Type of reimbursement including pro-agreed rates for material quantities; and
c. Cost limit of reimbursement.
2. Contractor (including subcontractor) executing the Work shall:
a. Cooperate with Government and assist in monitoring the Work being performed, identify workers assigned to the Change Order Work and areas in which they are working;
b. Leave access as appropriate for quantity measurement; and
c. Not exceed any cost limit(s) without Governments prior written approval.
3. Submit costs in accordance with Section 012910, Applications for Payment, and the following requirements:
a. Unit prices shall include reimbursement for all direct and indirect costs of the
Work, including overhead and profit, and bond and insurance costs; and
b. Quantities shall be supported by field measurement statements signed by
Government.
1 April, 2013 012200-2
PART 2 - PRODUCTS
2.01 MATERIALS
A. Comply with Specifications and standards for each applicable product.
PART 3 - EXECUTION
3.01 UNIT PRICE SCHEDULE
A. 4” HDPE DR-9 Water Main - Section 331116:
1. Basis of Measurement: By the Linear foot.
2. Basis of Payment: Includes, but is not limited to, hand trimming, excavation, pipe and fittings, installation, bedding, concrete thrust restraints, testing and connection to building service piping and to other installed features.
B. 4” Ductile Iron Class 52 Water Main w/Pipe Supports (Bridge Crossing) – Section 331116:
1. Basis of Measurement: By the Linear foot.
2. Basis of Payment: Includes, but is not limited to hand, trimming, excavation, pipe and fittings, installation, bedding, concrete thrust restraints, testing and connection to building service piping and to other installed features.
C. 2” HDPE DR-9 Water Main – Section 331116:
1. Basis of Measurement: By the Linear foot.
2. Basis of Payment: Includes, but is not limited to, hand trimming, excavation, pipe and fittings, installation, bedding, concrete thrust restraints, testing and connection to building service piping and to other installed features.
D. 2” PVC SCH-40 Electrical Conduit:
1. Basis of Measurement: By the linear foot.
2. Basis of Payment: Includes, but is not limited to, hand trimming, excavation, conduit and fittings, installation, bedding and connection to utility structures.
E. 4” R/S Gate Valve – Section 331216:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Basis of Payment: Includes, but is not limited to, valve, fittings, installation, valve box, markers and accessories.
F. 2” Air & Vacuum Release Valve Assembly – Section 331116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, valve assembly fittings, box, saddle, pipe, support post, installation, and accessories in accordance with detail.
G. 1” Water Service Connection & Piping – Section 331116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, saddle, fittings, pipe, installation, and accessories in accordance with detail.
H. Filling Station Hydrant – Section 331116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, hydrant assembly fittings, pipe, support post, installation, and accessories in accordance with detail.
1 April, 2013 012200-3
I. Fixed Bollard – Section 331116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, bollard, installation, and accessories in accordance with detail.
J. Handhole & Cover:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, handhole, including any necessary extensions, cover, installation, and accessories.
K. Trench Backfill – Section 310516:
1. Basis of Measurement: By the cubic yard.
2. Basis of Payment: Includes, but is not limited to, supplying backfill material, hauling, stock piling, placing, compacting and testing in accordance with the plans and specifications.
L. Crushed Surfacing Top Course – Section 310516:
1. Basis of Measurement: By the ton.
2. Basis of Payment: Includes, but is not limited to, supplying crushed surfacing, hauling, stock piling, preparing base, placing, compacting and testing in accordance with the plans and specifications.
M. Crushed Aggregate Base – Section 321204:
1. Basis of Measurement: By the ton.
2. Basis of Payment: Includes, but is not limited to, supplying crushed surfacing, hauling, stock piling, preparing base, placing, compacting and testing in accordance with the plans and specifications.
N. Hot Mix Asphalt Paving – Section 321200:
1. Basis of Measurement: By the ton.
2. Basis of Payment: Includes, but is not limited to, preparing mix design, supply asphalt, hauling, preparing base, primer, tack coating surfaces, placing, compacting, rolling and testing in accordance with the plans and specifications.
O. Remove Existing Water Main Appurtenances and Abandon Existing Main – Section 024116:
1. Basis of Measurement: Lump sum.
2. Basis of Payment: Includes removal of accessories including but not limited to spigots, valves, boxes, drains, exposed piping, and other appurtenances that will not utilized in the proposed system. Cut, cap, and abandoning of buried waterline in place, and removal or decommissioning of other items needed to ensure that items will not create a hazard, or otherwise impede the safety, operation, or maintenance of the system in the future.
P. Demo. Existing Comfort Station and Appurtenances Including Septic Tank – Section 024116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, demolition, removal and disposal of all structures (including fixtures, plumbing and electrical connections), concrete pads/foundations, associated walkways and access paths, pumping, demolition and removal (where indicated) of all septic tanks, abandonment of associated drainfields, and completion of all filling, grading and native seeding as needed to restore the area in accordance with the plans and specifications.
1 April, 2013 012200-4
Q. Demo. Existing Vault Toilet Station – Section 024116:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, pumping tank, demolition, removal and disposal of all structures, tanks, concrete pads/foundations, associated walkways and access paths and completion of all filling, grading and native seeding as needed to restore the area in accordance with the plans and specifications.
R. Abandon Existing RV Dump Station – Section 024116:
1. Basis of Measurement: Lump sum.
2. Basis of Payment: Includes, but is not limited to, pumping tank, demolition/abandonment of tank and associated drainfield, filling, grading and native seeding as needed to restore the area in accordance with the plans and specifications.
S. Clearing and Grubbing – Section 311000:
1. Basis of Measurement: Lump sum.
2. Basis of Payment: Includes, but is not limited to, clearing and grubbing all areas as necessary for the completion of the project in accordance with the plans and specifications.
T. Rough Grading – Section 312213:
1. Basis of Measurement: By the cubic yard.
2. Basis of Payment: Includes, but is not limited to, all rough grading (including filling) necessary for the completion of the project in accordance with the plans and specifications.
U. Gravel Borrow Including Haul – Section 310516:
1. Basis of Measurement: By the cubic yard.
2. Basis of Payment: Includes, but is not limited to, supplying borrow material, hauling, stock piling, placing, compacting grading and seeding in accordance with the plans and specifications.
V. Install CXT Vault Toilet Facility (Single and Double) – Section 110500:
1. Basis of Measurement: By the unit (each).
2. Basis of Payment: Includes, but is not limited to, supplying all material, completing all necessary site work, setting all necessary tanks and base material, complete facility installation, backfilling and final grading, and all other work necessary for the complete installation of the facility in accordance with the plans and specifications.
KACHESS CAMPGROUND SECTION 012910
WATER & WASTEWATER IMPROVEMENTS APPLICATIONS FOR PAYMENT
1 April, 2013 012910-1
1.01 SUMMARY
A. This Section specifies administrative and procedural requirements governing the Contractor's Applications for Payment and completion of the Project.
B. Related Sections:
1. Division 0 Section 2 - General Contractual Terms and Conditions:
Article GC-4: 4.0: Payments
2. Section 013215 - Construction Schedules
3. Section 013310 - Submittal Procedures: list of subcontractors
4. Section 017419 - Construction Waste Management and Disposal: submittal of
Construction Waste Management Plan
5. Section 017700 - Closeout Procedures
1.02 PAYMENTS
A. Contract Sum: Government shall pay Contractor the Contract Sum for performance of the Work, in accordance with the Contract Documents. The Contract Sum shall include all taxes imposed by law and properly chargeable to the Project, including sales tax.
B. Schedule of Values: Before submitting its first Application for Payment, Contractor shall submit to Government for approval a breakdown allocating the total Contract Cost to each principle category of work, in such detail as requested by Government (“Schedule of Values"). The approved Schedule of Values shall include appropriate amounts for demobilization, record drawings, O&M manuals, and any other requirements for Project closeout, and shall be used by Government as the basis for progress payments. Payment for Work shall be made only for and in accordance with those items included in the Schedule of Values.
1. See Article 1.04 below for further description of Schedule of Values.
C. Application for Payment:
1. At monthly intervals, unless determined otherwise by Government, submit to CO an itemized Application for Payment for Work completed in accordance with the Contract Documents and the approved Schedule of Values. Each application shall be supported by such substantiating data as Government may require.
2. See Article 1.05 for further description of Applications for Payment.
D. Progress Payments:
1. Government will make progress payments, in such amounts as Government determines are properly due, within 30 days after receipt of a properly executed Application for Payment. Government shall notify Contractor in accordance with RCW
39.76 if the Application for Payment does not comply with the requirements of the Contract Documents.
2. Government shall retain 5 percent of the amount of each progress payment until 45 days after Final Acceptance and receipt of all documents required by law or the Contract Documents, including, at Government's request, consent of surety to release of the retainage. In accordance with RCW 60.28, Contractor may request that monies reserved be retained in a fund by Government, deposited by Government in a bank or savings and loan, or placed in escrow with a bank or trust company to be converted into bonds and securities to be held in escrow with interest to be paid to Contractor.
1 April, 2013 012910-2
Government may permit Contractor to provide an appropriate bond in lieu of the retained funds.
3. Title to all Work and materials covered by a progress payment shall pass to Government at the time of such payment free and clear of all liens, claims, security interests, and encumbrances. Passage of title shall not, however, relieve Contractor from any of its duties and responsibilities for the Work or materials, or waive any rights of Government to insist on full compliance by Contractor with the Contract Documents.
4. Payments due and unpaid in accordance with the Contract Documents shall bear interest as specified in RCW 39.76.
E. Payments Withheld:
1. Government may withhold or, on account of subsequently discovered evidence, nullify the whole or part of any payment to such extent as may be necessary to protect Government from loss or damage be reasons including but not limited to:
a. Work not in accordance with the Contract Documents;
b. Reasonable evidence that the Work required by the Contract Documents cannot be completed for the unpaid balance of the Contract Sum;
c. Work by Government to correct defective Work;
d. Failure to perform in accordance with the Contract Documents; or
e. Cost or liability that may occur to Government as the result of Contractor’s fault or negligent acts or omissions.
2. In any case where part or all of a payment is going to be withheld for unsatisfactory performance. Government shall notify Contractor in accordance with RCW 39.76.
F. Retainage and Bond Claim Rights: RCW chapters 39.08 and 60.28, concerning the rights and responsibilities of Contractor and Government with regard to the performance and payment bonds and retainage, are made a part of the Contract Documents by reference as though fully set forth herein.
1. See Article 1.07 for additional requirements for release of retainage.
1.03 COMPLETION
A. Substantial Completion: Substantial Completion is the stage in the progress of the Work (or portion thereof designated and approved by the CO when the construction is sufficiently complete, in accordance with the Contract Documents, so Government can fully occupy the Work (or the designated portion thereof) for the use for which it is intended. All Work other than incidental corrective or punch list work shall be completed. Substantial Completion shall not have been achieved if all systems and parts are not functional, if utilities are not connected and operating normally, if all required occupancy permits have not been issued, or if the Work is not accessible by normal vehicular and pedestrian traffic routes. The date Substantial Completion is achieved shall be established in writing by Government’s Construction Representative/ Commissioning Agent. Contractor may request an early date of Substantial Completion which must be approved by Change Order. Government's occupancy of the Work or designated portion thereof does not necessarily indicate that Substantial Completion has been achieved.
B. Prior Occupancy:
1. Government may, upon written notice thereof to Contractor, take possession of or use any completed or partially completed portion of the Work ("Prior Occupancy") at any time prior to Substantial Completion. Unless otherwise agreed in writing, Prior Occupancy shall not: be deemed an acceptance of any portion of the Work; accelerate the time for any payment to Contractor; prejudice any rights of Government provided by any insurance, bond, guaranty, or the Contract Documents; relieve Contractor of the
1 April, 2013 012910-3 risk of loss or any of the obligations established by the Contract Documents; establish a date for termination or partial termination of the assessment of liquidated damages; or constitute a waiver of claims.
2. Notwithstanding anything in the preceding paragraph, Government shall be responsible for loss of or damage to the Work resulting from Prior Occupancy. Contractor's one year duty to repair and any system warranties shall begin on systems activated and used by Government as agreed in writing by Government and Contractor.
C. Final Completion, Acceptance and Payment:
1. Final Completion shall be achieved when the Work is fully and finally complete in accordance with the Contract Documents. The date Final Completion is achieved shall be established by Government in writing.
2. Final Acceptance is the formal action of Government acknowledging Final Completion.
Prior to Final Acceptance, Contractor shall, in addition to all other requirements in the Contract Documents, submit to Government’s Construction Representative/Commissioning Agent a written notice of any outstanding disputes or claims between Contractor and any of its Subcontractors, including the amounts and other details thereof. Neither Final Acceptance, nor final payment, shall release Contractor or its sureties from any obligations of these Contract Documents or the Public Works Bond, or constitute a waiver of any claims by Government arising from Contractor's failure to perform the Work in accordance with the Contract Documents.
3. Acceptance of final payment by Contractor, or any Subcontractor, shall constitute a waiver and release to Government of all claims by Contractor, or any such Subcontractor, for an increase in the Guaranteed Contract Cost or the Contract Time, and for every act or omission of Government relating to or arising out of the Work, except for those Claims made in accordance with the procedures, including the time limits, set forth in Division 00, Proposal and Contract Requirements.
4. See Article 1.05 for Application for Final Payment.
1.04 SCHEDULE OF VALUES
A. Submit a list of all subcontractors and material suppliers.
B. The Schedule of Values and the Contractor's Construction Schedule shall be developed and agreed to in conjunction with the subcontractors.
1. Correlate line items in the Schedule of Values with other required administrative schedules and forms, including:
a. Items required to be indicated as separate activities in Contractor's Construction
Schedule.
b. Application for Payment forms, including Continuation Sheets (AIA 702/703).
2. Submit the Schedule of Values to the CO approval at the earliest possible date but no later than 30 days after the issuance of the Notice to Proceed, and not less than 14 days prior to the first application for payment.
C. Use the Project Manual Table of Contents as a guide to establish the format for the Schedule of Values. Provide at least one line item for each listed Specification Section beginning with Division 02, relating directly to the pertinent applicable activities of the Progress Schedule, with each line item broken down separately for labor and materials. Include the following as a minimum:
1. Include separate line item values for construction progress schedule and updates, mobilization, permits/bonds/insurances, temporary facilities, supervision, survey and layout, demobilization, commissioning and equipment/systems start-up, and project closeout retainage.
1 April, 2013 012910-4
a. Temporary facilities and other major cost items that are not a direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.
b. Demobilization shall not be less than 1 percent of the Contract amount.
c. Project closeout retainage value, for duration between Substantial Completion and Final Acceptance, shall not be less than 2 percent of the Contract amount.
Of that amount, half will be for “Punchlist Work”. This amount will not be released until Final Completion is reached.
d. Schedule preparation and updates shall not be less than 1/2 percent of the Contract amount.
e. Commissioning shall be not less than 1 percent of the Contract amount (see Section 019133 – General Commissioning Requirements).
2. Major cost items, which are not directly a cost of actual work-in-place, such as distinct temporary facilities, may be either shown as items in the Schedule of Values or included in General Conditions and Mobilization or Demobilization at the Contractor’s option.
3. Line item amounts shall be rounded off to nearest whole dollar, with total of the primary Schedule of Values breakdown equal to the Contract Sum.
4. Provide at least one line item for each Specification Section, and at least one line item for each pertinent item within each specification section.
5. Provide breakdown by phasing of construction, and area of work by Sitework, Administration/Operations Building, Maintenance Building, Fuel and Wash.
6. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment, purchased or fabricated and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. Include requirements for insurance and bonded warehousing, if required.
7. Unit Cost Allowances: Show the line-item value of unit-cost allowances, as a product of the unit cost, multiplied by the measured quantity. Estimate quantities from the best indication in the Contract Documents.
8. Margins of Cost: Show line items for indirect costs and margins on actual costs only when such items are listed individually in Applications for Payment. Each item in the Schedule of Values and Applications for Payment shall be complete. Include the total cost and proportionate share of general overhead and profit margin for each item.
D. Identification: Include the following Project identification on the Schedule of Values:
1. Project name and location.
2. Name of CO.
3. Project Number.
4. Contractor’s name and address.
5. Date of submittal.
E. Listing: Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:
1. Related Specification Section.
2. Description of Work.
3. Change Order (numbers) that affect value.
4. Dollar value.
5. Percentage of Contract Sum to nearest 1/100 of a percent, adjusted to total 100 percent.
F. Schedule of Values Updating: Update and resubmit Schedule of Values prior to the next Application for Payment when Change Orders or Construction Change Directives result in a
1 April, 2013 012910-5 change in the Contract Sum. Add a new line item for each Change Order, and provide a breakdown of several line items for large or complicated Change Orders.
1.05 APPLICATIONS FOR PAYMENT
A. General:
1. Submit itemized payment request as required in Division 00, Proposal and Contract
Requirements, together with Schedule of Values and other submittals as listed herein.
Use AIA Forms G702, G703 as approved by the Government’s Construction Representative/Commissioning Agent.
2. Except as otherwise indicated, sequence of progress payments shall be regular, and each must be consistent with previous applications and payments; it is recognized that certain applications involve extra requirements, including initial application, application at times of Substantial Completion, and final payment application.
3. Do not "project" work completed beyond the date of Application for Payment submittal for the purpose of payment request.
4. Include Summary of Waste Generated by Project as further described in Section 017419, Construction Waste Management and Disposal.
B. Each Application for Payment shall be consistent with previous applications and payments as certified by the Government’s CO and paid for by the Government.
1. If the Contractor withholds any portion of a previous payment from a subcontractor or material supplier, other than normal retainage, the Contractor shall provide a letter to the Government’s Construction Representative/Commissioning Agent with the next Application for Payment stating the reasons for withholding the payment.
C. Payment Application Times: Progress payments will be based upon a monthly period, with the last day of each month being the cut-off date. The new payment period will then begin on the first day of each month.
D. Draft Payment Application: Draft copies shall be provided to the CO by e-mail at least 48 hours prior to the last regular construction meeting of the month at which the payment request will be reviewed. The draft payment request shall be a copy of the previous month’s approved payment request, with proposed percentages and dollar amounts (rounded off to nearest whole dollar) hand written beside each line item, and a total percentage complete and dollar amount for the month. Once the amounts are reviewed and agreed to by the CO, the Contractor shall prepare the actual payment request as required in this section based upon the amounts agreed to.
1. Make available for Government’s CO review current Project Record Documents delineating any and all revisions since the previous application for payment.
E. Application Preparation: Complete every entry on the actual payment request form. The Government’s Construction Representative/Commissioning Agent will return incomplete applications without action.
1. Entries shall match data on the Schedule of Values and the Contractor's Construction
Schedule. Use updated schedules if revisions were made.
2. Include amounts of Change Orders issued prior to the last day of the construction period covered by the application. If a Change Order includes more than one Change Order Proposal (COP) or Construction Change Directive (CCD), list each COP or CCD individually.
1 April, 2013 012910-6
F. Transmittal: Submit one original signed copy (no photocopies of signatures are permitted) of each Application for Payment to the Government’s CO by a method ensuring receipt within 2 business days.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information related to the application, in a manner acceptable to the CO.
G. Initial Payment Application: The principal administrative actions and submittals which must precede or coincide with submittal of first payment application can be summarized as follows, but not necessarily by way of limitation:
1. Submit Statement of Intent to Pay Prevailing Wages on Public Works Contract on form issued by the State of Washington, Department of Labor and Industries. One is required from the Contractor and one from each of those subcontractors who will provide labor on the Project Site.
a. When these forms have been filled in, the Contractor shall send them to the
Industrial Statistician in Olympia for certification. After certification, three copies will be returned to the Contractor. Contractor shall forward the Government's copy directly to the Government’s Construction Representative/Commissioning Agent. The Contractor shall also post on the Project Site one certified copy of each Statement of Intent. For further information, phone the Industrial Statistician
(360) 902-5335.
b. Processing of an application will not begin until an approved copy is on file with the Government for each classification of laborers, workers, or mechanics employed by the Contractor or subcontractor that are included in an application for payment; no exceptions.
2. Submit and receive review comments for Construction Progress Schedule.
3. Submit schedule of values, allocated to the various portions of the work; the schedule shall be used as a basis for the Contractor's Application for Payment.
4. List of Subcontractors, complete with phone numbers, business address and contact person.
5. List of major material suppliers and fabricators, complete with phone numbers, business address and contact person.
6. Contractor’s Progress Schedule (preliminary if not final).
7. Schedule of Unit Prices, where applicable.
8. Schedule of Submittals (preliminary if not final).
9. Listing of Contractor's staff assignments and principal consultants.
10. Copies of acquired building permits and similar authorizations and licenses from governing authorities for current performance of the work.
11. Initial progress report.
12. Initial settlement survey and damage report, if required.
13. Quality Control Plan.
14. Safety Plan.
15. MWBE participation listing.
16. Waste Management Plan.
17. List of emergency contact information.
18. Other documents as may be required in the Contract Documents.
H. Applications each Month During Construction:
1. Submit itemized application, in number of copies as specified herein, each with waivers of mechanics liens from principal subcontractors, sub-subcontractors and suppliers as specified below.
2. Applications shall be signed by a responsible officer of Contracting firm. Do not sign in black ink; no photocopies of signature permitted.
3. Application for Payment shall include the following, as applicable:
a. Application and Certificate for Payment on Contract.
1 April, 2013 012910-7
b. Invoice Cover Sheet.
c. Invoice Voucher.
d. Certificate for Material Stored on Project Site.
e. Invoices for materials stored off site, as applicable.
f. Updated Construction and Submittal Schedules: If substantial changes have occurred in the Project Construction Schedule, or if enough changes have occurred that the schedule is rendered inaccurate or ineffective, submit with Application for Payment a revised updated Construction Schedule for evaluation and measurement of actual work-in-place with said application for payment, together with updated submittal schedule. If the Contractor does not submit a revised schedule with a payment request it is agreed by the Contractor that the project is still on schedule according to the last submitted schedule.
1) In addition, should actual work completed be more than 14 days behind schedule, submit a recovery schedule per requirements of Section 013215, Construction Schedules, subparagraph 3.04 C. 4. b.
g. DBE participation and percentage for the specific application period. See Division 0.
4. When Government’s CO finds Application for Payment properly completed and correct, they will sign and transmit the Application for Payment to Government for processing.
5. If CO finds Application for Payment improperly or incorrectly executed, an annotated copy will be returned for a NEW SUBMITTAL.
6. Only minor corrections are allowed, with approval of Government’s CO.
I. If authorized by Government, the Application for Payment may include request for payment for material delivered to the Project site and suitably stored, or for completed preparatory work. Payment may similarly be requested for material stored off the Project site, provided Contractor complies with or furnishes satisfactory evidence of the following:
1. The material will be placed in a warehouse that is structurally sound, dry, lighted and suitable for the materials to be stored;
2. The warehouse is located within a 10-mile radius of the Project. Other locations may be utilized, if approved in writing by Government;
3. Only materials for the Project are stored within the warehouse (or a secure…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .