Solicitation.pdf
PDF 794 KB Posted
- Attached to
- Forest Engineer and Road Maintenance (FERM) Stream Restoration Federal contract opportunity
- Solicitation number
- AG-04P5-S-16-0004
About this file
BPA Call Solicitation for Upper Sycan Aquatic Habitat Restoration Project Equipment Rental with Operator
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend.pdf | ||
| Amendment.pdf | ||
| 77-0079.txt | TXT text file | |
| Solicitation.pdf | ||
| SF1449.pdf | ||
| Example_Drawing_Log_Jam.pdf | ||
| ReturnPackage.pdf | ||
| FIRE_SPECSAttach567.pdf | ||
| MapArea__6_Bly_Lakeview 1 .pdf | ||
| Example_Streambank_Reshaping_Stabilization.pdf | ||
| 77-0079.txt | TXT text file | |
| Example_Point_Bar_Gravel_Enhancement.pdf | ||
| ReturnPackage.pdf | ||
| MapArea__3_Chemult_Crescent 1 .pdf | ||
| SF1449.pdf | ||
| Example_Floodplain_Grade_Control.pdf | ||
| Example_Point_Bar_Gravel_Enhancement_2.pdf | ||
| MapArea__4_Paisley_Silverlake 1 .pdf | ||
| MapArea__5_Chiloquin_Klamath 1 .pdf | ||
| Upper_Sycan_River_Restoration_Map.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fremont-Winema National Forest
Contract No.
Project Name: Upper Sycan Aquatic Habitat
Restoration Project: Equipment Rental with
Operator for Paisley Ranger Sistrict
Issue Date: May 11, 2016
Contractor:
Issuing and Billing Office:
2819 Dahlia St.
Klamath Falls, OR 97601
Attn: Deanna Vest
Item
No.
Description Quantity
Order
Unit
Unit
Price
Amount
BASE ITEM – 8/1/2016 – 9/30/2016
1.1 Mobilization – Includes moving of
equipment to/from project location.
1 Lump
Sum
1.2 1 Tracked Excavator. Service work activities (minimum of 100 hp (fly wheel power) and 35,000 lbs. operating weight with blade and bucket with thumb (36” minimum toothed bucket) for a total of
300 hours starting 08/01/2016.
Hours
TOTAL BASE ITEM
OPTION ITEM – 8/1/2017-9/30/2017
2.1 Mobilization – Includes moving of
equipment to/from project location.
1 Lump
Sum
2.2 1 Tracked Excavator. Service work activities (minimum of 100 hp (fly wheel power) and 35,000 lbs. operating weight with blade and bucket with thumb (36” minimum toothed bucket) for a total of
350 hours starting 8/1/2016.
2.3 Equipment rental with operator: 1
Ten yard dump truck for 40 hours, starting 8/1/17. Ideally operator of excavator also operates dump truck.
TOTAL OPTION ITEM $__________
GRAND TOTAL BASE AND
OPTION ITEMS
PROPOSALS MUST BE SUBMITTED
BY May 31, 2016 BY 8 A.M. May be emailed to dvest@fs.fed.us
Telephone # ____________________
E-Mail: _______________________
DUNS# _______________________
Parent FERM Contract Applies to this
Solicitation and Contract.
The Period of Performance for this Task Order is from the Date of
Award through September 30, 2016 for Base Item; and through
September 31, 2017 for Option Item.
Total Price:
Contractor: (Name and Signature)
Signature _________________________ Print Name_____________________ Date__________
Requested By: (Name and Signature)
COR:
Ordered By: (Name and Signature)
Contracting Officer: DEANNA L. VEST
Please submit your Quote in 2 parts, price quote and technical proposal.
Email: dvest@fs.fed.us Fax: 541-885-3452 Mail or Deliver: Klamath Ranger District 2819 Dahlia St.
Klamath Falls, OR 97601
Vendor is responsible to ensure quote received by the Government. By email to dvest@fs.fed.us or phone 541-883-6737.
mailto:dvest@fs.fed.us mailto:dvest@fs.fed.us
UPPER SYCAN RIVER AQUATIC HABITAT RESTORATION DESCRIPTION/SPECIFICATIONS
1. Project Location
The legal description for the project area is: T33S, R16E, Sections 27, 28, 34, and 35. The project area begins in the Upper Sycan River just upstream of the Rock Creek Forest Camp and continues upstream approximately 3.0 miles to near the Hanan Trailhead. Major forest roads in the area are USFS
28 and 3380.
2. Description of Work
The project area has experienced a loss of riparian vegetation and an altered hydrologic regime as a result of historic grazing practices, timber harvest and associated road construction. This loss of riparian vegetation and altered hydrologic regime has led to eroding streambanks which has resulted in a down cut channel, a disconnection to floodplain terraces, increased levels of fine sediment, and a lack of aquatic habitat connectivity.
The project will address degraded instream habitat and riparian conditions. Implementation would in 2016 and 2017 between August 1st and September 30th which is the established inwater work period by the Oregon Department of Fish and Wildlife. The project will be implemented using a track mounted excavator and dump truck. The following is a brief description of the work:
3. Large Wood Restoration
Large woody debris will be added to the Upper Sycan River using a track mounted excavator.
The length of these areas totals approximately 1.5 miles of stream. Up to 100 trees would be removed from forested stands within 300 feet of the stream for each stream, targeting dead or dying lodgepole pine.
Creation of small log jams in some reaches will occur, typically on meander bends, and may involve reshape of streambanks. Boulders in the area will also be used to provide stability of large wood structures. The addition of this material will provide stream channel stability, complexity of stream habitats, provide cover for fish, and create pools. Removal of the material from adjacent riparian areas will improve the shrub component in these areas.
4. Streambank Stabilization/Floodplain Reconnect
The project will involve streambank stabilization and revegetation of riparian areas with whole willow transplants and sedge/sod mats and typically occur on slopes less than 5%. Work will occur both from the streambank and within the stream channel. Streambank stabilization will involve recontouring actively eroding streambanks and creation of floodplain terraces using an excavator to match streambank contours upstream and downstream of the eroding area. This will allow for high stream flows to better access the floodplain which will decrease the rivers ability to erode these areas. Root wad revetment may be incorporated and will involve excavation of a trench into the streambank and placement of the root wad into the trench at an angle specified by the COR. Boulders may be incorporated into the revetment to provide added stability. Sedge/sod mats may also be used at toes of newly recontoured streambanks as well as gravel placement. Whole willow transplants will also be placed just upslope of the toe and sod/sedge mats placed on the new recontour.
5. Riparian Restoration/Planting
Once streambanks have been recontoured, gravel toes in place, and juniper revetment keyed in, whole willow transplants will occur. These willows will come from dryer sites away from the river and follow the methods in Hoag 2003. In addition sod/sedge removed as part of the streambank recontour will be placed on the newly recontoured streambank around the transplanted willows. Work will occur on slopes less than 5% and in the adjacent floodplain.
6. Collection of Material
As previously mentioned, large wood material and boulders would be obtained from adjacent riparian and upland areas along the project locations. Fill material is also available within the project area however, some maybe brought into the project area by the USFS prior to implementation.
7. Estimated Start Dates of Work
August 1, 2016 for implementation of base item. Completion Date September 30, 2016.
August 1, 2017 for implementation of option item. Completion Date September 30, 2017
July 15, 2016 for implementation. Completion Date September 30, 2016.
8. EQUIPMENT – 1 Tracked Excavator and 1 10-yard Dump Truck
Excavator shall have:
Minimum of 100 hp fly wheel power and 35,000 lbs. operating weight with blade and bucket with thumb (36” minimum toothed bucket).
10 Yard Dump Truck
Spill kit approved by OSHA for petroleum product leaks will be on site at all times.
All equipment and vehicles to be used at the job site shall be cleaned and free of noxious weeds, seeds, external grease and oil prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use as well as on road use, whether they are owned, leased, or borrowed by the Contractor or Subcontractor.
9. FAR 52.236-27 SITE VISIT (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and
Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Rich Pyzik or Tony Longacre
Address: Paisley Ranger District
303 Highway 31
Paisley, OR 97636
Telephone: 541-943-4440/541-943-4453
10. FAR 52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
(a) The Contractor shall promptly, and before the conditions are disturbed, give a written notice to the Contracting Officer of—
(1) Subsurface or latent physical conditions at the site which differ materially from those indicated in this contract; or
(2) Unknown physical conditions at the site, of an unusual nature, which differ materially from those ordinarily encountered and generally recognized as inhering in work of the character provided for in the contract.
(b) The Contracting Officer shall investigate the site conditions promptly after receiving the notice. If the conditions do materially so differ and cause an increase or decrease in the Contractor’s cost of, or the time required for, performing any part of the work under this contract, whether or not changed as a result of the conditions, an equitable adjustment shall be made under this clause and the contract modified in writing accordingly.
(c) No request by the Contractor for an equitable adjustment to the contract under this clause shall be allowed, unless the Contractor has given the written notice required; provided, that the time prescribed in paragraph (a) of this clause for giving written notice may be extended by the
Contracting Officer.
(d) No request by the Contractor for an equitable adjustment to the contract for differing site conditions shall be allowed if made after final payment under this contract.
11. FAR 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR
1984)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to (1) conditions bearing upon transportation, disposal, handling, and storage of materials; (2) the availability of labor, water, electric power, and roads; (3) uncertainties of weather, river stages, tides, or similar physical conditions at the site; (4) the conformation and conditions of the ground; and (5) the character of equipment and facilities needed preliminary to and during work performance. The
Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the
Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the
Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
12. FAR 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (APR 1984)
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
13. FAR 52.236-12 CLEANING UP (APR 1984)
The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.
14. FAR 52.236-13 ACCIDENT PREVENTION (NOV 1991) Alternate I
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and
29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health
Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
(f) Before commencing the work, the Contractor shall—
(1) Submit a written proposed plan for implementing this clause. The plan shall include an analysis of the significant hazards to life, limb, and property inherent in contract work performance and a plan for controlling these hazards; and
(2) Meet with representatives of the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
15. AGAR 452.236-73 ARCHAEOLOGICAL OR HISTORIC SITES (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
16. CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION
(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).
(b) Pollutants such as fuels, lubricants, bitumen’s, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.
17. LANDSCAPE PRESERVATON
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in the contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material which falls outside of these limits shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
(b) Prevention of Oil Spills. If the Contractor maintains storage facilities for oil or oil products on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual states.
(c) Servicing of Equipment. Servicing of equipment shall be done only in the area approved by the
Contracting Officer. All residual oils from servicing shall be removed from the site.
(d) Petroleum Products Storage. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, the Contractor shall prepare a Spill
Prevention Control and Countermeasures (SPCC) Plan. Such plan shall meet applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
18. CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for designating Contracting Officer’s Technical Representative (COTR/Inspector). The
COR or COTR/Inspector will be present at all times during the performance of work. The COR or
COTR/Inspector is responsible for structure design and insuring that structures are installed correctly. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the
Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)
On all matters that pertain to the contract terms, the Contractor must communicate with the
Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists, the Contracting
Officer should be notified immediately, preferably in writing if time permits.
Name: Rich Pyzik and Tony Longacre
Address: Paisley Ranger District
303 Highway 31
Paisley, OR 97636
541-943-4440 (Rich) or 541-943-4453 (Tony)
19. CONTRACTOR OR REPRESENTATIVE ON THE JOB
The Contractor or authorized representative shall be on the project area where work is in progress.
In the absence of the Contractor, Contractor's authorized representative shall receive orders and instructions from the COR and take such action as is required to keep the job in progress under the terms of the contract.
20. INSPECTIONS
Work will be accepted on the basis of visual inspection. The inspector/COR will inspect for compliance with the contract specifications and productivity of the equipment and crew.
When inspecting for noxious weed control, the for-use and release inspections will be conducted jointly by the Government and the Contractor, or Contractor's representative, at the point of hire and again at the point of release. Both parties will sign the vehicle inspection forms.
21. NOXIOUS WEED CONTROL
(a) In order to prevent the potential spread of noxious weeds onto the Fremont-Winema National
Forest, the Contractor shall be required to furnish the Forest Service with proof of weed-free equipment before entering the National Forest.
(b) Noxious weeds are defined as any exotic plant species established or that may be introduced in the State, which may render the land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the Oregon Department of Agriculture or the Crook, Wheeler, or Grant County Weed Board or by other appropriate agencies having jurisdiction.
(c) All equipment and vehicles to be used at the job site shall be cleaned and certified free of noxious weeds and their seeds prior to entrance onto the National Forest. The restriction shall include equipment and vehicles intended for off-road use, as well as on road use, whether they are owned, leased, or borrowed by the Contractor or subcontractor.
(d) Cleaning shall consist of the removal of all dirt, grease, debris, and materials that may harbor noxious weeds and their seeds. This may require the use of a pressure hose. Cleaning shall occur off Federal lands.
(e) Equipment, materials and vehicles shall be visually inspected by a designated Forest Service
Officer, and certified in writing to be reasonably clean and weed free. Inspections will take place at a location designated by the Forest Officer in advance of equipment and material arrival.
Equipment and vehicles are expected to proceed directly to the job site following the inspection.
Materials to be used on the project will be delivered to the job site following the inspection.
Materials to be used on the project will be delivered to the project after inspection and approval.
(f) Certification shall remain valid for each identified piece of equipment or vehicle only for the duration of the specified project and only as long as the vehicle or equipment remains at the job site. Equipment and vehicles (excepting passenger vehicles - this includes pickups and vans) that leave the job site will need to be recertified as weed free before they are allowed to return to the job site or re-enter the National Forest.
22. USE OF PREMISES
The Contractor shall comply with the regulations governing the operation of premises which are occupied and shall perform this contract in such a manner as not to interrupt or interfere with the conduct of Government business.
Before any camp is opened or operated on National Forest land or lands administered by the Forest
Service, written permission shall be obtained through the Contracting Officer. A camp is interpreted to include the camp site or trailer parking area of any employee working on the project for the Contractor. Such permission, if granted, will be without charge to the Contractor.
The Contractor shall request permission (in writing) from the appropriate Ranger District to use campsites. If permission is granted, the District Ranger's letter shall specify all conditions and requirements.
It is further stipulated that in addition to clean-up of any camp sites, the Contractor is required to remove all his equipment from National Forest land before final acceptance and payment of the project.
Portable chemical toilets, self-contained holding tanks, approved pit or vault toilets which meet
State Code are required.
23. CAMPING PROVISIONS
The following provisions apply to all camping on National Forest lands during performance of this contract:
These provisions are in addition to those contained in, or provided for, in the clause titled “Use of
Premises”, in this contract.
Every structure used as shelter shall provide protection from the elements. Where heat adequate for weather conditions is not provided, other arrangements should be made to protect workers from the cold. Firewood may be cut only after obtaining a District Firewood Permit.
The campsite must not encroach beyond the boundaries designated by the Forest Service. The campsite shall be located so as to minimize impacts on streams, lakes, and other bodies of water.
No camping is permitted within developed recreation sites or along primary recreation roads.
The campsite shall have a clean appearance at all times. Upon abandonment of any campsite, or termination, revocation, or cancellation of camping privileges, the contractor shall remove, within
10 calendar days, all structures and improvements except those owned by the United States, and shall restore the site, unless otherwise agreed upon in writing or in the camping permit. If the contractor fails to remove all structures or improvements within the 10 calendar days, they shall become the property of the United States, but that will not relieve the contractor of liability for the cost of their removal and restoration of the site.
Unless otherwise designated by the Contracting Officer, the use of this area is not exclusive, and may be granted to other Permittees, contractors, or recreating public. Disorderly conduct is not permitted. Damaging or removing any natural feature or other property of the Forest Service is prohibited. Servicing of equipment in the campsite is not permitted, unless the campsite is within the project area. Sanitary facilities shall be provided for storing food. Ice chests or coolers, with ice supply made from potable water and replenished as necessary, shall be provided and sufficient for the storage of perishable food items. An adequate and convenient potable water supply shall be provided in each camp for drinking and cooking purposes. Toilet facilities adequate for the capacity of the camp shall be provided and supplied with adequate toilet paper. Such facilities shall be serviced and maintained in a sanitary condition. Garbage shall be collected, stored, and disposed of in such a manner as to prevent scattering by the wind, minimize attraction of flies, and discourage access by rodents.
Basic first aid supplies shall be maintained, available, and under the charge of a person trained to administer first aid. The supplies shall include:
Gauze pads (at least 4x4 inches)
Two large gauze pads (at least 8x10 inches)
Box adhesive bandages (band-aids)
One package of gauze roller bandage at least 2- inches wide
Two triangular bandages
Scissors
At least one blanket
Tweezers
Adhesive tape
Latex gloves
Resuscitation device such as resuscitation bag, airway, or pocket mask
Any washing of laundry shall be done in such a way as to provide for washing and rinsing without polluting lakes, streams, or other flowing water.
Waste water must be disposed of away from living and eating areas and in a fashion that minimizes pollution to lakes, streams, and other flowing water.
The contractor shall take all reasonable precautions to prevent and suppress forest fires. No material shall be disposed of by burning in open fires during the closed season established by law or regulation without the written permission from the Forest Service.
The contractor shall comply with the following fire regulations during fire season:
During the fire season, a shovel, axe or Pulaski, 10-quart pail which is full of water for immediate use, and a fire extinguisher with an Underwriters Laboratory (UL) rating of at least 1:A 10:BC is required during the fire season.
All fire rings or outside fireplaces must be approved by the Forest Service representative. The area will be cleared down to mineral soil for a distance of 1 foot outside of the ring or fireplace, and it will not have any overhanging material. Fire rings will be dismantled and material disposed prior to leaving the site.
All generators and other internal combustion engines must be equipped with US Forest Service approved spark arrestors and/or factory designed muffler and exhaust system in good working order. They will be located in a cleared area with the same requirements as in above paragraph.
All fuel must be stored in UL approved flammable storage containers and be located at least 50 feet from any open flame or other source of ignition.
Any violation of these conditions constitutes a breach of contract, and may result in revocation of camping approval.
The Forest Service reserves the right to terminate a camping permit at any time.
24. TRAFFIC CONTROL
The Contractor shall provide, erect, and maintain all necessary barricades, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points, where the project crosses or coincides with an existing road or trail.
25. FAR 52.211-10 COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than September 30, 2015. The time stated for completion shall include final cleanup of the premises. Work is estimated to begin July 15, 2015.
The beginning of work may change depending on the existing fire precaution levels.
Work is to be performed Monday through Friday, exclusive of Federal Holidays, during day light hours. Work days will generally be 8 hour days. Alternate work schedules shall be subject to mutual agreement between the Contractor and the Government. For mobilization and moving of large wood, the COR or Inspector may or may not be on-site.
26. AGAR 452.216-74 CEILING PRICE (FEB 1988)
The ceiling price of this contract is:
Base Item – 300 hours for excavator
Option Item – 350 hours for excavator, 40 hours for dump truck
The Contractor shall not make expenditures or incur obligations in the performance of this contract which exceed the ceiling price specified herein, except at the Contractor's own risk.
27. FAR 52.232-7 PAYMENTS UNDER TIME-AND-MATERIALS AND LABOR-HOUR
CONTRACTS (FEB 2007)
The Government will pay the Contractor as follows upon the submission of vouchers approved by the Contracting Officer or the authorized representative:
(a) Hourly rate.
(1) Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are—
(i) Performed by the Contractor;
(ii) Performed by the subcontractors; or
(iii) Transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control.
(2) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the Schedule by the number of direct labor hours performed.
(3) The hourly rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by employees that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.
(4) The hourly rates shall include wages, indirect costs, general and administrative expense, and profit. Fractional parts of an hour shall be payable on a prorated basis.
(5) Vouchers may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer), to the Contracting Officer or authorized representative. The Contractor shall substantiate vouchers (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment and by—
(i) Individual daily job timekeeping records;
(ii) Records that verify the employees meet the qualifications for the labor categories specified in the contract; or
(iii) Other substantiation approved by the Contracting Officer.
(6) Promptly after receipt of each substantiated voucher, the Government shall, except as otherwise provided in this contract, and subject to the terms of paragraph (e) of this clause, pay the voucher as approved by the Contracting Officer or authorized representative.
(7) Unless otherwise prescribed in the Schedule, the Contracting Officer may unilaterally issue a contract modification requiring the Contractor to withhold amounts from its billings until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the
Government's interests. The Contracting Officer may require a withhold of 5 percent of the amounts due under paragraph (a) of this clause, but the total amount withheld for the contract shall not exceed $50,000. The amounts withheld shall be retained until the Contractor executes and delivers the release required by paragraph (g) of this clause.
(8) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis. If no overtime rates are provided in the Schedule and overtime work is approved in advance by the Contracting Officer, overtime rates shall be negotiated. Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract. If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.
(b) Materials.
(1) For the purposes of this clause—
(i) Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
(ii) Materials means—
(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control;
(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.); and
(D) Applicable indirect costs.
(2) If the Contractor furnishes its own materials that meet the definition of a commercial item at 2.101, the price to be paid for such materials shall not exceed the Contractor's established catalog or market price, adjusted to reflect the—
(i) Quantities being acquired; and
(ii) Actual cost of any modifications necessary because of contract requirements.
(3) Except as provided for in paragraph (b)(2) of this clause, the Government will reimburse the Contractor for allowable cost of materials provided the Contractor—
(i) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or
(ii) Ordinarily makes these payments within 30 days of the submission of the
Contractor's payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.
(4) Payment for materials is subject to the Allowable Cost and Payment clause of this contract. The Contracting Officer will determine allowable costs of materials in accordance with
Subpart 31.2 of the Federal Acquisition Regulation (FAR) in effect on the date of this contract.
(5) The Contractor may include allocable indirect costs and other direct costs to the extent they are—
(i) Comprised only of costs that are clearly excluded from the hourly rate;
(ii) Allocated in accordance with the Contractor's written or established accounting practices; and
(iii) Indirect costs are not applied to subcontracts that are paid at the hourly rates.
(6) To the extent able, the Contractor shall—
(i) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and
(ii) Take all cash and trade discounts, rebates, allowances, credits, salvage, commissions, and other benefits. When unable to take advantage of the benefits, the Contractor shall promptly notify the Contracting Officer and give the reasons. The Contractor shall give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that have accrued to the benefit of the Contractor, or would have accrued except for the fault or neglect of the Contractor. The Contractor shall not deduct from gross costs the benefits lost without fault or neglect on the part of the Contractor, or lost through fault of the Government.
(7) Except as provided for in 31.205-26(e) and (f), the Government will not pay profit or fee to the prime Contractor on materials.
(c) If the Contractor enters into any subcontract that requires consent under the clause at
52.244-2, Subcontracts, without obtaining such consent, the Government is not required to reimburse the Contractor for any costs incurred under the subcontract prior to the date the
Contractor obtains the required consent. Any reimbursement of subcontract costs incurred prior to the date the consent was obtained shall be at the sole discretion of the Government.
(d) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule, and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding
30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during performing this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting
Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performing this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.
(e) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the
Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.
(f) Audit. At any time before final payment under this contract, the Contracting Officer may request audit of the vouchers and supporting documentation. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding vouchers, that are found by the
Contracting Officer or authorized representative not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. Upon receipt and approval of the voucher designated by the Contractor as the “completion voucher” and supporting documentation, and upon compliance by the Contractor with all terms of this contract (including, without limitation, terms relating to patents and the terms of paragraph (g) of this clause), the
Government shall promptly pay any balance due the Contractor. The completion voucher, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.
(g) Assignment and Release of Claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions:
(1) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible of exact statement by the Contractor.
(2) Claims, together with reasonable incidental expenses, based upon the liabilities of the
Contractor to third parties arising out of performing this contract, that are not known to the
Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.
(3) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.
(h) Interim payments on contracts for other than services.
(1) Interim payments made prior to the final payment under the contract are contract financing payments. Contract financing payments are not subject to the interest penalty provisions of the Prompt Payment Act.
(2) The designated payment office will make interim payments for contract financing on the _30th____ day after the designated billing office receives a proper payment request. In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.
(i) Interim payments on contracts for services. For interim payments made prior to the final payment under this contract, the Government will make payment in accordance with the Prompt
Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(j) The terms of this clause that govern reimbursement for materials furnished are considered to have been deleted.
28. FAR 52.216-31 TIME-AND-MATERIALS/LABOR-HOUR PROPOSAL REQUIREMENTS—
COMMERCIAL ITEM ACQUISITION (Feb 2007)
(a) The Government contemplates award of a Time-and-Materials or Labor-Hour type of contract resulting from this solicitation.
(b) The offeror must specify fixed hourly rates in its offer that include wages, overhead, general and administrative expenses, and profit. The offeror must specify whether the fixed hourly rate for each labor category applies to labor performed by—
(1) The offeror;
(2) Subcontractors; and/or
(3) Divisions, subsidiaries, or affiliates of the offeror under a common control.
29. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL ITEMS (MAY
2015) Incorporated by Reference, The full text of a clause or provision may be accessed electronically at www.acquisition.gov.
30. AGAR 452.209 – 70 REPRESENTATION BY CORPORATIONS REGARDING AN UNPAID
DELINQUENT TAX LIABILITY OR A FELONY CONVICTION (DEVIATION 2012-01) Alternate 1 (Feb
2012).
(a.) Awards made under this solicitation are subject to the provisions contained in the Consolidated
Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. To comply with these provisions, all offerors must complete paragraph (1) of this representation, and all corporate offerors also must complete paragraphs (2) and (3) of this representation.
(b) The Offeror represents that –
(1) The Offeror is [ ], is not [ ] (check one) an entity that has filed articles of incorporation in one of the fifty states, the District of Columbia, or the various territories of the United States including American Samoa, Federated States of Micronesia, Guam, Midway Islands, Northern
Mariana Islands, Puerto Rico, Republic of Palau, Republic of the Marshall Islands, U.S. Virgin
Islands. (Note that this includes both for-profit and non-profit organizations.)
If the Offeror checked “is” above, the Offeror must complete paragraphs (2) and (3) of the representation. If Offeror checked “is not” above, Offeror may leave the remainder of the representation blank.
(2) (i) The Offeror has [ ], has not [ ] (check one) been convicted of a felony criminal violation under Federal or State law in the 24 months preceding the date of offer.
(ii) Offeror has [ ], has not [ ] (check one) had any officer or agent of Offeror convicted of a felony criminal violation for actions taken on behalf of Offeror under Federal law in the 24 months preceding the date of offer.
(3) The Offeror does [ ], does not [ ] (check one) have any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.
31. GOVERNMENT FURNISHED PROPERTY
Description Location Remarks
All Fill Material (logs, rock, gravel, fines, and willows)
Project site
32. AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996)
(a) Contractor's Responsibility For Fighting Fire. (1) The Contractor, under the provisions of
FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agent or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the
Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the
CHANGES clause, FAR 52.243-4.
33. LIST OF ATTACHMENTS
The following attachments are made a part of this solicitation and any resultant contract.
Title Pages
Exhibit A - Project Site Map 1
Exhibit B - Log & Rock J-Hook with Log Jam Complex & Fish Habitat 1
Exhibit C – Floodplain Grade Control Conceptual Design 1
Exhibit D – Point Bar Gravel Enhancement (1) 1
Exhibit E – Point Bar Gravel Enhancement (2) 1
Exhibit F – Streambank Reshaping 1
Exhibit G - Fire Protection and Suppression Requirements 8
Service Contract Act Wage Determination #77-0079 Rev.51, dated
12/29/2015
34. SUBSTITUTION OF EQUIPMENT
(a) The Contractor may substitute equipment meeting all the equipment specifications for any equipment approved for use under this contract, only with the concurrance of the Government. All substitute equipment shall be subject to inspection before acceptance and shall be made at no cost to Government.
(b) If Contractor's equipment becomes inoperable, repairs or replacement of equipment will be required within 72 hours. The Government may extend the 72 hour time frame depending on circumstances (i.e., extent of repair, availability of parts, and urgency of project.) The Government may exercise its right to default the Contractor. Machine breakdowns in excess of 1/4 hour will be at the expense of the contractor. This will be prorated out of your quoted hourly rate.
35. PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them, by or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
36. EVALUATION CRITERIA
The Government will issue an order as a result of this Request for Quotations to the responsible quoter whose quote conforming to the solicitation will be most advantageous, the “BEST VALUE” to the Government, considering price, past performance, key personnel, and equipment. Past performance, key personnel, and equipment when combined are equal to price when evaluating quotes. The Government is not obligated to request additional information.
The Government may issue orders to other than the lowest quote, waive minor informalities…
This is the start of the file's text. The full file is on GovTribe.