PDF 1 MB Posted
- Attached to
- Fairview and Acker Lookout Upgrades_Umpqua NF Federal contract opportunity
- Solicitation number
- AG-04N7-S-14-0054
About this file
RFQ_Construction Document
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fairview_Information_Dwgs.pdf | ||
| Specifications__.pdf | ||
| Pictures_and_Discriptions.pdf | ||
| Acker_Information_Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1 54
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
AG-04N7-S-14-0054 08/27/2014 706131
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Rogue River/Siskiyou National Forest Service 3040 Biddle Road Medford, OR 97504
See Schedule
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION
NAME TELEPHONE NUMBER OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Maggie Giuliani, Contracting Officer Kayli Barber, Facilities Engineer
618-2018 957-3206
a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
September 16, 2014 This is NOT a public Bid Opening submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f) Fairview & Acker Lookout
Upgrades
Umpqua National Forest Douglas County, Oregon
See Schedule of
Items in Section B.
Price Range: Between $25,000 and $100,000
NOTE: Offerors MUST register in the System for Awards Management
(www. SAM.gov) data base.
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AG-04N7-S-14-0054
Fairview & Acker Lookout Upgrades
TABLE OF CONTENTS
Request for Quotation – Standard Form 18 1
Table of Contents 2
Schedule of Items / Notes to Contractor 3-5
Section C – Description/Specification/Work Statement 6--8
Section D – Packaging and Marking 9
Section E – Inspection and Acceptance 10-11
Section F – Deliveries and Performance 12-13
Section G – Contract Administration Data 14
Section H – Special Contract Requirements 15-18
Section I – Contract Clauses 19-28
Section J – List of Attachments 29
Project Specifications - Attached Separately
Project Drawings – Attached Separately
Project Pictures/Descriptions – Attached Separately
Department of Labor Wage Determination 30-38
Section K – Representations, Certifications and Other Statements of Offerors 44-46
Section L – Instructions, Conditions, and Notices to Offerors 47-51
Section M – Evaluation Factors for Award 52-54
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Fairview Acker Lookout Upgrades
Douglas County, Oregon
B.1 SCHEDULE OF ITEMS:
BASE ITEMS
ITEM NO.
DESCRIPTION
UNIT
OF
ISSUE
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
01200-1 Remote Mobilization for Fairview and
Acker
LS ALL
15600-1 Furnish and Install
Propane Heater at
Fairview Lookout
Tower
15600-2 Furnish and Install
Propane Heater at
Acker Lookout Tower
LS ALL
15600-3 Furnish and Install
Refrigerator Acker
Lookout Tower
LS ALL
15600-4 Furnish and Install
Range Acker Lookout
Tower
LS ALL
15600-5 Furnish and Install
Combustion Air Vents at Acker Lookout
15700-1 Replace Existing Gas
Line from the Propane
Tanks to the Cab with
¾” Black Steel at the
Acker Lookout Tower
15700-2 Install Emergency
Shut Off Before the
Propane Line Enters the Cab at Acker
Lookout. Furnish and install secondary regulator.
07050-1 Remove propane heater stove pipe in its entirety at Fairview
Lookout
07050-2 Install tubular gasket vinyl weather stripping to inside windows at Fairview
Lookout
06100-1 Furnish and Replace
Damaged Cross
Members on the
Fairview Lookout
03600-1 Repair Base and
Tower Legs at
Fairview Lookout with
Government
Furnished Materials
TOTAL
BASE
ITEMS
B-2 Optional Bid Items
ITEM NO.
DESCRIPTION
UNIT
OF
ISSUE
EST.
QTY.
UNIT
PRICE
TOTAL
AMOUNT
15600-O Install two (2) LP Gas
Lights
LS ALL
TOTAL
OPTION
ITEM
B-2 Optional Bid Items
Optional bid items are described in the Contract Documents (Drawings and Specifications). The Government reserves the right to accept any one, all, or none of the optional bid items.
Optional items may be awarded at any time within the performance period of the base items.
All line items must be filled out. If there is not the intent to charge for a Bid Item, a price of "0" or "No Cost" should be shown
LS = Lump Sum
NEW --- Invoice Processing Platform
NEW ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing Platform (IPP). All invoices are to be submitted via the electronic Invoice Processing Platform. This is a mandatory requirement initiated by the U.S.
Department of Treasury and you can find more information at this website https://www.ipp.gov/index.htm.
Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.
DUNS NUMBER: ____________________________________________
TAX IDENTIFICATION NUMBER (TIN): ________________________________________
EMAIL ADDRESS: _____________________________________________________________
NOTES:
1) Quoters are urged to inspect work site before submitting quote.
2) A bid bond is not required for this solicitation. A payment bond (100%) is required within 10 days after contract award(Applicable if contract award exceeds $30,000). Contractor shall submit either a payment bond or Irrevocable Letter of Credit (ILC) as acceptable payment protections.
3) Offerors MUST register in the SYSTEM FOR AWARD MANAGEMENT (SAM) data base – See FAR 52.204-7 and Annual Representations and Certifications Applications – See FAR clause 52.204-8. These are now consolidated at the following site: https://www.sam.gov/portal/public/SAM/
4) ELECTRONIC OFFERS WILL NOT BE ACCEPTED. An offer that is emailed to a government account will be rejected.
5) Facsimile quotes will be accepted. See Section L for Fax Number.
6) This is not a public bid opening. All offers submitted are considered confidential. The name of the contractor and the amount of the contract will be disclosed only after an award has been made.
7) RETURN PACKAGE: To be considered for award the offeror must complete and return the following documents to this office on or before the date and time specified for receipt of offers:
Completed Standard Form 18 – page 1
Schedule of Items/Bid Schedule – pages 3-4
Notes to Contractor – page 5 (DUNS, TIN and E-mail address) –
All of Section K – Representations, Certifications and Other
Statements of Offerors
All of Section M – Evaluation Factors for Award/Complete Form
RETURN DOCUMENT S TO: Rogue River-Siskiyou NF
Attn: Contracting
3040 Biddle Road
Medford, OR 97504
Put Solicitation Number AG-04N7-S-14-0054 and Project Title on outside of envelope.
https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm https://www.sam.gov/portal/public/SAM/
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 DESCRIPTION OF WORK
A. The base items in general include:
1. 01200-1 This item covers mobilization of supplies and equipment to the Fairview Lookout
Tower and the Acker Lookout Tower.
B. The base items for the Fairview Lookout Tower include:
1. 15600-1 Supply and installation of new propane heater at Fairview Lookout. Remove existing propane heater. All items removed shall be taken off Forest Service Lands. Item includes grounding and all valves and appurtenances for installation.
2. 07050-1 Remove propane heater stove pipe in its entirety. Seal off roof penetration of existing propane heater on both the inside ceiling and the outside roof. Roof repair of penetration must be watertight to prevent weather damage. Match repair materials to existing surrounding material inside and outside.
3. 07050-2 Furnish and supply tubular vinyl gasket on the inside of all windows to create a weather-tight seal around windows.
4. 06100-1 Furnish and replace damaged cross members. Provide all connection bolts and timbers for complete replacement. See pictures and descriptions of existing cross members.
5. 03600-1 Repair Lookout base and tower legs with Government furnished high-strength, non-shrink grout and Simpson Strong Tie CS16-R per specification requirements.
C. The base items for Acker Lookout Tower include:
1. 15600-2 Supply and installation of new propane heater at Acker Lookout. Remove existing propane heater. All items removed shall be taken off Forest Service Lands. Item includes grounding and all valves and appurtenances for installation.
2. 15600-3 Install Refrigerator for Acker Lookout. Remove existing refrigerator. All items removed shall be taken off Forest Service Lands. Item includes grounding and all valves and appurtenances for installation.
3. 15600-4 Install LP Gas Range Oven. Remove existing gas range oven. All items shall be taken off Forest Service Lands. Item includes grounding and all valves and appurtenances for installation.
4. 15600-5 Furnish and install combustion air vents at Acker Lookout Tower.
5. 15700-1 Replace Existing Gas Line from the Propane Tanks to the Cab with Furnished
¾” Black Steel at the Acker Lookout Tower. The gas line must be properly supported the entire length. Work for this item includes all fittings and appurtenances for a complete installation.
6. 15700-2 Install emergency shut off before the propane line enters the cab at Acker
Lookout. The location of the shut off shall be accessible. Provide all fittings and appurtenances for a complete installation. Install secondary regulator.
D. The Option Items for Acker Lookout Tower include:
1. 15600-O Install two (2) LP Gas Lights
C-2 PROJECT LOCATION
Fairview Lookout (Asset ID 4229) is located on the Cottage Grove Ranger District at an elevation of approximately 5933 feet. It is located approximately 30 miles by road from the city center of Cottage Grove, OR. The existing lookout, constructed in 1972, is a 14x14 foot square cabin, used as living quarters, with a 53-foot tower. It is described as a timber tower (TT), Flat Tower, also called a CT-2 Tower. One comfort station
(toilet building) is located at the base of the lookout. Lookout use is as a recreation rental and for fire lookout.
Acker Rock Lookout (Asset ID 4001) is located on the Tiller Ranger District at an elevation of approximately
4112 ft. elevation, located approximately 60 road miles from Canyonville, Oregon. Built in 1961, the lookout is seasonally staffed as a fire detection resource and is used for a recreational rental. The lookout tower is generally available for recreation rental reservation from August 1st thru November 15 th
. The lookout is remote.
The lookout is roughly 30 miles by road from the Tiller Ranger Station. There is a turn around and parking area for the lookout. From the parking area, everything must be packed in via a moderately steep 0.5-mile hike along a forested trail to reach the lookout. The lookout is within the primary nest protection zone of the Peregrine falcon. The lookout cannot be used until the falcon has fledged
C-3 PRICE RANGE
The Government’s estimated price range is: Between $25,000 and $100,000
C-4 APPLICABLE SPECIFICATIONS (CSI PROJECTS)
The specifications shown in the specification listing contained in the attachments are applicable to this contract.
All specifications not included in the specification listing but referenced by listed specifications, are applicable.
The specifications shown on the specification list are physically attached.
C-5 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
C-5.1 WARRANTY
Equipment supplied under this contract shall have the following warranties:
LP Heater Combustion Chamber 10 Years
LP Heater all other parts 1 Year
Warranties on equipment shall be executed, in writing, directly to the Government.
C-6 PERSONNEL QUALIFICATIONS
All work shall be performed by a contractor licensed to install scheduled items in the State of Oregon. (See
FAR Clause 52-236-7 – Permits and Responsibilities – Section I).
C-7 FURNISHING OF MATERIAL
Unless otherwise stated in the specifications, Contractor shall furnish all material required for performance of the contract. All material shall comply with the specifications. Contractor shall verify the kind and amount of work that may be necessary in furnishing the material. (See Section G-3 for list of Government finished materials.) Contractor shall furnish and deliver the material to the site of the work in such a manner that their quality and fitness for the work is preserved.
C-8 FAR 52.217-7 OPTION FOR INCREASED QUANTITY SEPARATELY PRICED LINE ITEM
(MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the contractor within the performance period of the contract, unless parties otherwise agree
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
E-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.246-1 Contractor Inspection Requirements (APR 1984)
E-2 52.246-12 Inspection of Construction (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
http://www.arnet.gov/far/
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the
Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
E-3 CONFORMITY WITH PLANS AND SPECIFICATIONS
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the Plans, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is in compliance with reasonable and customary manufacturing and construction tolerances.
SECTION F--DELIVERIES OR PERFORMANCE
F-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.242-14 Suspension of Work (APR 1984)
F-2 SUSPENSIONS OF WORK OTHER THEN FOR GOVERNMENT CONVENIENCE
The Contracting Officer may issue orders to suspend the work wholly or in part for such period of time as deemed necessary because of:
(1) Weather or ground conditions when further prosecution of the work might cause environmental or resource damage to the project, access roads to the project or adjacent property. Such action would include but not be limited to instances such as siltation of streams, damage to access roads, conditions which causes otherwise suitable soils to be muddy or unsuitable at project site; or
(2) Failure of the Contractor to comply with specifications such as but not limited to exterior painting or placing of concrete at temperatures lower than those specified, performing work prior to prerequisite approvals, operating equipment not meeting fire requirements or when conditions exist which do not meet safety requirements. Whether or not a suspend work notice is issued, the Contractor shall be responsible for correcting any damage caused by its operation, whether inside or outside project limits, at no cost to the
Government. Such suspensions shall not be considered as suspensions for the Convenience of the
Government under FAR 52.242-14, Suspension of Work, and shall not qualify for an equitable adjustment.
F-3 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR
1984)
The Contractor shall be required to (a) commence work under this contract within _10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than _October 15 th
2015. The time stated for completion shall include final cleanup of the premises.
F-3 Maximum Workweek – Construction Schedule (AGAR 452.236-75) (NOV 1996)
Within seven (7) calendar days after receipt of a written request from the Contracting Officer, Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.
The maximum workweek that will be approved is Monday through Friday from 7:00 am to 7:00 pm. WORK
AT FAIRVIEW LOOKOUT CAN BE SCHEDULED BETWEEN JULY 2015 AND OCTOBER 2015. WORK
MUST BE SCHEDULED IN ADVANCE TO COORDINATE WITH FIRE CREWS AND/OR RECREATION
RESERVATIONS. WORK AT ACKER LOOKOUT MUST BE SCHEDULED BETWEEN JUNE 2015 AND
OCTOBER 2015. WORK AT ACKER LOOKOUT IS LIMITED TO ONE WEEK AND MUST BE
SCHEDULED IN ADVANCE SO THAT THE RENTAL RESERVATIONS CAN BE BLOCKED OUT.
WORK AT ACKER CANNOT BEGIN UNTIL WILDLIFE CLEARANCE IS OBTAINED FOR THE
PEREGINE FALCON. Work may be completed on weekends with prior approval of the Contracting Officer’s
Representative (COR).
SECTION G--CONTRACT ADMINISTRATION DATA
G.1 DESIGNATION OF CONTRACTING OFFICER’S REPRESENTATIVE
The Contracting Officer will designate a Contracting Officer's Representative (COR) at the time of contract award.
The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.
The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract).
On all matters that pertain to the contract terms the Contractor must communicate with the Contracting Officer.
Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the
Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.
G.2 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held after the date of contract award. The conference will be held at a mutually agreed upon location.
G-3 GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
Item No. Description Qty Location Date Available
1 Simpson CS16, galvanized
Feet
Cottage Grove
Ranger District
Office
Contact: Melissa
Swain 541-767-
09-15-2014
2 Masterflow 928
Grout
55 lb.
bag
Cottage Grove
Ranger District
Office
Contact: Melissa
Swain 541-767-
09-15-2014
SECTION H--SPECIAL CONTRACT REQUIREMENTS
H-1 Utilities
(a) Sewer: not available
(b) Water:
1. Available in reasonable quantities at Fairview Lookout.
2. Not available at Acker Rock Lookout.
(c) Electrical: available in reasonable quantities
H-2 Hazardous Conditions Safety Plan Certification
The following conditions have been identified as inherently hazardous to a degree that failure to take the proper precautions could lead to serious injury or loss of life. This listing shall not be construed as all inclusive. The
Contractor shall certify that his/her Safety Plan conforms to the requirements of OSHA. The Safety Plan certification shall be submitted prior to commencing work on the project. Appropriate actions shall be taken by the Contractor to implement this plan during performance and to take any and all other necessary steps to mitigate the dangers from hazard.
Confined space entry x Working in confined attic space
Temporary excavation/deep trenching/slope stability
Tree felling x Uneven work surfaces x Fall hazard from work heights exceeding six feet
Blasting
Traffic control on limited visibility roads
Heavy equipment operation x Suspended loads
Tree climbing and/or tower climbing
Fire hazards x Hazardous materials handling x Electrical hazard x Hydraulic and/or pneumatic and/or high pressure hazards
H-3 Product Substitution, Shop Drawings and Material Certification
(a) Product Substitution. Any modification of other items, designs, materials, products or equipment
(including Government Furnished Property or Government Furnished Material), made necessary because of a substitution, shall be the responsibility of the Contractor without adjustment in contract price or time. The
Contracting Officer's approval of any substitute will not affect the Contractor's responsibility for such modification. Any and all substitutions will be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.
(b) Shop Drawings and Submittals. The following submittals shall be submitted for approval within 10 calendar days after Notice to Proceed as required by the clause or specification unless noted elsewhere:
Submittals, Shop Drawings, Material Certifications and Testing Reports
Submit all plans, samples, schedules, certifications and product data/ literature as required by the Contract to the
COR. Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of contractor, subcontractor, supplier and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor’s stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents.
Product data and literature may include manufacturer's catalog sheets, brochures, diagrams, schedules, performance chart, illustrations and other standard descriptive data. All submitted product data and literature shall:
1. Clearly mark each copy and identify pertinent materials, products or models.
2. Show dimensions and clearances required.
3. Show performance characteristics and capacities.
4. Show wiring diagrams and controls.
Transmit submittals in electronic (PDF) format by e-mail. E-mail submittals to kabarber@fs.fed.us and jcbeagle@fs.fed.us. Notify Contracting Officer (CO) if this procedure cannot be utilized.
The electronic submittal process is not intended for color samples, color-charts or physical material samples. Mail samples and color selection data to the following location:
Attn: Kayli Barber
USDA Forest Service
2900 NW Stewart Parkway
Roseburg, OR 97471
Contractor's responsibility for deviations in submittals from requirements of contract documents are not relieved by the Government’s review of submittals. Begin no work, which requires approval or acceptance of submittals by the Government until return of one copy submittals with COR’s stamp and initials or signature indicating review approval or acceptance.
The following submittals, shop drawings, material certifications and/or testing reports are required:
Title
Referenced by Contract clause or Specification No.
Time of
Government
Approval /
Acceptance
After Submittal
Hazardous Conditions Safety
Plan, where applicable
Accident Prevention clause [FAR
52.236-13], clause H-20, and
Specification 02210.
N/A
Hazardous Spill Prevention
Plan
Landscape Preservation and
Hazardous Materials (clause H-8), and
H-32
7 days
Fire Plan R6-FS-6300-55 and
Certification that your Fire
Tools and Equipment are in full compliance with the contract requirements
R6-FS-6300-52 part 2 in Section J
N/A
Proposed Progress Schedule Schedules For Construction Contracts
[FAR 52.236-15]
N/A
Designation of Representative
R6-FS-6300-6
Superintendence By The Contractor
[FAR 52.236-6]
N/A
SF1413 - Statement and
Acknowledgement for each
Subcontractor including
Owner/Operators and other
Sole Proprietorship
Subcontractors [not required for material suppliers]
Subcontracts (Labor Standards)
[FAR 52.236-11]
N/A
Payroll Record WH347
Certified Payrolls submitted weekly
Payrolls And Basic Records [FAR
52.222-8] N/A
Product and Material
Certifications, Permits, Samples and Literature, and/or
Notifications
As required by Specifications:
06100 - CARPENTRY AND
HARDWARE
07050 – ROOF, CEILING, AND
WINDOW REPAIR MATERIALS
15600 – GAS APPLIANCES
15700 – PIPE, FITTINGS AND
ACCESSORIES
15750 – PROPANE TANKS,
REGULATORS, AND
ACCESSORIES
7 days
Contractor’s Representation & Responsibility
A. In making formal request for substitution the Contractor represents he/she:
1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.
2. Will provide same warranties and bond for substitute as for originally specified product.
3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.
4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.
5. Cost data is complete and includes related costs under the contract, but not:
a. Costs under separate contracts.
b. Contracting Officer costs for redesign or revision of contract documents.
B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.
C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.
H-6 Permits and Responsibilities (FAR Clause 52. 236-7 ) (Section I)
Contractor is responsible to comply with all codes, laws and regulations applicable to this work.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
(JUL 2013)
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUL 2013) (Applicable if contract exceeds $30,000)
52.211-18 Variation in Estimated Quantity (APR 1984)
52.217-7 Option for Increased Quantity – Separately Priced Line Item (MAR 1989)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.219-28 Post-Award Small Business Program Representation (JUL 2013)
52.222-3 Convict Labor (JUN 2003)
52.222-6 Davis-Bacon Act (JUL 2005)
52.222-7 Withholding of Funds (FEB 1988)
52.222-8 Payrolls and Basic Records (JUN 2010)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (JUL 2005)
52.222-12 Contract Termination - Debarment (FEB 1988)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (FEB 1988)
52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000)
52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if
FAR52.222-26 is included) http://www.usda.gov/procurement/policy/agar.html
52.222-36 Affirmative Action for Workers with Disabilities (OCT 2010) (Applicable if contract exceeds
$15,000)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEPT
2013)
52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011)
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual)
52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving
(AUG 2011)
52.224-1 Privacy Act Notification (APR 1984)
52.224-2 Privacy Act (APR 1984)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.228-2 Additional Bond Security (OCT 1997) (applicable if contract exceeds $30,000)
52.228-11 Pledges of Assets (JAN 2012) (Applicable if contract exceeds $30,000)
52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds
$30,000)
52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000
52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002)
52.232-23 Assignment of Claims (JAN 1986)
52.232-27 Prompt Payment for Construction Contracts (JUL 2013)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)
52.233-1 Disputes (JUL 2002)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-6 Superintendence by the Contractor (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-8 Other Contracts (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
52.236-14 Availability and Use of Utility Services (APR 1984)
52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (DEC 2013)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984)
52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts
(NOV 1996) (Applicable if contract is over $30,000)
452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996)
452.236-76 Samples and Certificates (FEB 1988)
I-2 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)
(a) Definitions. As used in this provision—
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and
Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System +4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional System for Award Management records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the System for Award Management (SAM) database” means that—
(1) The offeror has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding
Accountability and Transparency Act of 2006 (see Subpart 4.14) into the SAM database;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of
Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer
Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror’s https://acquisition.gov/far/current/html/Subpart%2032_11.html#wp1043964 https://acquisition.gov/far/current/html/Subpart%204_14.html#wp1075239 name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and
Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company Physical Street Address, City, State, and ZIP Code.
(iv) Company Mailing Address, City, State and ZIP Code (if separate from physical).
(v) Company Telephone Number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting
Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
(f) Offerors may obtain information on registration at https://www.acquisition.gov .
I-3 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)
(a) Definitions. As used in this clause—
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and
Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for
Federal contractors.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional
SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart
32.11) for the same concern.
“Registered in the System for Award Management (SAM) database” means that— http://fedgov.dnb.com/webform https://www.acquisition.gov/ https://acquisition.gov/far/current/html/Subpart%2032_11.html#wp1043964
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding
Accountability and Transparency Act of 2006 (see Subpart 4.14), into the SAM database;
(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of
Contact sections of the registration in the SAM database;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer
Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
“System for Award Management (SAM)” means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—
(1) Data collected from prospective Federal awardees required for the conduct of business with the
Government;
(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR
Subpart 4.14; and
(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.
(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(c)
(1)
(i) If a Contractor has legally changed its business name, doing business as name, or division name
(whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the
Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—
(A) Change the name in the SAM database;
(B) Comply with the requirements of subpart 42.12 of the FAR; and
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer.
The Contractor shall provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the https://acquisition.gov/far/current/html/Subpart%204_14.html#wp1075239 https://acquisition.gov/far/current/html/Subpart%204_14.html#wp1075239 https://acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217 https://acquisition.gov/far/current/html/Subpart%2042_12.html#wp1084217
Contractor indicated in the contract will be considered to be incorrect information within the meaning of the
“Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart
32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the
Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of
Payment” paragraph of the EFT clause of this contract.
(3) The Contractor shall ensure that the DUNS number is maintained with Dun & Bradstreet throughout the life of the contract. The Contractor shall communicate any change to the DUNS number to the Contracting
Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the DUNS number does not necessarily require a novation be accomplished. Dun &
Bradstreet may be contacted
(i) Via the internet at http://fedgov.dnb.com/webform or if the contractor does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.
I-4 FAR 52.215-8 ORDER OF PRECEDENCE – UNIFORM CONTRACT FORMAT (OCT 1997)
Order of Precedence—Construction Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
I-5 FAR 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS
(SEP 2010)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and https://acquisition.gov/far/current/html/Subpart%2032_8.html#wp1029202 http://fedgov.dnb.com/webform https://www.acquisition.gov/ https://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (
46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .