- RECOVERY Kuiu Bridge Rail and Running Plank Replacement Federal contract opportunity
- Solicitation number
- AG-0489-S-10-0515
About this file
Amendment 2 - Replaces worklog. The solicitation close has not been extended and remains July 8 2010 at 2 00 pm PT.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| abstract_template-kuiu_bridge_rail.pdf | ||
| AG-0489-S-10-0515_amend1.pdf | ||
| AG-0489-S-10-0515_kuiu-bridge.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 4
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
Two (2) June 22, 2010
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
US Forest Service EROC Northwest 16400 Champion Way Sandy, OR 97055
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-0489-S-10-0515 RECOVERY
Kuiu Bridge Rail and Running Plank
9B. DATED (SEE ITEM 11)
06/09/2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Amendment Two - Replaces the original Kuiu Bridge Rail and Plank Repair Work Log listed in Section J with the one attached here titled Kuiu Bridge Rail and Plank Repair Amendment Work Log
NOTE: Acknowledgement of Amendments via fax to (503) 668-1621 is acceptable.
The solicitation close has not been extended and remains July 8, 2010 at 2:00 pm PT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TONYA RYMER
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
6/22/2010 (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Kuiu Island Bridges
ROAD # MP WORK DESCRIPTION
6404 Stink Cr 40' Ham 1.221
Replace the bent terminal section on bridge approach guardrail on one corner of bridge, Method 2 (boxing glove type)
Furnish and install 4 Type 3 Object Markers and posts
6404 60' Ham 3.3
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x44"
(14), new bolts needed (40), 3/4"x 36" carriage head bolts, nuts and washers.
Furnish and install 4 Type 3 Object Markers and posts
6404 3.492 Furnish and install 4 Type 3 Object Markers and posts
6404 3.68 Furnish and install 4 Type 3 Object Markers and posts
Furnish and place 20 CY Class 5 riprap at upstream right wingwall corner
6404 3.809 Furnish and install 4 Type 3 Object Markers and posts
6402 2.474
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x48"
(14), new bolts needed (40), 3/4"x 36" carriage head bolts, nuts and washers.
Furnish and install 4 Type 3 Object Markers and posts
6402 4.847 Furnish and install 4 Type 3 Object Markers and posts
6402 76' 7.449
Replace untreated wear surface planks with new planks, 16'w x 76' long, 3"x12" planks
Furnish and install 4 Type 3 Object Markers and posts
6402 48' 11.027
Replace untreated wear surface planks with new planks, 16'w x 48' long, 3"x12" planks
Furnish and install 4 Type 3 Object Markers and posts
Replace split treated block, 12"x12"x24", furnish and install new hardware, 2 ‐ 3/4"x34" carriage bolts, nuts, washers
6402 100' 12.937
Replace untreated wear surface planks with new planks, 16'w x 100' long, 3"x12" planks
Furnish and install 4 Type 3 Object Markers and posts
Replace 2 treated curb blocks, 12"x12"x30", furnish and install new hardware, 2 ‐ 3/4"x34" carriage bolts, nuts, washers
Kuiu Bridge Rail and Plank Repair Ammendment Worklog
Kuiu Bridge Rail and Plank Repair Ammendment Worklog
6402 85' 16.675
Replace untreated wear surface planks with new planks, 16'w x 85' long, 3"x12" planks
Furnish and install 4 Type 3 Object Markers and posts
Raise the bull rails on bridge by adding new treated 8"x12" spacer blocks, will require removing bull rails. Block size needed 8"x12"x48"
(22), new bolts needed (88), 3/4"x 32" carriage head bolts, nuts and washers.
6402 30' 20.255
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x48"
(10), new bolts needed (26), 3/4"x 34" carriage head bolts, nuts and washers.
Furnish and install treated 4"x12" planks in middle of treated bridge deck, 19" wide along full length of bridge.
Replace untreated wear surface planks with new planks, 16'w x 30' long, 3"x12" planks
6402 56' 20.823
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x36"
(18), new bolts needed (44), 3/4"x 34" carriage head bolts, nuts and washers.
Replace untreated wear surface planks with new planks, 16'w x 56' long, 3"x12" planks
6402 22.374 Furnish and install 4 Type 3 Object Markers and posts
6402 120' 26.957
Furnish and install treated 4"x12" planks in middle of treated bridge deck, 19" wide along full length of bridge.
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x48"
(28), new bolts needed (78), 3/4"x 34" carriage head bolts, nuts and washers.
Replace untreated wear surface planks with new planks, 16'w x 120' long, 3"x12" planks
Furnish and install 4 Type 3 Object Markers and posts
6425 0.04 Furnish and install 4 Type 3 Object Markers and posts
6425 1.795 Furnish and replace an 11' segment of 12" w‐beam guardrail
Kuiu Bridge Rail and Plank Repair Ammendment Worklog
6407 2.011
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x38"
(24), new bolts needed (48), 3/4"x 34" carriage head bolts, nuts and washers.
6407 2.725 Furnish and install 4 Type 3 Object Markers and posts
6407 5.257
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x38"
(26), new bolts needed (52), 3/4"x 34" carriage head bolts, nuts and washers.
Furnish and install 4 Type 3 Object Markers and posts
6437 0.928
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x48"
(18), new bolts needed (50), 3/4"x 34" carriage head bolts, nuts and washers.
Furnish and install 4 Type 3 Object Markers and posts
6415 1.087 Furnish and install 4 Type 3 Object Markers and posts
6415 8.997 Furnish and install 4 Type 3 Object Markers and posts
6415 60' 16.08
Raise the bull rails on bridge by adding new treated 4"x12" spacer blocks, will require removing bull rails. Block size needed 4"x12"x36"
(16), new bolts needed (64), 3/4"x 28" carriage head bolts, nuts and washers.
6415 100' 18.28
Furnish and install new untreated wear surface 16' wide x100' long
3"x12" planks and 4 new bridge object markers and posts