RFQAG-04T1-14-0008.docx

DOCX document 181 KB Posted

Attached to
Micro-Invertebrate Sampling and Analysis Federal contract opportunity
Solicitation number
AG-04T1-S-14-0008
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

Solicitation AG-04T1-S-14-0008

View the file

Other files for this federal contract opportunity

Other files attached to Micro-Invertebrate Sampling and Analysis, newest first.
File Type Posted
MapLocator.pdf PDF
BenthicInvertebrateBioassessment.pdf PDF
SteamboatSampleSites.pdf PDF
DLSiteDescription.docx DOCX document
VicinityMap.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Commercial RFQ Current as of FAC 2005-74 AG-04T1-S-14-0008 Macro-Invertebrate Sampling and Analysis, Umpqua National Forest

Page 58 of 58
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

694869

PAGE 1 OF

2. CONTRACT NO.

3.AWARD/EFFECTIVE DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER

RFQ AG-04T1-S-14-0008

6. SOLICITATION ISSUE

DATE

June 17, 2014

7. FOR SOLICITATION INFORMATION CALL:
a. NAME

Lois Ford Contracting Officer

b. TELEPHONE NUMBER (No collect calls) 541-957-3344

8. OFFER DUE DATE/

LOCAL TIME

16:00 PST

July 10, 2014

9. ISSUED BY
CODE
10. THIS ACQUISITION IS |_| UNRESTRICTED |X| SET ASIDE 100 % FOR

USDA Forest Service Umpqua National Forest 2900 Stewart Parkway Roseburg, OR 97471

|X| SMALL BUSINESS |_| WOMAN –OWNED SMALL BUSINESS (WOSB)

|_| HUBZONE SMALL BUSINESS ELIGIBLE UNDER THE WOMEN OWNED SMALL

BUSINESS PROGRAM

|_| SERVICE DISABLE VETERAN- |_| EDWOSB-

VETERAN-OWNED SMALL

BUSINESS |_| 8(

NAICS Code 541620 Size Standard $14.0 million

11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED

|X| SEE SCHEDULE

12. DISCOUNT TERMS

|_| 13A. THIS CONTRACT IS RATED ORDER UNDER DPAS (15 CFR 700
13B. RATING

14. METHOD OF SOLICATION

|X| RFQ |_| IFB |_| RFP

15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE

See Block 9

17a. CONTRACTOR/ OFFERER

TELEPHONE NO. DUNS #____________________

FAX NO. TIN #_____________________

E-Mail Address: ________________________ 18a. PAYMENT WILL BE MADE BY

USDA, OCFO, COD, APB

PO Box 60075 New Orleans, LA 70160

|_| 17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN OFFER

18b. SUMBIT INVOICES TO ADDRESS SHOWN IN BLOCK 18A UNLESS BLOCK BELOW IS CHECKED |_| SEE ADDENDUM

19.

ITEM NO

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Macro-Invertebrate Sampling and Analysis Umpqua National Forest

See Section B – Schedule of Items to insert your prices.

25. ACCOUNTING AND APPROPRIATION DATA

JOB CODE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

|X| 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5. |X| ARE |_| ARE NOT ATTACHED.

|_| 27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA |_| ARE |_| ARE NOT ATTACHED

|_| 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ONE

COPY TO ISSUING OFFICE, CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN |_| 29. AWARD OF CONTRACT: REFERENCE RFQ AG-05G1-S-12-00XX OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN , IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (Signature Of Contracting Officer)

30b. NAME AND TITLE OF SIGNER (Type or Print)

30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or Print)

Lois I. Ford 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (Rev. 2/2012) Prescribed by GSA-FAR (48CFR 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Macro-Invertebrate Sampling and Analysis 10 sites Umpqua National Forest

This solicitation is Set Aside for Small Businesses

Quoters are requested to place their offers on the Schedule of Items in Section B.

Return to the address in block 9. On your sealed envelope, please write RFQ AG-04T1-S-14-0008, Macro-Invertebrate Sampling and Analysis. Quotes are due July 10, 2014. Quotes may also be faxed to 541-957-3223 Attn: Lois Ford

NOTE: Offerors MUST register in the System for Awards Management (SAM.gov) data base.

Resulting contract will be a Firm-Fixed Price Type Contract

Quotations submitted are considered to be confidential. The name of the Contractor and the amount of the contract will be disclosed only after an award is made.

32a. QUANTITY IN COLUMN 21 HAS BEEN

|_| RECEIVED |_| INSPECTED |_| ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER
35. AMOUNT VERIFIED

CORRECTFOR

36. PAYMENT

|_| COMPLETE |_| PARTIAL

|_| FINAL

37. CHECK NUMBER

|_| PARTIAL

|_| FINAL

38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER

FOR PAYMENT

42a. RECEIVED BY (Print)

41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41 c. DATE

42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD)
42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.2/2012) BACK

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Macro-invertebrate Sampling and Analysis Umpqua National Forest

Item
Description
Est Qty
Unit
Price
Amount
1a
BASE YEAR - Award - 2014

Site Sampling

EA

1b

Sample and Data Analysis

EA

1c

Final Report due by June 30, 2015

EA

Total for lines 1a – 1c

TOTAL
$__________

2a Option YEAR 1 August 15, 2015– October 30, 2015

2b

2c

Final Report due by June 30, 2016

Total for lines 2a – 2c (option year 1)

TOTAL

3a Option YEAR 2 August 15, 2016– October 30, 2016

3b

EA

3c

Final Report due by June 30, 2017

Total for lines 3a – 3c (option year 2)

TOTAL

4a Option YEAR 3 August 15, 2017– October 30, 2017

4b

EA

4c

Final Report due by June 30, 2018

Total for lines 4a – 4c (option year 3)

TOTAL

5a Option YEAR 4 August 15, 2018– October 30, 2018

5b
Sample and Data Analysis

5c

Final Report due by June 30, 2019

Total for lines 5a – 5c (option year 4)

TOTAL

PERFORMANCE TIME: Estimated to be: August through October of each year.

Estimated Start work date is August 1, 2014

Contract time is: Base year and 4 (four) Option years

CONTRACT PERIOD:

Base Year – Award Date thru 10/30/2014 Option Year 1 – 8/01/2015 thru 10/30/2015 Option Year 2 – 8/01/2016 thru 10/30/2016 Option Year 3 – 8/01/2017 thru 10/30/2017 Option Year 4 – 8/01/2018 thru 10/30/2018

The contract period for the Base year is from award to 10/30/2014. There are four option years that, if exercised, will have a performance period of one year each. The government will give 60 days notice prior to exercising options. However, notice of intent does not obligate the government to exercise option years. See 52.217-9 - Option to Extend the Term of the Contract.

NOTE: Contractor must maintain an active registration in the System Award Management (SAM) database at www.sam.gov. Quoters shall complete Section E, including the Questionnaire to receive full consideration for award – See 52.212-1, Instructions to Offerors - Commercial Items and 52.212-2 Evaluation - Commercial Items item C for complete package list.

This solicitation is set aside for Small Businesses.

NEW --- Invoice Processing Platform

NEW ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

DUNS NUMBER: ____________________________________________

EMAIL ADDRESS: _____________________________________________________________

SECTION C - CONTRACT CLAUSES

Block 27 of SF1449: The full text of a clause or provision may be accessed electronically at www.arnet.gov/far.

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (SEPT 2013)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g.,use of the Government wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g.,52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall –

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the -

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidations errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest. (i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in Section 611 of the Contract Disputes Act of 1978 (Public Law 95-563), which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final Decisions. The Contracting Officer will issue a final decision as required by 33.211 if-

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence of amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer with the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(iv) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on -

(A) The date of which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge mad under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. 3701, et seq., Contract Work Hours and Safety Standards Act; 41 U.S.C. 51-58, Anti-Kickback Act of 1986; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. 423 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, and Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) Central Contractor Registration (CCR).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2)(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the internet at https://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.

(u) Unauthorized Obligations

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS) or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any loss of liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the follow shall govern.

1. Any Such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g, “click-wrap” or “browse-wrap agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken form the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

ADDENDUM TO FAR 52.212-4

AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)

(a) The contracting officer or the contracting officer's duly authorized representative may accompany the contractor to any of the collection sites at any time to determine if the contractor is complying with the set sampling procedures.

(b) The COR will review final report for completion and accuracy prior to acceptance.

NEW --- Invoice Processing Platform NOTE: The paragraph below replaces the paper invoice copies requirement referenced on FAR 52.212-4 (g) invoices.

The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). The contractor must follow the instructions on how to register and submit invoices via IPP as prescribed in the previous communications from USDA and Treasury. All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm. Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.211-18Variation of Estimated Quantity (APR 1984)
52.223-5Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an
individual)
52.232-11Extras (APR 1984)
52.237-2Protection of Government Buildings, Equipment, and Vegetation (APR 1984)
52.244-6Subcontracts for Commercial Items (DEC 2013)
52.253-1Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72Use of Premises (NOV 1996)
452.237-70Loss, Damage, Destruction or Repair (FEB 1988)

FAR 52.232-99 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS (DEVIATION) (AUG 2012)

This clause implements the temporary policy provided by OMB Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors, dated July 11, 2012.

(a) Upon receipt of accelerated payments from the Government, the contractor is required to make accelerated payments to small business subcontractors to the maximum extent practicable after receipt of a proper invoice and all proper documentation from the small business subcontractor.

(b) Include the substance of this clause, including this paragraph (b), in all subcontracts with small business concerns.

(c) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified) to perform the Performance Statement of Work, Investigation plan and Quality Assurance Surveillance Plan referenced in the attachments.

AGAR 452.211-75 EFFECTIVE PERIOD OF CONTRACT (FEB 1988)

The effective period of this contract is Base Year is from award through October 30, 2014, with 4 (four) Option Years..

Each subsequent option year, if exercised, will have a Contract time of one year.

Base Year – Award Date thru 10/30/2014 Option Year 1 – 8/01/2015 thru 10/30/2015 Option Year 2 – 8/01/2016 thru 10/30/2016 Option Year 3 – 8/01/2017 thru 10/30/2017 Option Year 4 – 8/01/2018 thru 10/30/2018

FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 3 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the work as specified in complete the entire work as prescribed in the statement of work.. The time stated for completion shall include final cleanup of the premises

FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within within 15 days of end of performance for any year.

FAR 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 10 days ; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

NOTICE TO PROCEED

A Notice to Proceed will be issued in writing by the Contracting Officer or Contracting Officer's Representative (COR). No work shall begin until receipt of this notice. Contract time shall commence on the day indicated on the Notice to Proceed.

AGAR 42.215-73 POST AWARD CONFERENCE (NOV 1996)

(a) A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at: Umpqua National Forest Supervisors Office, 2900 SW Parkway, Roseburg, OR unless otherwise changed by mutual agreement.

Note: The Contractor designated representative or foreman (whomever the Contractor will have on the site) shall be present at the prework conference.

GOVERNMENT-FURNISHED PROPERTY

Maps showing the locations of the sampling sites will be provided. The Government will provide a list of sensitive aquatic invertebrates, if available. The Government will provide the most recent macro-invertebrate data from the sample sites, as available.

CONTRACTOR’S OBLIGATIONS

The contractor will furnish all equipment, supplies, materials, labor, tools, supervision and transportation (except that listed as Government furnished) required to complete the project.

DEFINITIONS - ADMINISTRATION TERMS

A. Contracting Officer (CO) - The person executing this contract on behalf of the Government, including any duly appointed successor and authorized representatives of the Contracting Officer acting within the limits of his/her authority.

B. Contracting Officer's Representative (COR) - The on-site contract administrator for the Contracting Officer. The duties and responsibilities of the COR are defined a letter (form) of designation issued by the Contracting Officer.

C. Inspector - The person(s) appointed in writing by the COR to conduct and document inspections according to contract specifications and provisions. The inspector's authorities are strictly limited, not to exceed the authority to issue to the contractor a Notice of Noncompliance.

D. Calendar Days - Every day shown on the calendar, Saturdays, Sundays and holidays included.

E. Notice of Noncompliance - A written notice from the CO or COR which documents, for the Contractor's attention, specific performance deficiencies.

F. Contract Item - A pay item designated on the bid schedule and described by a specification.

G. Labor Standards Provisions - Those statutory and regulatory requirements pertaining to the Contractor's employees and employment practices.

H. Specifications - That portion of the contract comprising a description of the general and technical requirements for materials, products or services to be furnished under the contract.

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE (COR)

A. The Contracting Officer will designate an individual as Contracting Officer's Representative (COR) at time of award.

B. The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by a proper contractual documents executed by the Contracting Officer prior to completion of the contract.

C. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

D. On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

E. The COR's major duties and responsibilities are contained in the Forest Service Handbook of Contract Administration. The COR is delegated full authority under this contract except for the following actions which are reserved for the Contracting Officer:

1.Approve Change Orders and Modifications
2.Take action to terminate the contract for default or Government convenience.
3.Make contract adjustments under the Differing Site Conditions clause.
4.Grant extensions of contract time.
5.Approve assignment of claims.
6.Make final decisions under the Disputes clause.
7.Make final acceptance under the contract.
8.Make final decisions under the Suspension of Work clause.
9.Make equitable adjustments.
10.Authorize change in amount of Payment Retention.
11.Approve subcontractors.
12.Approve payments with deductions or final payment.
13.Approve use and possession prior to completion.
14.Enforce the warranty provisions.

NOTIFICATION OF SUBCONTRACTING

The Contractor shall promptly notify the Contracting Officer upon entering into any subcontract arrangement. The subcontractor shall have the experience and be equipped for such work. The written notification shall include as a minimum:

A. The name, address and telephone number of the subcontractor.

B. The date upon which the subcontract was entered into and its duration.

C. A detailed description of the work being subcontracted including a listing of contract items, units, etc., as appropriate.

D. Documentation of the subcontractor's representative authority.

Subcontracting any portion of the contract shall not relieve the Prime Contractor of any responsibility under this contract. Any subcontract agreement shall contain all terms and conditions of the prime contract.

PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTION OR TAX DELINQUENT STATUS FOR CORPORATE APPLICANTS (FEB 2012) ALTERNATE I (FEB 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

SAFETY PLAN

Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The Contractor shall include any safety training he/she provides to his/her employees.

CONTRACTOR'S REPRESENTATIVE

The Government may, at its option, suspend work with full count of contract time continuing, if the Contractor fails to provide a Contractor's Representative (1) conversant in the English language and (2) able to read and understand the contract.

SCHEDULES FOR SERVICE CONTRACTS

The Contractor shall provide a proposed work schedule in their responses to provision 52.212-2 Evaluation – Commercial Items to insure completion of the work within the time set forth in the contract. If the Contractor's progress falls behind that scheduled, the Contractor shall take such action as necessary to improve progress; in addition the Contracting Officer may require the Contractor to submit a revised schedule and proposed plan of work to ensure completion of the work within the time(s) set forth in the contract.

PROSECUTION OF WORK

(a) Work shall be scheduled to provide completion of segments on a daily basis unless otherwise herein provided. Refer to the Schedule of items for seasonal restrictions that will dictate the priority of units to be completed first.

(b) A Work Schedule shall be prepared by the Contractor based on priorities provided in the contract unless superseded by the Contracting Officer in advance of work.

(c) The Contracting Officer may require the Contractor to finish the portion in progress before additional work is started on any additional portion.

(d) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel and equipment during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site.

(e) The Contracting Officer may, in writing, require the Contractor to remove from the work any employee found to be working in an unsafe manner

PROPERTY AND PERSONAL DAMAGE

(a) The Contractor shall use every precaution necessary to prevent damage to public and private property. Land monuments and property markers shall not be disturbed until the Contracting Officer, or his/her representative, has witnessed or otherwise referenced their location and directed their removal.

(b) The Contractor shall be responsible for all damage to property and to persons, including third parties, that occur as a result of his/her agent's or employee's fault or negligence. The term "third parties" is construed to include employees of the government.

TRASH AND REFUSE MATERIAL

Contractor shall remove all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to: used engine oil, oil filters, oil cans, grease cartridges, camp refuse such as tin cans, paper garbage, etc. All placement of sanitary facilities will require prior approval of the Contracting Officer.

LANDSCAPE PRESERVATION

The Contractor shall give attention to the effect of contract operation upon the landscape, shall take care to maintain natural surroundings undamaged. The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawns, or other nature features or any other improvements in the work area unless specifically authorized by the Contracting Officer. Unless otherwise provided herein, the Contractor shall confine contract operations to within the areas designated in contract documents.

INDUSTRIAL CAMPS AND SANITATION

Forest Service regulations for use of campgrounds prohibit occupancy of developed recreation sites for other than primarily recreation purposes. No industrial camping will be authorized at these sites.

A special use permit is required on National Forest land for industrial camps. Such permits are to be obtained by the Contractor through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor, but may include use restrictions. One self-contained camp unit will be allowed at each staging area and equipment or supply dump for use by a watchman.

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)

At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.

END OF ADDENDUM TO 52.212-4

FAR 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS-COMMERCIAL ITEMS (JAN 2014)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

__ Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest after Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer must check as appropriate.]

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEPT 2006) with Alternate I (OCT 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUNE 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).

__ (5) 52.204-11, American Recovery and Reinvestment Act – Reporting Requirements (JUL 2010) (Pub. L. 111-5).

__ (6) 52.204-14 Service Contract Reporting Requirements (Jan 2014) (Pub. L 111-117, section 743 of Div. C)

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L 111-117, section 743 of Div. C)

_X (8) 52.209-6, Protecting the Government’s, Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note.)

__ (9) 52.209-9, Updates of Publicity Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2113).

___ (10) 52.209-10 , Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of Pub L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L, 111-8, and section 745 of Division D of Pub. L. 110-161).

__ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

__ (13) [Reserved.]

__ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (NOV 2011)

__ (iii) Alternate II (NOV 2011)

__ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (OCT 1995) of 52.219-7

__ (iii) Alternate II (MAR 2004) of 52.219-7

_ (16) 52.219-8, Utilization of Small Business Concerns (JUL 2013) [15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUL 2013) (15 U.S.C. 637(d)(4).

__ (ii) Alternate I (OCT 2001) of 52.219-9.

__ (iii) Alternate II (OCT 2001) of 52.219-9.

__ (iv) Alternate III (JUL 2010) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C 644(r)).

__ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) ) (15 U.S.C. 637(a)(14).

__ (20) 52.219-16, Liquidated Damages – Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Participation Concerns (OCT 2008) (U.S.C. 2323) (if the Offeror elects to waive the adjustment, it shall so indicate in tis offer).

__ (ii) Alternate I (JUNE 2003) of 52.219-23.

__ (22) 52.219-25, Small Disadvantaged Business Participation Program-Disadvantaged Status and Reporting (JUL 2013) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

__ (23) 52.219-26, Small Disadvantaged Business Participation Program-Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

___ (24) 52.219-27 Notice of Service-Disabled Veteran-owned Small Business (NOV 2011) (15 U.S.C. 657(f)).

__ (25) 52.219-28, Post Award Small Business Program Representation (JUL 2013) (15 U.S.C. 632(a)(2)).

__ (26) 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (JUL 2013 (15 U.S.C 637 (m)).

__ (27) 52.219-30 Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (JUL 2013 (15 U.S.C 637 (m)).

__X (28) 52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).

__ (29) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2014) (E.O. 13126).

_X (30) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).

_X_ (31) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246)

__ _ (32) 52.222-35, Equal Opportunity for Veterans (SEPT 2010) (38 U.S.C. 4212).

____ (33) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793)

____ (34) 52.222-37, Employment Reports on Veterans (SEPT 2010) (38 U.S.C. 4212).

_X (35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

___ (36) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

(ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (38) 52.223-15, Energy Efficiency in Energy- Consuming Products (DEC 2007) (42 U.S.C. 8259b).

__ (39)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423).

__ (ii) Alternate I (DEC 2007) of 52.223-16.

_X_ (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .