amendment 01.rtf

RTF text file 113 KB Posted

Attached to
RECOVERY - Tinkham CG Loop Rd/Area Repair Federal contract opportunity
Solicitation number
AG-0489-S-10-0441
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Amendment 01

Text of this file

Solicitation No. AG-0489-S-10-0441 , Amendment No. 1 Page 2 of 2

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE

PAGE OF PAGES

2 AMENDMENT NO.

1 (ONE)

3. EFFECTIVE DATE

05/13/2010

4. REQUISITION/PUCHASE REQ. NO.

5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE

7.ADMINISTERED BY (if other than item 6) CODE

EROC - NW

Mt Hood National Forest 16400 Champion Way Sandy, OR 97055

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) X 9A.Amend Solicitation No. AG-0489-S-10-0441

X 9B.Dated 04/13/2010

10A.Mod Contract/Order #

10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[X] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ X ] is extended [ ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority) The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible) Tinkham CG Loop Road Area Repair, Mt Baker-Snoqualmie National Forest

See attached ARRA sign information.

The date for receipt of offers is extended to 5/21/2010.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Ellen Holroyd, Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED

16B.UNITED STATES OF AMERICA

By/s/ Ellen Holroyd (Signature of Contracting Officer)

16C.DATE SIGNED

5/13/2010 Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

American Recovery and Reinvestment Act Sign Guidance On March 3, 2009 President Obama made the commitment that all projects funded by the American Recovery and Reinvestment Act (ARRA) will bear a recovery emblem to make it easier for Americans to see which projects are funded by the ARRA. The Federal Highway Administration has developed an ARRA sign that bears the recovery emblem and the logo of the agency with jurisdiction over the project that meets U.S. Forest Service sign policy, including compliance with the Manual of Uniform Traffic Control Devices (MUTCD). The sign has been modified to include the Forest Service shield and to provide a smaller size sign for use on road projects where speeds are lower and on non-road projects. The following factors should be considered with respect to design and placement of these signs:

Sign Design:

All economic recovery sign design layout and color should be similar to the sign design attached with this guidance.

Sign Placement:

With respect to placement of traffic control signs, regulatory, warning, and guide signs have a higher priority than the economic recovery signs.

In no case shall these signs be placed such that it obscure road users' view of other traffic control devices.

Economic recovery signs should be placed where they can be easily identified with the corresponding projects.

If the placement of economic recovery signs conflicts with newly installed higher priority signs, or traffic signals, or temporary traffic control devices, or other priority devices, the economic recovery sign should be relocated.

Due to public safety concerns, economic recovery signs should not be allowed at the following locations:

On the front, back, adjacent to or around any traffic control device, including traffic signs, signals, changeable message signs, traffic control device posts or structures, or bridge piers.

At key decision points where a driver's attention is more appropriately focused on traffic control devices, roadway geometry, or traffic conditions. These locations include, but are not limited to exit and entrance ramps, intersections controlled by traffic signals or by stop or yield signs, highway-rail grade crossings, and areas of limited sight distance.

See http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf" http://www.fhwa.dot.gov/economicrecovery/arrasigndetail.pdf for sign detail.

Other files for this federal contract opportunity

Other files attached to RECOVERY - Tinkham CG Loop Rd/Area Repair, newest first.
File Type Posted
TINKHAM-CONSTRUCTION DETAILS5.pdf PDF
TINKHAM CG VICINITY MAP-VICINITY MAP2.pdf PDF
TINKHAM CG GEN NOTES3.pdf PDF
WA1_dvb_2.doc DOC document
TINKHAM CG TITLE SHT-TITLE SHEET1.pdf PDF
Tinkham_RFQ.doc DOC document
TINKHAM CG —
3 fire clauses.doc DOC document
Experience Questionnaire.doc DOC document
sf25a_e.pdf PDF

On GovTribe

Work with this file on GovTribe