AG04T1S120022.pdf
PDF 2 MB Posted
- Attached to
- Thielsen Forest Camp Improvements Federal contract opportunity
- Solicitation number
- AG-04T1-S-12-0022
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-04T1-S-12-0022
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
09/05/2012 605496
1 64
2900 NW STEWART PKWY
ROSEBURG OR 97470
UMPQUA NATIONAL FOREST
300 Days After Notice to Proceed
UMPQUA NATIONAL FOREST
2900 NW STEWART PKWY
ROSEBURG
OR 97470
541 225-6326SHEILA FINNEY
09/17/2012 1600 PT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
FAX OR MAIL QUOTES TO
WILLAMETTE NATIONAL FOREST
ATTN: CONTRACTING
3106 PIERCE PARKWAY, SUITE D
SPRINGFIELD, OR 97477
FAX: 541-225-6220
EMAIL QUOTATIONS WILL NOT BE ACCEPTED.
The Government estimate is between $25,000 and $100,000.
Continued ...
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
Thielsen Forest Camp Improvements Umpqua National Forest
Douglas County
B-1 SCHEDULE OF ITEMS:
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
01200
Mobilization
Lump Sum
All
02870
Log Sign Structures
Each
02872
Log Picnic Tables
04860
Stone Fire Stove
GRAND TOTAL $ __________________
DUNS #:_____________________________________ TIN#:__________________________
Facsimile quotes may be submitted to 541-225-6220.
Email quotations will not be accepted.
The quoter must quote on all items. Quotes for less than the toal items will not be considered.
If quoter does not intend to charge for a bid item, a price of ‘0’ or ‘NO COST' should be shown.
If the price is left blank or shown as ‘No Bid', the entire bid may be considered Non-Responsive.
For technical questions, contact Peggy Roberts at 541-957-3432 or by email proberts@fs.fed.us.
The estimated start work date is October 1, 2012. All work shall be completed within 300 calendar days after the effective date of the Notice to Proceed. Contractor shall be required to start work within 10 days after the effective date of the Notice to Proceed.
Where extended unit prices do not agree with totals or subtotals shown by quoter, the unit prices shall govern except as provided under FAR 14.406, Mistakes in Bids.
AG04T1S120022
Thielsen Forest Camp Improvements
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
Furnish and construct Stone Fire Stoves, Log Picnic Tables and Log Sign Structures for Thielsen Forest Camp.
This project has been identified as a rustic dispersed campsite and is to be reconstructed to the 1930’s CCC era.
Picnic tables and sign structures are to be constructed from hand peeled, seasoned logs.
(End of Clause)
C-2 PROJECT LOCATION
This project is located on the Diamond Lake Ranger District on the Umpqua National Forest, Township 26 South, Range 6 East, Section 31; near Lemolo Lake Junction, OR. From Roseburg take exit 124 off Interstate I-5, take Highway 138 East (North Umpqua Highway), continue for approximately 73 miles and turn left into Thielsen Forest Camp.
C-3 APPLICABLE SPECIFICATIONS
The specifications shown in the specification listing contained in the attachments are applicable to this contract.
All specifications not included in the specification listing but referenced by listed specifications, are applicable.
The specifications shown on the specification list are physically attached.
C-4 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB
1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
AG04T1S120022
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-12 Inspection of Construction (AUG 1996)
E-2 AGAR 452.246-70 INSPECTION AND ACCEPTANCE (FEB 1988)
(a) The Contracting Officer (CO) or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.
(b) Inspection and acceptance will be performed at the project site.
(End of clause)
E-3 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions and material requirements shown on the drawings, indicated in the specifications or designated on the ground. "Reasonably close conformity" is in compliance with reasonable and customary manufacturing and construction tolerances.
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
52.242-14 Suspension of Work (APR 1984)
F-2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 300 days from the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
F-3 SUSPENSIONS OF WORK FOR OTHER THAN GOVERNMENT'S CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of: (1) weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project, or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, rutting of project roads which causes otherwise suitable soils to be muddy or unsuitable; or (2) failure of the Contractor to comply with specifications such as but not limited to placement of frozen material in fills, placing of asphalts at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements, or when conditions exist which do not meet safety requirements.
Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the Government. Such suspensions shall not be considered as suspensions for the Convenience of the Government under FAR 52.242- 14, Suspension of Work, and shall not qualify for an equitable adjustment.
SECTION G--CONTRACT ADMINISTRATION DATA
G-1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G-2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 10 days after the date of contract award. The conference will be held at Diamond Lake Ranger Station or Supervisory Office.
G-3 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
PROPERTY/FACILITIES/SERVICES
AVAILABILITY
LOCATION
AVAILABILITY
TIME
1 inch minus for log post hole backfill and base for concrete slabs.
Mill Site (Lemolo Junction) T.27S, R5E, Sec. 1 At Notice to Proceed
(1) Interpretive Panel for Thielsen Forest Camp site Forest Service Warehouse Roseburg, Or.
Provide 30 days prior notice to CO
Stones for fire stove construction, sorting & hauling required by contractor.
Kelsey-Calumet Quarry T25S, R6E, Sec.33 FS road 2610-700
At notice to proceed
SS Flex Pipes and iron cooking plate Diamond Lake R.D. Provide 30 days prior notice to CO
Temporary staging for materials & equipment Thielsen Forest Camp Duration of construction
Industrial camp sites (no utilities available) Briggs Camp FS Road 4785, mile post 62, T.27S, R4E, Sec. 1
Duration of construction
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 INDUSTRIAL CAMPS
Forest Service regulations for Use of Campgrounds prohibit occupancy of developed recreation sites for other than primarily recreation purposes. No industrial camping will be authorized at these sites.
A special use permit is required on National Forest land for industrial camps. These permits are to be obtained by the Contractor through the Contracting Officer. Such permission, if granted, will be without charge to the Contractor but may include use restrictions.
One self-contained camp unit will be allowed at each staging area for use by a watchman.
H-2 SALVAGE RIGHTS
No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
H-3 LANDSCAPE PRESERVATION
(a) The Contractor shall not remove, deface, injure, or destroy trees, shrubs, lawn, or natural features not designated for treatment. The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states. If a spill of petroleum product should occur in water, the Contractor shall take immediate action to clean up or contain the spill, then immediately notify the Engineer and the Oregon Emergency Response System (OERS), telephone 1-800-452- 0311 or 1-503-378-4124, and then immediately notify the Contracting Officer.
Contractor shall have a SPILL RESPONSE KIT on the project whenever equipment is operating. The spill kit shall be sufficient to absorb 34 gallons of oil, designed to float on the surface, while absorbing oil and repelling water. The KIT shall meet or exceed the physical properties of “New Pig Products Spill Kit #408”.
Oil absorbing mats are required under all stationary equipment, or equipment being serviced within the Forest Boundary to prevent leaking or spilled petroleum base products from contaminating soil and water resources.
Such material will be furnished by Contactor and approved by Contracting Officer.
Servicing of all equipment shall be done only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Equipment shall be furnished on a fully operational basis, of modern design and in good operating condition with no fuel or oil leaks. Repairs and move-in/move-out are the Contractor’s responsibility. All equipment shall be power washed and shall be clean prior to entering Forest Service Land.
(c) No objectionable material shall be allowed to enter any stream, river, lake, or other body of water. Material which falls in these areas shall be retrieved and disposed of, or incorporated in the work as directed by the Contracting Officer, and damage to vegetation or structures outside the project limits shall be repaired as directed by the Contracting Officer.
(d) The Contractor shall not operate equipment or otherwise disturb the natural vegetation and soil beyond the areas flagged on the ground or beyond two feet from edge of walkways, top of cuts, or toe of fills.
(e) The Contractor will make every reasonable attempt to preserve the scenic and natural environment along this construction project.
H-4 PRODUCT SUBSTITUTION
Any modification of items, designs, materials, products or equipment (including Government-Furnished property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
H-5 SANITATION REQUIREMENTS
Unless substitute measures or equipment are authorized in writing by the Contracting Officer, protection of air and water quality will include the use of approved chemical toilets by all persons engaged in road construction or in removing timber under this contract while they are within the boundaries of the Forest. Such facilities shall be furnished by Contractor in quantities and at locations approved by the Engineer. No habitation or overnight dwelling by employees of Contractor will be permitted on National Forest land without advance written approval from the Contracting Officer.
H-6 FINAL CLEANUP
Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to camp refuse such as tin cans, aluminum foil, glass, paper, garbage, used engine oil, oil filters, oil cans, grease cartridges, etc. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off National Forest Land and in accordance with State and Local disposal requirements.
H-7 PROTECTION OF CULTURAL RESOURCES
Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (PL 96-95 and 36 CFR 261.9(e)) shall be identified on the ground by Forest Service. Forest Service may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object which is or may be entitled to protection under these Acts regardless of when the area, object or artifact is discovered or identified. Discovery of such areas or objects by either party shall be promptly reported to the other party.
Contractor shall protect all known and identified historic or prehistoric sites, buildings, objects and properties related to American history, architecture, archaeology and culture against destruction, obliteration, removal or damage during Contractor's Operations. In accordance with 36 CFR 296.14(c), Contractor shall bear costs of restoration, provided that such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.
Wheeled or track-laying equipment shall not be operated within such areas except on roads. Unless agreed otherwise, trees will not be felled into such areas.
H-8 PROTECTION OF HABITAT OF ENDANGERED, THREATENED, AND SENSITIVE
SPECIES
Location of areas needing special measures for protection of plants or animals listed as threatened or endangered under the Endangered Species Act of l973, as amended, or as sensitive by the Regional Forester under authority of FSM 2670, are shown on the Plans and identified on the ground. Measures needed to protect such areas have been included elsewhere in this contract or are as follows:
NONE.
If protection measures prove inadequate, if other such areas are discovered, or if new species are listed as Federally threatened or endangered or as sensitive by the Regional Forester, Forest Service may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known.
Discovery of such areas by either party shall be promptly reported to the other party.
H-9 SPECIAL EQUIPMENT CLEANING REQUIREMENTS
All earth moving equipment (loaders, excavators, dump trucks, etc.) moved to the job site shall be cleaned of weeds and their seeds prior to each entrance onto the National Forest lands. Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose.
Equipment shall be made available for visual inspection by the Forest Service prior to entering Forest Service lands. The Contractor shall advise of a proposed date for mobilization. Inspections will take place at mutually agreeable en-route locations in advance of entry onto National Forest lands.
Special care shall be taken to assure removal of the following noxious weeds and their seeds:
spotted knapweed (Centaurea maculosa) diffuse knapweed (C. diffusa) yellow starthistle (C. solstitialis) gorse (Ulex europaeus) rush skeletonweed (Chondrilla juncea) tansy ragwort (Senecio jecobaea) purple loosestrife (Lythrum salicaria) distaff thistle (Carthamus lanatus) scotch broom (Cytisus scoparius)
The Contractor shall take special care under this contract to prevent contamination of water at the work sites with any petroleum residues from mechanical equipment operations. This shall include daily inspection and cleaning as appropriate.
H-10 SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of Contractor, subcontractor, supplier, and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
H-11 PRODUCT SAMPLES AND/OR SUBMITTALS
The following product samples and/or submittals are required for this project:
Title Referenced by Contract clause or Specification No.
Time of Government Approval After Submittal
Engineered Spill Prevention Plan Landscape Preservation and Hazardous Materials clause in section H
7 days
Fire Plan R6-FS-6300-55 and Certification that your Fire Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 in Section J
N/A
Proposed Progress Schedule Schedules For Construction Contracts [FAR 52.236-15]
N/A
Product and Material Certifications and Literature As required by Specifications 10 days
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/ www.usda.gov/procurement/policy/agar.html
52.204-7 Central Contractor Registration (AUG 2012) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (AUG 2012) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (DEC 2010) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.215-8 Order Of Precedence – Uniform Contract Format (Oct 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Representation (APR 2012) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (JUN 2010) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) 52.222-50 Combating Trafficking in Persons (FEB 2009) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (JUL
2012) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (JAN 2012) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-23 Assignment of Claims (JAN 1986)
AG04T1S120022
Thielsen Forest Camp Improvements
52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-17 Layout of Work (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (DEC 2010) 52.245-1 Government Property (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
I-2 FAR 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS (SEPT 2010)
(a) Definitions. As used in this clause— “Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
AG04T1S120022
Thielsen Forest Camp Improvements
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
_________None______________________________ [Contracting Officer to list applicable excepted materials or indicate “none”]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
AG04T1S120022
Thielsen Forest Camp Improvements
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the
Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)* Item 1:
Foreign construction material _______ _______ _______
AG04T1S120022
Thielsen Forest Camp Improvements
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
I-3 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JUL 2000)
(a) The Contractor shall submit one of the following payment protections
A payment bond A certified or cashier's check
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
I-4 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)
If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to:
USDA Forest Service.
I-5 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of Agriculture's (USDA) Acquisition Regulation (48 CFR Chapter 4) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
I-6 AGAR 452.209-71 ASSURANCE REGARDING FELONY CONVICTION OR TAX
DELINQUENT STATUS FOR CORPORATE APPLICANTS ALTERNATE 1 (FEB 2012)
(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No.
112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –
(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and
(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.
(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.
I-7 COSTING OF CLAIMS OR MODIFICATIONS
The cost principles and procedures in Subpart 31.2 of the Federal Acquisition Regulations shall be used in the pricing of contract claims and modifications, and for determining costs under terminated contracts, except, where actual costs cannot be determined from the Contractor's accounting records. Allowable ownership and operating costs for owned or rented equipment shall be determined from "The Construction Equipment Ownership and Operating Expense Schedule," U.S. Army Corps of Engineers Publication EP 1110-1-8, published by the U.S. Government Printing Office, to the extent that this publication contains a listing of the equipment being costed, or of similar equipment. During periods of suspension of work pursuant to a contract clause, the allowance for equipment ownership shall not exceed the amount for standby cost as determined by this schedule.
I-8 PAYMENT FOR MATERIALS DELIVERED OFF THE SITE
As provided in FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, material acquired for incorporation into the project, and stored off site by the Contractor, may, at the option of the Contracting Officer, be included in progress payments. Prior to payment, such material will be subject to Government inspection and must be stored separately from other materials, and be identified as, "PROPERTY OF THE UNITED STATES, Project Name and Contract Number." In addition, the Contractor shall furnish the Government with a right of ingress and egress to the property together with right of removal.
I-9 PAYMENTS FOR INDIRECT ITEMS
The intent of the contract is to provide for the complete construction of the project described in the contract.
Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered indirect to and included in the payment for items shown.
I-10 PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
I-11 WAGE DETERMINATION DECISION
The general wage determination applicable to this contract is attached in Section J.
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
Title Pages
1. Specification s 15
2. Project Drawings 6 Title and Signature Sheet Vacinity Map Existing Site Map Stone Fire Stoves Details Sign Structures Typical Log Picnic Tables Typicals
3. DOL Wage Decision No. OR36 with 9 modifications dated 8/31/12 7
4. Fire Protection and Suppression (R6-FS-6300-52) 7
USDA FOREST SERVICE PROJECT SPECIFICATIONS
Thielsen Forest Camp Improvements 1
SECTION 01200
MOBILIZATION PAYMENT PROCEDURES
1. PART 1 - GENERAL
1.01 SUMMARY
A. This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
2. PART 2 - PRODUCTS (NOT USED)
3. PART 3 - EXECUTION (NOT USED)
4. PART 4 - MEASUREMENT AND PAYMENT
4.01 PROGRESS PAYMENTS WILL BE MADE AS FOLLOWS:
A. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
B. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
4.02 BASIS OF PAYMENT
A. Payment will be made under:
PAY ITEM DESCRIPTION PAY UNIT
01200-1 Mobilization Lump Sum
END OF SECTION
Thielsen Forest Camp Improvements 2
SECTION 02317
EXCAVATION AND BACKFILL FOR STRUCTURES
5. PART 1 - GENERAL
5.01 SUMMARY
A. This section specifies excavation and backfill for structures, including excavation;
furnishing, hauling and placing of backfill material; disposal of excess or unsuitable backfill material; and grading. Follow equipment manufacturer's recommendations where more stringent.
B. Material to be excavated is unclassified.
5.02 RELATED SECTIONS
A. 02311 - Finish Grading.
5.03 OWNER’S INSTRUCTIONS
A. Undercutting will not be permitted. Prevent surface water from entering the excavation.
6. PART 2 - PRODUCTS
6.01 MATERIALS
A. Backfill Materials.
1. Backfill materials shall contain no organic or frozen material.
a. General Backfill Material.
1) Excavated material containing no rock larger than 6 inches.
b. Designated Backfill Material.
1) Excavated material containing no rock larger than 3 inches.
c. Crushed Rock.
1) Government source
d. Bedding Material.
1) 1/4 inch minus pea gravel or sand; 100 percent passing the #4 sieve.
e. Topsoil.
1) Loam or excavated topsoil with no rocks larger than 2 inches in greatest dimension.
7. PART 3 - EXECUTION
7.01 CONSTRUCTION
A. Excavation.
1. Topsoil Material.
a. Remove surface material to a depth of 2 inches in areas to be excavated. Stockpile this material separately from other excavated material, for use in grading the site.
B. Backfill.
1. Preparation for Backfill.
a. Remove all forms from structure, and clean the excavated area of all debris.
Remove any standing water from excavation. Prior to backfill, obtain approval from COR to backfill excavated area.
AG04T1S120022
Thielsen Forest Camp Improvements
Thielsen Forest Camp Improvements 3
b. Backfilling all Structures.
1) Do not backfill in a manner to cause structure to become point loaded. Place backfill in uniform lifts around structure.
c. Backfilling of Concrete.
1) Do not backfill until concrete has been in place for 3 days or a strength of 1,000 psi has been reached, unless allowed in writing by COR.
d. Over excavation Backfill Under Slabs.
1) Restore grade for slabs as follows:
a) Within 2 inches of slab bottom: Use bedding material.
b) From 2 inches to 6 inches below slab: Use crushed rock.
c) Over 6 inches below slab: Use general backfill material.
d) Place material in 6 inch maximum lifts and compact with a minimum of 2 passes over the entire layer with mechanical vibrating tamper.
e. Placing Backfill Material.
1) Place all backfill material in 12 inch maximum lifts. Compact each lift with a minimum of 2 passes over the entire layer with mechanical tampers.
2) Do not use tracked or wheeled equipment to compact backfill.
f. Topsoil.
1) Deposit original surface material as the final backfill lift and compact with a minimum of 2 passes over the entire surface with mechanical tamper.
C. Grading.
1. Grade surface uniformly between spot elevations or contours to match existing adjacent ground elevations. Slope surface to provide drainage away from structures.
7.02 EXCESS EXCAVATED MATERIAL (SUITABLE AND UNSUITABLE)
A. Remove all excess or unsuitable material from the site, and stockpile in designated areas.
B. Spread excess material adjacent to structure site to blend with existing contours.
8. PART 4 - MEASUREMENT AND PAYMENT (NOT USED)
Thielsen Forest Camp Improvements
Thielsen Forest Camp Improvements 4
SECTION 02870
SIGN STRUCTURES
1.PART 1 - GENERAL
1.01 SUMMARY
A. This section specifies furnishing and installing log style sign structures.
1.02 RELATED SECTIONS
A. 07900 - Sealants.
2.PART 2 - PRODUCTS
2.01 MATERIALS
A. Timber.
1. B or better Industrial Clear grade machined peeled Douglas Fir for both sign structures, WCLIB “Standard Grading Rules, No. 17.”
2. B or better Industrial Treated non-incised hand peeled Douglas Fir for log frame with FS brown stain, (stain will cover up the copper based treatment used).
B. Lag Screws.
1. Cone point, square head, galvanized steel.
C. Sealant.
1. Treatment of .21 CA-C Brown tone or .40 ACQ Cedar tone (both reddish brown) or equal to.
D. Concrete.
1. Install pressure treated wood in contact with concrete.
3.PART 3 - EXECUTION
3.01 CONSTRUCTION
A. Log Frames.
1. Log Frames.
a. All galvanized, metal or steel bolts will be driven deeper into wood and capped with wooden dowels.
2. Log Bases
a. All logs to be buried or placed in concrete will need to be treated prior to placement.
3. Finish all wooden surfaces with two brush coats of stain.
a. Finish all wooden surfaces as follows:
1) After all cutting, hole drilling, and sanding is completed, but before erection, apply 1 brush coat of brown-pigmented epoxy to all surfaces allowing some to flow into drilled holes.
2) After erection, lightly sand first coat and apply 1 additional brush coat of brown-pigmented epoxy. Quantity of pigment added to epoxy shall be such that wood grain cannot be seen through the finish and sunlight will not penetrate.
AG04T1S120022
Thielsen Forest Camp Improvements
Thielsen Forest Camp Improvements 5
4.PART 4 - MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT
A. Payment will be made at the Contract unit price for both sign structures once they are accepted.
B. Payment will be made under:
02870-1 Log Style Information Sign & Each Log Style Portal Sign
Thielsen Forest Camp Improvements 6
SECTION 02872
PICNIC TABLES
9. PART 1 - GENERAL
9.01 SUMMARY
A. This section specifies furnishing and installing log style picnic tables.
9.02 RELATED SECTIONS
A. 07900 - Sealants.
10. PART 2 - PRODUCTS
10.01 MATERIALS
A. Timber.
1. B or better Industrial Clear grade handed peeled Port Orford Cedar for Table Top and
Seats, WCLIB “Standard Grading Rules, No. 17.”
2. B or better Industrial Treated non-incised hand peeled Douglas Fir for log frame with FS brown stain, (stain will cover up the copper based treatment used).
B. Wood Dowels.
1. Round wood dowels.
C. Sealant.
1. Brown-pigmented epoxy.
11. PART 3 - EXECUTION
11.01 CONSTRUCTION
A. Log Tables.
1. Log Tables.
a. Install with heart face down and sand top and seat planks smooth with medium grit sandpaper.
b. Bolts will be driven deeper into wood and capped with wooden dowels.
2. Log Bases and Seats.
a. Construct log table base and seat bases
b. Install table top and seat planks with heart face down and sand with medium grit sandpaper.
3. Finish all wooden surfaces with two brush coats of stain.
a. Finish all wooden surfaces as follows:
1) After all cutting, hole drilling, and sanding is completed, but before erection, apply 1 brush coat of brown-pigmented epoxy to all surfaces allowing some to flow into drilled holes.
2) After erection, lightly sand first coat and apply 1 additional brush coat of brown-pigmented epoxy. Quantity of pigment added to epoxy shall be such that wood grain cannot be seen through the finish and sunlight will not penetrate.
AG04T1S120022
Thielsen Forest Camp Improvements
Thielsen Forest Camp Improvements 7
12. PART 4 - MEASUREMENT AND PAYMENT
12.01 METHOD OF MEASUREMENT
A. Measurement will be for the number of completed picnic tables furnished and installed.
12.02 BASIS OF PAYMENT
A. Payment will be made at the Contract unit price for each Picnic Table accepted.
02872-1 Picnic Table Each
Thielsen Forest Camp Improvements 8
SECTION 04060
MASONRY MORTAR
13. PART 1 - GENERAL
13.01 SUMMARY
A. This section specifies mortar required for masonry work and grouting work.
13.02 RELATED SECTIONS
A. 04860 – Exterior Stone Cladding.
13.03 DELIVERY, STORAGE, AND HANDLING
A. Deliver packaged mortar materials in unopened containers bearing the manufacturer's identification of contents. Store materials in a dry location.
14. PART 2 - PRODUCTS
14.01 MATERIALS
A. Cement.
1. Masonry cement: ASTM C91.
2. Portland Cement: ASTM C150, Type I.
B. Lime.
1. Hydrated lime: ASTM C207.
2. Quick lime: ASTM C5.
C. Sand.
1. ASTM C144.
D. Water.
1. Clean and suitable for domestic consumption.
15. PART 3 - EXECUTION
15.01 MIXING
A. Thoroughly mix mortar ingredients in accordance with ASTM C270 in quantities needed.
B. Mix in the proportions of 1 part Portland Cement, 0 to 1/4 part lime putty, and 2 to 3 parts sand.
C. Mix with a mechanical mixer capable of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .