J2 Specification 800 series
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._002.pdf | ||
| J-3b_SCA_Wage_Determination_2005-2560_abbr.pdf | ||
| J-1_Road_List.pdf | ||
| Road_Maint_2013-2016__RFP.pdf | ||
| J-5_Fire_Plan.pdf | ||
| J-3a_SCA_Wage_Determination_1977-0209.pdf | ||
| J-4_DBA_Wage_Determination_WA130001_abbr.pdf | ||
| Amendment_No_001.pdf | ||
| J-2_Specifications_800_Series.pdf | ||
| J-5_Fire_Plan.pdf | ||
| J-3b_SCA_Wage_Determination_2005-2560_abbr.pdf | ||
| Road_Maint_2013-2016__RFP.pdf | ||
| J-1_Road_List.pdf | ||
| J-4_DBA_Wage_Determination_WA130001_abbr.pdf | ||
| J-3a_SCA_Wage_Determination_1977-0209.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
807 EQUIPMENT RENTAL
807.01
Service Required
Furnishing and operating equipment.
807.02
Performance Standard
Make equipment available for inspection and approval before use.
807.03
Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
807.04
Acceptable Quality Levels
A. Service Provider shall meet the requirements in H.9, Control of Noxious
Weeds – Cleaning of Equipment included in this contract.
B. Equipment shall be well maintained, free of leaks, capable of operating at least 90% of the time, and meet all state and federal regulations.
C. Equipment shall be operated by a fully trained, qualified, and competent operator at all times.
807.05
Measurement
A. The accepted quantities will be paid at the established hourly rate, rounded to the nearest half (1/2) hour, that the equipment is in operation.
B. Non-operable equipment or equipment dependent on another piece of non-operable equipment will not be paid for.
C. Hours of operation shall be the same as for the Service Provider’s regular work shift, unless otherwise directed in writing by the Contracting Officer.
D. Moving of equipment will be paid at the established hourly rate.
807.06
Payment
A. The accepted quantities will be paid at the contract price per unit of measurement for the
Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
PAY ITEM PAY UNIT
807(1) Equipment, Type Hour
807(2) Excavator Hour
807(3) Backhoe Hour
807(4) Grader Hour
807(5) Crawler Tractor Hour
807(6) Dump Truck Hour
807(9) Roller Hour
807(10) Trailer Hour
807(11) Laborer Hour
808 - WORK AREA MANAGEMENT (2/02)
808.01
Description
This Section establishes Contractor responsibilities for traffic control and equipment requirements in work areas.
808.02
Requirements
A. Traffic Conditions - Unless otherwise provided in the SUPPLEMENTAL
SPECIFICATIONS, roads other than those listed in the task order, are open to traffic with not more than fifteen (15) minutes maximum delay time.
B. A plan for satisfactory handling of traffic, approved by the Government, is required prior to initiating or performing work which interferes with use of traveled roadways.
C. Traffic Control Devices
1. Provide signs and other devices complying with National Standards as contained in Part VI of the Manual of Uniform Traffic Control Devices (MUTCD).
Provide traffic control for occupied work areas that is in accordance with these specifications. All signs and devices remain the property of the Contractor.
2. Keep traffic devices current with maintenance operation and remove upon completion.
3. Use warning signs to control traffic approaching the work area from either direction and also from side accesses having standard Government rectangular or trapezoidal-shaped route markers with horizontal numbering.
4. Required signs may be mounted on portable or temporary mountings. Use standard MUTCD shapes, colors, sizes, and legends.
5. Mark hazards incidental to the work within or on the traveled way, shoulders, or turnouts with hazard identification markers, illuminated beacons, and other MUTCD devices to safely guide road users through the area. Mark work segments not completed on a daily basis appropriately for night travel. Obtain authorization before commencing work at night.
6. Advisory speed plates may be used to control traffic through the work area.
D. Flaggers - Provide properly equipped, trained and certified, flag person(s) where the traffic is required to stop before proceeding. Stop traffic in locations which provide width enough for passage of traffic and reasonable protection for vehicles. When flag control is used, advance warning signs are required, meeting the current MUTCD.
E. Contractor's Equipment
1. Equip all vehicles and machinery operating on or from the traveled way or road shoulder with flashing lights, strobes, or rotary beacons operated continuously while work is in progress. Use truck headlights at all times while operating. Backup horns are required on all self-propelled equipment in excess of 5 metric tons (5½ tons) gross weight.
2. Park vehicles and machinery not currently used in the maintenance operation off the traveled way at approved locations to minimize interference with normal use.
808.03
Measurement and Payment
No separate measurement or payment will be made for meeting requirements of this
Section. All work and materials are incidental to paid work in this contract.
811 SURFACE MAINTENANCE
811.01
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips.
811.02
Performance Standards
Maintenance Level 4 and 5 Roads
A road surface is maintained to standard when the travel way is free of washboards, potholes, or other irregularities. The surface is smooth, compact, crowned or sloped to drain, without segregation of the surfacing materials. Suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently. Unpaved shoulders are shaped to provide a smooth transition from the paved surface and drain efficiently.
Maintenance Level 3 Roads
A road surface is maintained to standard when the surface is compact, crowned, or sloped to drain, without segregation of the surfacing materials. The road surface has no ruts or rills, suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.
Maintenance Level 2 Roads
A road surface is maintained to standard when the surface is shaped to drain, and where ditches and road surface drainage structures function efficiently. The road surface has no continuous ruts or rills, and no large concentrations of unsuitable materials remain.
811.03
811.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Single Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: Surface maintenance will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
811.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
811(4) Surface Maintenance Double Lane Mile (DLM)
811(5) Surface Maintenance Single Lane Mile (SLM)
811(7) Shoulder Maintenance Mile
811.06
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Surface Irregularities (Level 4&5)
Potholes greater than 2 inches deep and wider than 1 foot
Potholes 2 inches or less deep and
1 foot or less wide 10 per unit 10 per unit Rework if greater than 11 major defects
Rework if greater than 11 minor defects
Washboards greater than 1 inches deep
Washboards 1 inches or less deep and not exceeding 20 feet long
10 per unit 10 per unit Rework if greater than 1 major defects
Rework if greater than 0 11 minor defects
Surface Irregularities (Level 3)
Potholes greater than 2 inches deep and wider than 1 foot
Potholes 2 inches or less deep and 1 foot or less wide 10 per unit 10 per unit
Rework if greater than 11 major defects
Rework if greater than 11 minor defects
Washboards greater than 1 inches deep
Washboards less than 1 inches deep and not exceeding 20 feet long
10 per unit 10 per unit Rework if greater than 1 major defects
Rework if greater than 11 minor defects
Road Cross Section (Level 4&5)
Crown or Cross Slope is not U uniform and does not drain as specified on more than 250 feet of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250 feet of surface per mile
0 0 per unit Rework Rework if greater than 0 minor defects
Road Cross Section (Level 3)
Crown or Cross Slope is not uniform and does not drain as specified on more than 250 feet of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250 feet of surface per mile
0 0 per unit Rework Rework if greater than 0 minor defects
Road Cross Section (Level 2)
Road surface does not drain properly and causes erosion, or obstructs high clearance vehicles
Road surface does not drain properly, but does not cause erosion
0 50 feet per 1000 feet Rework if greater than 0 major defects
Rework if greater than 1 minor defect
Oversized Material (Level 3&4 aggregate surfaced
Material greater than 3 inches diameter remaining on the road surface
Material less than 3 inches diameter remaining on the road surface and traffic safety is not compromised
0 1 per 1000 feet
Re Rework if greater than 0 major defects
Rework if greater than 1 minor defect roads)
Oversized Material
(Level 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
0 0 per unit Rework Rework if greater than 0 minor defects
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by less than 10 % 0 50 feet per 1000 feet Rework
Rework if greater than 1 minor defect
A loss of more than 10 CY/mile
A loss of less than 10 CY/mile 0 1 per mile
Replace or recover lost material
Accept the loss of material surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised surfacing is segregated over less than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 N/A Rework Accept the loss of surface quality
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 10 feet per 1000 feet Repair and Stabilize Revegetate if greater than 1 minor defect
Compaction Visible displacement occurs under hauling or spreading equipment
N/A 0 N/A Rework N/A
Ditches and Road Drainage Structures
Impeded flow or water diverted out of drainage structures
< 20% impeded, but water will stay in the channel 0 20 feet per 1000 feet Rework Rework if greater than 1
Minor defect
Unpaved Shoulders (Level 3, 4, & 5)
Elevation difference between pavement and shoulder is greater than 1 inches
Elevation difference between pavement and shoulder is less than 1 inches
0 50 feet per 1000 feet Rework Rework if greater than 1 Minor defect
Material greater than ¼ inch diameter remaining on the road surface
Material ¼ inch diameter or less remaining on the road surface and traffic safety is not compromised
10 50 feet per 1000 feet Rework if greater than 0 major defects
Rework if greater than 1 Minor defect
Does not drain away from pavement
Does not drain away from pavement 0 0 Rework Rework
813 SPOT SURFACING
813.01
Load, haul, and place surface material to repair or stabilize road surfaces.
813.02
A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.
B. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto National Forest System land.
813.03
813.04
A. The quantity will be the number of cubic yards measured in the vehicles, or square yards of aggregate placed.
B. Material measured by the ton shall be verified by certified weight tickets.
813.05
The accepted quantities will be paid at the contract price per unit of measurement for the
Section 813 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
813(1) Spot Surfacing, Gradation _____ Cubic Yard
813(2) Spot Surfacing (Gov’t. furnished) Cubic Yard
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Depth of Aggregate
Dimension of spot surfacing deviates by more than 1 inch from depth specified. Or less than 1 inch from dimension specified but is consistently high or low.
Dimension of spot surfacing deviates by 1 inch or less than from depth specified and not consistently high or low.
0 N/A
If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount
Accept aggregate as placed, pay only for delivered quantities.
Width of Aggregate
Dimension of spot surfacing is less than specified width or more than 1 foot wider than specified.
Dimension of spot surfacing is up to 1 foot wider than specified but not consistently wide. 0 N/A
If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape.
Accept aggregate as placed, pay only for delivered quantities.
Length
Dimension of spot surfacing is shorter than specified length or more than 100 feet longer than specified.
Dimension of spot surfacing is shorter than specified length or up to 100 feet longer than specified.
0 N/A
If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount.
Accept aggregate as placed, pay only for delivered quantities.
Compaction
Visible displacement occurs under heady spreading equipment
N/A 0 N/A Rework N/A
Aggregate Quality
Does not meet specified gradation or durability requirements and is not suitable for intended use
Does not meet specified gradation or durability requirements and is suitable for intended use
0 N/A
Reject and replace Accept but reduce payment by 20%.
Finish Quality
Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded.
Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed.
20 feet per 1000 feet
Reshape or recompact surfacing as needed.
Reshape or recompact surfacing as needed.
814 ASPHALT SURFACE MAINTENANCE
814.01
Repair and cleaning of pavement surfaces.
814.02
This work is complete when the pavement is clean and free of cracks, potholes, and surface irregularities.
Follow industry standards as outlined in the Asphalt Institute Manual Series Number 16.
814.03
814.04
A. Single Lane Roads: The work activity will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
B. Double Lane Roads: The work activity will be measured along the centerline of the roadway. Measurement will be to the nearest one-tenth (0.1) mile.
C. Road Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
D. Ton: Material measured by the ton shall be verified by certified weight tickets.
E. Linear Foot: Work activity by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot.
814.05
Section 814 pay items listed in the schedule of items. Payment will be full compensation for the
814(1) Pothole Patching Ton
814(2) Asphalt Skin Patching Ton
814(3) Crack Sealing Linear Foot
814(5) Paved Surface Cleaning (Single Lane) Mile
814.05
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Pothole Patching
Finished elevation does not match adjoining segments by more than 1/4 inch
Finished elevation does not match adjoining segments by less than 1/4 inch
5 feet per 1000 feet Rework N/A
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared N/A 0 N/A Rework N/A
Skin Patching
Finished skin patch does not make smooth transition with adjoining pavement. N/A 0 N/A Rework N/A
Patched material does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be patched is not properly prepared N/A 0 N/A Rework N/A
Crack Sealing
Crack Sealant does not completely fill the cracks greater than 1/4 inch
Crack Sealant does not completely fill the cracks 1/4 inch or less
0 1 per unit Rework Accept
Crack sealant does not properly adhere to adjacent surfaces N/A 0 N/A Rework N/A
Area to be sealed is not properly prepared N/A 0 N/A Rework N/A
Surface Cleaning More than 5% of surface is not cleaned as specified
Less than 5% of surface is not cleaned as specified 0 4 per 100 feet Rework
Accept but reduce payment by 20%.
Asphalt Quality
Product and gradation does not meet Specifications and is not suitable for job.
Product and gradation does not meet Specifications but is otherwise suitable for job.
0 0 per unit Reject and replace
Reject and replace
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
832 LOAD, HAUL, AND PLACE MATERIALS
832.01
Load, haul, and place material at designated sites.
832.02
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning, stabilization, and revegetation as ordered by the Contracting Officer.
832.03
832.04
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
B. Mile: Work activity will be measured along the centerline of the road
832.05 the Section 832 pay items listed in the schedule of items. Payment will be full
832(1) Load, Haul, and Place Material Cubic Yard
832(2) Haul Materials Cubic Yard /mile
832.06
Defect Defect Major Minor Major Minor
Slopes
Unstable material left on slopes Material left on slopes that can be stabilized and won't block drainages 0
10 feet per 1000 feet
Remove
Remove or stabilize in place
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
5 feet per 1000 feet Repair and Stabilize
Revegetate if greater than 1 minor defects *
Ditches, inlet/outlet channels, streams and catch basins water will be diverted out of the drainage structure or soil enters system
< 20% impeded, but water will stay in the channel.
5 feet per 1000 feet Rework
Rework if greater than 1 minor defects *
Debris on Road (ML 4-5)
Any debris in traveled way Debris in traveled way that may slow or impede traffic.
0 1 per 5000 feet Rework
Rework if greater than 1 minor defects *
Debris on Road (ML 3)
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic.
0 1 per1000 feet Rework
Rework if greater than 1 minor defects *
Debris on Road (ML 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 0 Rework Rework
Placed Material (Disposal Sites)
Unstable material on designated sites.
N/A
0 N/A Stabilize
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
833 DRAINAGE STRUCTURE INSTALLATION OR REMOVAL (8/07)
833.01
Install or remove drainage structures including culverts, water-bars, drivable drain dips, and cross ditches.
833.02
Drainage structure installation is complete when culverts, water-bars, drivable drain dips and cross ditches have been installed to the lines and grades specified, and drainage structure removal is complete when designated culverts, water-bars and cross ditches have been removed and culverts have been properly disposed of.
833.03
833.04
A. Mile: Work activity will be measured along the centerline of the road
B. Linear Foot: Work activities by the linear foot will be measured using standard survey methods rounded to the nearest one (1) foot. Culvert bands are incidental to the installation.
833.05
Section 833 pay items listed in the schedule of items. Payment will be full compensation for the
Pay Item Description Pay Unit
833(1) Culvert replacement Contractor furnished Linear foot
833(2) Culvert Removal ( less than 100 cubic yards) Each
833(3) Water-bar Installation Each
833(7) Cross Ditch Installation Each
833.06
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Culvert size
Culvert is smaller than the designated diameter shown on the drawings.
Culvert is larger than the designated diameter shown on the drawings.
1 per 10 items
Remove culvert and replace with designated size
Accept if culvert fits the geometry of the road but pay at designated size otherwise replace
Culvert is shorter than the designated length shown on the drawings.
Culvert is longer than the designated length shown on the drawings.
0 0
Replace or add section to fit geometry of road.
Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length
Grade and alignment of culvert
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
1 per 10 items
Remove and replace culvert
Repair if greater than 1 minor defects
Sag or depression in road after placement of culvert and backfill material. Failure to compact.
Greater than 2 inch depression in traveled way.
Fill was not compacted with Whacker packer or equivalent.
2 inch or less depression in traveled way
1 per 10 items
Furnish, place and compact designated material to repair depression.
Repair if greater than 1 minor defects
Defect Defect Major Minor Major Minor
Removed culvert or pieces left on National Forest
System Lands
Culverts or pieces of culvert left on National Forest System
Lands N/A 0 N/A
Remove from National
Forest System Lands
Remove from National
Forest System Lands
Water-bars and cross ditches
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
1 per 1000 feet
Rework Rework if greater than 1 minor defect
Sedimentation
Operations cause or allow sediment to leave site.
N/A 0 N/A
Cease operations until sediment is controlled N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures 0 0
Suspend work until in compliance
Suspend work until in
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.
834 ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01
Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.
834.02
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning vehicles and equipment. The contractor will use wash stations approved by the
Contracting Officer.
834.03
As specified on roads listed on the road listing, shown on the plans, marked on the ground and/or ordered by the Contracting Officer and;
1. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area shown on the plans or in the supplemental specifications.
2. Culverts - a minimum external horizontal distance of 10 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
3. Ditches adjacent to the roadbed.
4. This work does not include bridges, cattleguards, drain dips, or water bars.
5. Do not operate in the weed infested areas marked on the ground unless ordered to do so by the Contracting Officer.
834.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
834.05
Section 834 pay items listed in the schedule of items. Payment will be full compensation for the
834(1) Clean and Recondition Culverts 24 inch Diameter and under Each
834(2) Clean and Recondition Culverts Over 24 inch through 48 inch Each
Diameter
834(3) Clean and Recondition Culverts Over 48 inch Diameter Each
834(4) Clean Ditches Mile
834(5) Clean Ditches and Drainage Structures Mile
Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Blocked Culverts Greater than 20 % of end area blocked
20% or less of end area blocked 0 1 per ea Rework
Rework if greater than 1 minor defect
Damaged Culvert Inlet/outlets Greater than 20 % of end area blocked
20% or less of end area blocked 0 1 per ea Rework
Rework if greater than 1 minor defect
Impeded flow for ditches, inlet/outlet channels, and catch basins water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel.
1 per 1000 feet Rework
Rework if greater than 1 minor defect
Debris on Road (ML 4-5) produced by Service Provider operations.
Any debris in traveled way N/A
0 N/A Rework N/A
Debris on Road (ML 3) produced by Service Provider operations.
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0 5 feet per
1000 feet Rework
Rework if greater than 1 minor defect
Debris on Road (ML 2) produced by Service Provider operations.
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
10 feet per
1000 feet Rework
Rework if greater than 1 minor defect
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by 10 % or less
50 feet per
1000 feet Rework
Rework if greater than 1 minor defect
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
10 feet per
1000 feet
Repair and
Stabilize
Revegetate if greater than 1 minor defect
Vegetation woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow low growing vegetation within 5 feet or more of inlet end of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures 0 0
Suspend work until in compliance
Suspend work until in
839F-1 SPRING RECURRENT MAINTENANCE OF ROADS
03/2006
839.01
Springtime opening of roads. Remove logs ( upper limit of 5 per mile), rocks and other material in the roadway. Clean minor obstructions (less than 3 cy) blocking water in ditchline and culverts. See the following specifications: 811 Surface Maintenance, Specification 832 Load, Haul, and Place Material, Specification 834 Roadway Drainage
Maintenance Item 834(5) only, and Specification 851F1 Hazard and Obstruction
Removal items 851(1), and (3).
839.02
See the following specifications: 811 Surface Maintenance, 832F1 Load, Haul, and
Place Material, 834 Roadway Drainage Maintenance, 851 Hazard and Obstruction
Removal.
Contractor will perform the routine reopening of ordered public safety act roads
(Maintenance Level 3 and 4),and arterial Level 2 roads on an annual basis, removing hazards and obstructions, cleaning culverts and blocked ditchlines. As roads become free of snow, or seasonal closures end, all roads will be maintained in a safe condition for public use. Work beyond what would be normal recurring seasonal work will be reported to the COR for evaluation and additional payment ( large slides, heavy blowdown and numerous snowbreak). If an unsafe condition remains, government supplied temporary signs and barricades will be installed by the Contractor.
839.03
A. As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer and;
See the following specifications: 811F1 Surface Maintenance, 832F1 Load, Haul, and
Place Material, 834 Roadway Drainage Maintenance, 851F1 Hazard and Obstruction
Removal.
839.04
Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
839.05
Section 839 pay items listed in the schedule of items. Payment will be full compensation for the
839(6) Spring Recurrent Maintenance of ML 3 and 4 Roads Without Surface Maintenance Mile
839(7) Spring Recurrent Maintenance of ML 2 Roads Without Surface Maintenance Mile
839.06
Acceptable Quality Levels and Performance Summary
See sections 811.06, 832.06, 834.06, and 851.06 for relevant work
841 VEGETATION TREATMENT
841.01
Apply vegetative treatments including seed, mulch, fertilizer or other products in designated areas.
841.02
Treatment is complete when ordered quantities of vegetative treatment products have been applied to designated or Service Provider disturbed soil areas.
836.03
836.04
B. Acres: Work activity will be measured to the nearest one-tenth (0.1) acre.
841.05 the Section 807 pay items listed in the schedule of items. Payment will be full
841(1) Establish Vegetation Acres
851 HAZARD AND OBSTRUCTION REMOVAL
851.01
Remove and/or stabilize hazards and obstructions.
851.02
Work is complete when hazards have been removed or stabilized and when the road is passable by the intended traffic.
851.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
851.04
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
851.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 807 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
851(1) Logging Out (ML 3-5) Each
851(2) Logging Out (ML 2) Each
851(4) Danger Tree Removal Each
851.04
Defect Defect Major Minor Major
Minor
Utilization of Timber
Log lengths do not meet utilization standards
(see SPS or Task Order) N/A 0 N/A
Charge for loss of stumpage N/A
Stump Heights
Exceed Specified Height by more than 4 inches
Exceed Specified
Height by up to
2 inches 2 per mile 2 2 per mile
Rework if greater than
2 major defects
Rework if greater than 2 minor defects
Tree damage caused Service
Provider's operations
Damage to more than
30% of the tree bole
Damage to 30% or less of the tree bole 1per mile 2 5 per mile Remove or Treat Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by
Service Provider's Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel. 0 5 NA Rework
Rework if greater than 1 minor defect
Marked Danger Trees and Snags
Any remaining snags or danger trees that were marked
Any remaining snags or danger trees that were not marked 0 2 NA Rework
Assess and Rework
Hazards that interfere with the use of the road
(rocks, logs, etc) (ML 3-5)
Unstable hazards that remain in the Clearing Limits
N/A 0 N/A Rework N/A
Hazards that interfere with the use of the road (rocks, logs, etc) (ML 2)
Unstable hazards that remain within 5 feet distance of the
Traveled way
0 N/A Rework N/A
Log Out
Horizontal clearance - more than
20% not cleared to specified distance
Horizontal clearance –
20% or less not cleared to specified distance
0 10 per mile Rework Rework
Vertical clearance -more than
20% not cleared to specified distance
Vertical clearance
- 20% or less not cleared to specified distance
0 0 0 per mile Rework
Rework
Defect Defect Major Minor Major
Minor
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 Suspend work until in compliance
861 MAINTENANCE of CATTLEGUARDS, TRAFFIC GATES and BARRIERS, GUARDRAILS, and RETAINING WALLS (8/07)
861.01
Maintain cattleguards, traffic gates and barriers, guardrails, retaining walls and appurtenances. Remove traffic gates and barriers.
861.02
A. Cattleguard maintenance is complete when: it is free of structural defects, the deck provides a smooth, stable, compact transition to the adjacent road surface, and presents no traffic or livestock hazards; the wings are functional and secured to the deck and post;
debris and other materials have been removed from the vault area to the full depth of the foundation over the entire width; and designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
B. Traffic gate maintenance is complete when it is free of structural defects, the gate and all associated posts are stable and the locking mechanism is in working order, the surfaces are free of oxidation and painted, and all designated signs are in compliance with
MUTCD and EM 7100-15 Standards for Forest Service Signs and Posters.
C. Guardrail maintenance is complete when it is free of structural defects, and all posts and rails are stable, secure, aligned, and in compliance with State Standards and “AASHTO
Roadside Design Guide”.
D. Guardrail barrier maintenance is complete when it is free of structural defects, all posts and rails are stable, secure and aligned, and all designated signs are in compliance with
E. Jersey barrier maintenance is complete when it is stable, aligned and all designated signs are in compliance with MUTCD and EM 7100-15 Standards for Forest Service Signs and
Posters.
F. Rock and earth barrier maintenance is complete when it is stable, aligned and at the dimensions SHOWN ON THE PLANS, and all designated signs are in compliance with
G. Retaining wall maintenance is complete when the wall is stable, aligned and repaired to the original lines and grades, and the materials used are equal to or exceed the original wall material.
H. Removal of gates and barriers is complete when they have been removed and disposed of as designated and the road is passable by the intended traffic.
861.03
861.04
Linear Foot: Work activities by the linear foot measured by using standard survey methods rounded to the nearest one (1) foot.
861.05 the Section 861 pay items listed in the schedule of items. Payment will be full
861(5) Maintain traffic gate Lump Sum
861(7) Maintain guardrail Lump Sum
861(8) Steel structure component and fastener replacement Lump Sum
861(12) Maintain retaining wall Lump sum
861(13) Remove gate Lump sum
861(15) Remove jersey barrier Lump sum
861(16) Remove rock/earth barrier Lump sum
861.06 Acceptable Quality
Levels
Metal Surfaces
Exposed metal, rust , or oxidation, greater than
25% of surface
Exposed metal, rust, or oxidation, 25% or less of surface
0 0 1 per unit Paint or Coat Repair if greater than 0 minor defects
Penetrated rust or oxidation that compromises structural integrity
Penetrated rust or oxidation that does not compromise structural integrity
00000 0 Replace component Paint or Coat and notify
Structural Integrity
Major cracks, broken, decomposed, or missing components and fasteners.
Minor cracks, loose components and fasteners.
0 0
Replace component and/or fasteners
Repair component and
/or fasteners
Alignment
Greater than 10% deviation from original lines and grades, or non-functional.
10% or less deviation from original lines and grades.
0 0 per unit Repair or replace
Repair if greater than
0 minor defects
Vaults/drainage
Greater than 50% of the vault is full or drainage is impeded.
50% or less of the vault is full and drainage is not impeded.
0 0 per unit Clean
Repair if greater than
0 minor defects
Signs/Markers Missing, non-functional or non-readable
Bent or damaged, but still functional and readable
0 0 per unit Repair or replace
Repair or replace if greater than 0 minor defects
Debris produced by
Service Provider operations.
Debris left on road or placed in drainage structures.
N/A 0 N/A Remove from road or drainage N/A
Removed materials or pieces left on
National Forest
Unserviceable posts, rails, or other materials left on
National Forest
N/A 0 N/A Remove from National
Forest N/A
Materials and
Methods
Does not conform to
AASHTO, ASTM, AWPA,
and MUTCD standards.
N/A 0 N/A Reject and replace N/A
861.06 Acceptable Quality
Levels
Work Area
Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 Suspend work until in
872 SIGN MAINTENANCE
872.01
Furnish posts and install, and maintain forest entrance, destination, route markers, traffic signs, etc.
Signs will be furnished by the government.
872.02
Sign Maintenance is complete when designated signs meet the quality standards of
EM 7100-15 Standards for Forest Service Signs and Posters, and Forest Service Sign
Installation Guide 6E62H99 – Sign Installation Field Guide. Both EM 7100-15 and
6E62H99 are available at http://www.fs.fed.us/database/acad/om/.
872.03
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
872.04
872.05
Section 872 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
http://www.fs.fed.us/database/acad/om/
872(3) Install or Replace Single Post and Sign Each
872(4) Install or Replace Double Post and Sign Each
881 MOBILIZATION / EQUIPMENT MOVING
881.01
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02
PERFORMANCE STANDARDS
A. Make equipment available for inspection before it is used on National Forest
System lands.
B. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
C. Equipment will be clean and weed free before it arrives on National Forest
System lands.
881.03
Location of Work:
881.04
Measurement:
A. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05
PAYMENT
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section. Mobilization is incidental unless ordered for a specific project at a specific time.
881(1) Mobilization Miles
890 IDENTIFICATION OF ROAD WORK
890.01
A .Identification of road damage, maintenance, and drainage repairs needed on roads identified by the Contracting Officer.
B. Minor removal of small trees less than 12’ diameter and less than 1 tree per 3 miles of USFS roads to access roads identified by the Contracting Officer.
890.02
Performance Standards
A. Identification is complete when 100% of the needed road repairs have been reported and documented on each identified road.
B. Removal of trees allows access to work sites.
890.03
Location of Work:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
890.04
Measurement:
Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of contractor to the days end point .
890.05
A. The accepted quantities will be paid at the contract price per unit of measurement for the Section 890 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
890 (1) Identification of Road Work Miles