J.3 Supplemental Specifications Doc
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment No 001.doc | DOC document | |
| SolicitationFinal.pdf | ||
| J.6_MOU-Jan2005.pdf | ||
| J.4_Wage_Determination.docx | DOCX document | |
| J.6_MOU_Addendum.pdf | ||
| J.7_GrayWolfTrailDrawings.pdf | ||
| J.5_Fire_Plan.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J.3
TRAIL CONSTRUCTION – SPECIAL SPECIFICATIONS
6/18/2008
SPECIAL PROJECT SPECIFICATIONS
900 F1
SECTION 900 – GENERAL SPECIFICATIONS
900 General Specifications
REPLACE Standard Specifications for Construction and Maintenance of Trails, EM-7720-103, 9/1996, with USDA Forest Service – Region 6, U.S. Customary Specifications for Construction and Maintenance of Trails, Pacific Northwest Region, 7/2005.
2/1/89
SPECIAL PROJECT SPECIFICATIONS
912.041
SECTION 912 - EXCAVATION AND EMBANKMENT
912.04 Trail way excavation and embankment.
ADD the following paragraph:
Construction stakes, ribbons and markers shall be removed from the ground and placed on the cut-slopes side of the tread above any excavation with stationing facing the tread.
2/1/89
SPECIAL PROJECT SPECIFICATION
912.051
SECTION 912 - EXCAVATION & EMBANKMENT
912.05 Trail bed width and finish.
ADD the following:
Holes left by rock, root, and stump removal shall be filled with rubble rock, and/or mineral soil, and compacted by tamping to provide a firm surface level with the finished trail bed.
6/94
SPECIAL PROJECT SPECIFICATION
926 F1
SECTION 926 - DITCHES
926.01 General. This work shall include constructing parallel ditches, lead-off ditches, wing ditches, and parallel ditches with side-poles as SHOWN ON THE DRAWINGS, FS-7700-105-R6. At locations staked on the ground and/or shown in the construction log.
926.02 Construction. All ditches shall be excavated to the dimensions SHOWN ON THE DRAWINGS. The finished ditches shall be free of rocks, roots, sticks, and other obstructing materials. Excavated material shall not be piled or diked along the ditches; it shall be used as directed by the COR for tread building, backfilling gullies, or scattered outside the clearing limits, not more than 100 mm deep.
926.03 Catch Basins. A catch basin shall be constructed at each Culvert. The catch basin shall be constructed AS SHOWN ON THE DRAWINGS and shall be excavated to fit the dimensions of each specific culvert or drainage structure.
926.04 Measurement. The quantity to be paid for will be measured in accordance with Section 906.
926.05 Basis. The accepted quantities will be paid for in accordance with Section 906 at the contract unit price for each pay item SHOWN IN THE SCHEDULE OF ITEMS. Unless shown in the SCHEDULE OF ITEMS, catch basins shall be considered incidental to ditch construction.
Payment shall be made under:
PAY ITEM
PAY UNIT
| 926(01) |
| Lead-Off Ditches |
| LF |
| 926(02) |
| Parallel Ditches |
| LF |
| 926(03) |
| Parallel Ditches with Side Poles |
| LF |
| 926(04) |
| Wing Ditches |
| LF |
| 926 (05) |
| Catch Basins |
| EA |
Supplement to REGION SIX FIRE PROTECTION AND SUPPRESSION Form R6-FS-6300-51 Clause 8. Fire tools: Delete in its entirety and add the following:
The contractor's normal working tools will be accepted as fire tools; provided there is a hand tool for each employee; tools are maintained (sharp, serviceable handles, etc.) to a fire tool standard; there is at least one shovel and one axe or pulaski for every two (2) employees; and that the tools are located within a 5 minute round trip of the current work site.
The contractor will in addition to the above be required to have full a 5 gallon backpack water pump can within a 5 minute round trip of the current work site.
ATTACHMENT 19
GENERAL CONSTRUCTION NOTES
1. The information contained in the construction log provides stationing and the description of each work item. Completion of work items shall be accomplished according to the drawings and specifications. As built stationing of work items indicated in the trail log may vary somewhat from the originally surveyed stationing. This is due to cumulative changes in distance created during trail construction through drainages, areas of rough topography, and minor changes in trail alignment and gradient.
2. Clearing and grubbing on the Gray Wolf Trail is considered very light and will be considered incidental to excavation. Clearing and Grubbing shall be done in accordance with Section 911 Clearing and Grubbing and no separate payment shall be made. Clearing and Grubbing on the Slab Camp Relocation will be separate from excavation.
3. Existing bedrock benches will be widened from a 2’ wide trail tread to a 4’ wide trail tread with clearance for pack stock. A combination of slough removal, retaining wall construction, and blasting can be used to achieve this. Removal of existing retaining walls shall be considered incidental to the construction of new retaining walls. All existing materials are native an may be scattered on site. Wind rows and piles of materials will not be allowed.
4. This project has been flagged with an “eye level” tag line. A constant grade shall be maintained between flags or stakes. The trail is typically flags and stakes typically follow the desired finished grade, some locations may be centerline staked. The finished grade of the trailbed shall not exceed 15%. Work items are flagged with pink flagging. Flagging is complete at this time. Construction staking is not complete at this time, however, will be completed prior to the start of work.
5. The Contractor will supply and transport all trail construction materials and supplies. Western Red Cedar needed for crib walls and waterbars is located throughout the project area. Logs may need to be transported to specific locations for construction. Stock may be used to transport logs and other construction materials and equipment.
6. The contractor may camp at the Slab Camp Bridge. The camp must be maintained in a neat and clean manor.
7. The contractor is responsible for security of the camp, construction equipment, and materials until final acceptance of work by the Contracting Officer.
8. All drainage dips are considered incidental to excavation.
9. This project is measured in Linear Feet.