SOL S-10-0367 FINAL WALLA BRIDGE.doc

DOC document 496 KB Posted

Attached to
RECOVERY - Walla Walla Trail Bridges Federal contract opportunity
Solicitation number
AG-0489-S-10-0367
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Walla Walla Trail Bridges, newest first.
File Type Posted
BearCr_BridgeTitleSh.pdf PDF
NFsh4.pdf PDF
BCsh4.pdf PDF
BCsh2.pdf PDF
NFsh2.pdf PDF
sfww_ARRA_wwbridge_bw.pdf PDF
BCFinalSh3.pdf PDF
NFsh3.pdf PDF
NFTitle_Sh.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-0489-S-10-0367

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

APRIL 13, 2010

PAGE OF PAGES

1 of

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

379141

6. PROJECT NO.

7. ISSUED BY

CODE

0489
8. ADDRESS OFFER TO

EROC NW- CONTRACTING OFFICE

16400 CHAMPION WAY

SANDY, OR 97055

EROC NW- CONTRACTING OFFICE

16400 CHAMPION WAY

SANDY, OR 97055

9. FOR INFORMATION

CALL:

A. NAME

TONYA RYMER OR M. DEVRIES

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 503-668-1689 /1707

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

TAS:: 12 1102::TAS RECOVERY

WALLA WALLA TRAIL BRIDGES

UMATILLA NATIONAL FOREST

This solicitation is issued under the provisions of the AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009.

Provide all labor, materials, supplies to complete bridge replacement per specifications contained in this contract.

Construction Period - Notice to Proceed through 457 days.

GOVERNMENT ESTIMATE OF MAGNITUDE $100,000 to $250,000 (BASE & OPTION ITEMS) Proposals due : MAY 13, 2010 - 4 PM - PACIFIC STANDARD TIME

Technical questions may be addressed to COR – STEVE ANDERSON at 1-509-522-6041.

This contract is open to contractors under the Small Business Competitive Demonstration Program. FAR 19.10 applies.

NOTE: Bid bonds must be original and received by time of solicitation closing. Bid bonds are not required under $100,000.

11. The Contractor shall begin performance within 10 calendar days and complete it within 457 calendar days after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See F.2 .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A.

Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:00 p.m. (hour) local time, MAY 13, 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B.

An offer guarantee

FORMCHECKBOX

is, FORMCHECKBOX is not required.

C.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D.

Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA

FAR (48 CFR) 52.236-1(e) OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE

FACILITY CODE

17.

The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c)( )

FORMCHECKBOX

41 U.S.C. 253(c)( )

26. ADMINISTERED BY

CODE

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _1__ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated

STANDARD FORM 1442 BACK (REV. 4-85)

Part 1 – The Schedule

Section B – Supplies or Services and Prices/Costs

Walla Walla Trail Bridges Construction

UMATILLA COUNTY, OR

BASE ITEM: Bear Creek Bridge

Pay Item
Description
MM
Quantity
Unit
Rate/Unit
Total
15101A
Mobilization
LSQ
L.S.
1
26001A
Geocell abutment stabilization, 6 inch depth
DQ
SY
4

57101A

Prefabricated bridge superstructure – design, fabricate, transport, and install
LSQ
L.S.

57106A Bridge substructure, geocell abutments

LSQ
L.S.

OPTION ITEM A: NF Walla Walla Bridge

Pay Item
Description
MM
Quantity
Unit
Rate/Unit
Total
15101B
Mobilization
LSQ
L.S.
1
20304
Removal of structures and obstructions (native log, all spans and substructures)
LSQ
L.S.
1
26001B
Geocell abutment stabilization, 6 inch depth
DQ
SY
4
55701B
Prefabricated bridge superstructure – design, fabricate, transport, and install
LSQ
L.S.
1

57106B Bridge substructure, geocell abutments

LSQ
L.S.
Vendor Name:
Phone
Signature:
Fax
Address:
Email
City, State, Zip:
TIN#

Duns#

SECTION C - DESCRIPTION OF WORK

C.1 DESCRIPTION OF WORK:

The intent and purpose of this contract is the procurement and installation of the Bear Creek Bridge Replacement - The Contractor shall furnish all necessary labor, materials, equipment, transportation and supervision to procure and install the Bear Creek Bridge on Trail Number 3225. Work includes, but is not limited to the minor site preparation and installation of a new, untreated bridge at the designated site and reshaping the approaches to blend with the finished bridge elevation. The old bridge has been removed and the site is accessible for installation.

Option Item A

NF Walla Walla Bridge Replacement - The Contractor shall furnish all necessary labor, materials, equipment, transportation and supervision to remove the existing NF Walla Walla River Bridge on Trail Number 3222, procure and install a new untreated bridge. Work includes, but is not limited to the minor site preparation after removal of the existing bridge, and installation of a new, untreated bridge at the designated site and reshaping the approaches to blend with the finished bridge elevation.

C.2 PROJECT LOCATION:

The Bear Creek Bridge Replacement: the project is located on the Walla Walla Ranger District of the Umatilla National Forest. Take Washington Highway 125 South from Walla Walla, WA toward Milton-Freewater, OR. Washington Highway 125 becomes Oregon Highway 11 at the Stateline. At the south end of Milton-Freewater, turn left and follow the Walla Walla River Road to Harris County Park, approximately 11 miles. Approximately 0.75 beyond Harris county Park is the BLM SF Walla Walla River Trailhead and the beginning of Trail # 3225, SF Walla Walla Trail. Follow the trail approximately 4.2 miles upstream (motorcycle, foot, mtn. bike, horse only) to the Junction of Trail # 3223 Table Sprs.-Bear Cr. The Bear Creek bridge replacement site is visible from the junction.

The NF Walla Walla Bridge Replacement is located as follows. There are two ways to access the NF Walla Walla Bridge Replacement site. Take Trail # 3223 from the jct. with Trail #3225 for approximately 2.3 miles to Cub Saddle. Follow Trail #3222 North out of the saddle for approximately 3.9 miles to the site. Alternatively, take the Mill Creek Road from the East end of Walla Walla approximately 14 miles to FSR 65, Tiger Canyon Road. Turn right and follow FSR 65 approximately 7.5 miles to Tiger Saddle and the jct. with FSR 6511. Turn right and follow FSR 6511 approximately 2 miles to the jct. with Trail # 3224 on the left. Follow Trail #3224 downhill to the jct. with Trail # 3222, and turn right. Follow Trail # 3222 down canyon to the NF Walla Walla Bridge site.

C.3 PRICE RANGE: Between $100,000-$250,000 (Base and Option Items) C.4 TECHNICAL CONTACT: Steve Anderson, Trail Coordinator, (509)522-6041.

C.5 MEASUREMENT AND PAYMENT

a) Refer to Standard Specification 109 for details on measurement and payment.

C.6 SAFETY

The contractor shall provide the crew with proper safety equipment, which includes, but is not limited to: Hardhats, hearing protection, eye protection, gloves, chaps, nonskid boots, etc.

The Contractor and the Contractor’s employees shall adhere to all safety regulations and guidelines applicable to this type of work. It is the contractor’s responsibility to know what safety regulations and guidelines are applicable to this type of work. The Contractor shall provide a written, job-specific safety plan for the inherently hazardous conditions that exist during operations. The Contractor’s safety plan shall identify and describe any inherently hazardous conditions and specific actions to reduce these hazards. This plan shall be provided to the Contracting Officer at the pre-work conference. Work shall not commence on this project if the Contractor fails to provide a safety plan. Inherently hazardous conditions that could lead to serious injury or loss of life are lacerations from saws, slips and trips from uneven terrain, hidden obstacles of slope of ground, driving and weather conditions. These are not inclusive.

C.7 PERFORMANCE REQUIREMENTS

a. Adhere to all Standard Specifications, Special Project Specifications, and Drawings for the Construction.

b. Communicate with the CO and COR as to progress, location, and completion of items.

c. Adhere to all Contract Requirements listed herein.

d. Adhere to all requirements of Region 6 Fire Protection Requirements.

C.8

APPLICABLE SPECIFICATIONS

STANDARD SPECIFICATION FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03 Customary Units shown in the specification listing and attached to the contract are applicable to this contract. All specifications not included in the specification listing, but referenced by listed specifications, are applicable.

STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-03

SPECIFICATION LIST

Project Name: Walla Walla Trail Bridges Date Prepared: 01/13/10 Page: 1 of 1

Spec. No
Item Description
Latest Rev.

Drawing Number

101
TERMS, FORMAT, AND DEFINITIONS
2003
102,103
BID, AWARD, EXECUTION OF CONTRACT, SCOPE OF WORK
2003
104
CONTROL OF WORK
2003
105
CONTROL OF MATERIALS
2003
106
ACCEPTANCE OF WORK
2003
107
LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
2003
108
PROSECUTION AND PROGRESS
2003
109
MEASUREMENT AND PAYMENT
2003
150
MOBILIZATION
2003
203
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
2003
204
EXCAVATION AND EMBANKMENT
2003
208
STRUCTURE EXCAVATION AND BACKFILL FOR SELECTED MAJOR STRUCTURES
2003
557
TIMBER STRUCTURES
2003
629
ROLLED EROSION CONTROL PRODUCTS AND CELLULAR CONFINEMENT SYSTEMS
2003

Special Project Specification

736.01 Geocell.

Furnish geocell material consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.), connected in series at off-set, full-depth ultrasonic seams aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill material is placed.

736.02 Requirements. Furnish geocells consisting of polyethylene material treated to resist ultraviolet degradation and conforming to the requirements shown in table 736-1.

Table 736-1 – requirements for geocells.

Density
ASTM D 1505
0.935 to 0.965 g/cm3 (58.4 to 60.2 pounds per cubic foot).
Environmental Stress Crack Resistance
ASTM D 1693
3000 hour
Strip Sheet Thickness
ASTM D 5199
1.27 mm (50 mil), minus 5 percent, plus 10 percent. Determine thickness in the flat before any surface texturing or other surface disruption.
Short-term peel strength
U.S. Army Corps of Engineers Technical Report GL-86-19, Appendix A
2000 N (450 pound) minimum for 203 mm (8.0 inch) depth cell
Seam Hang Strength
101.6 mm (4”) weld joint supporting load of 72.5 kg (160 pounds)

or

101.6 mm (4”) weld joint supporting load of 72.5 kg (160 pounds) while undergoing temperature change from 23O C to 54O C (74O F to 130O F) on 1 hour cycles.

30 days minimum

7 days minimum

Special Project Specification

Section 260 - Geocell Abutment Stabilization

Description

260.01 Work. Construct geocell abutment stabilization at each abutment using Presto Geoweb Cellular Confinement System, Webtec TerraCell, or approved equal in accordance with the plans and manufacturers recommendations.

Materials

260.02 Requirements. Ensure that material conforms to specifications in the following subsections:

Coarse Granular Backfill

703.03

Geocell

Geotextile, Type IV (A,B,C,D,E, or F)

714.01

Construction

260.03 General. Perform the work specified in Section 206. Use ditches, grading or similar methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.

260.04 Geotextile Installation. Place the geotextile according to Section 221 or AS SHOWN ON THE DRAWINGS. Ensure that the surface upon which the geotextile is to be placed is uniform and is reasonably smooth and free of obstructions, depressions, and debris that could damage the geotextile. Have the surface approved by the CO prior to placing geotextile.

Lay the geotextile without tension, stress, wrinkles or creases. Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.

Have the installed geotextile approved by the CO prior to setting the geocells.

260.05 Geocell Installation. Place the geocell sections directly on the prepared subgrade. Expand the geocell sections into position at the grades and lines AS SHOWN ON THE DRAWINGS. Hold the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the geocell manufacturer prior to filling. Ensure that the individual cells have been expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines SHOWN ON THE PLANS.

Connect geocell panels in accordance with the manufacturer’s recommendations.

260.06 Infill Placement. Furnish the CO with the manufacturer’s specific recommendations for backfilling prior to placement of the geocells.

Place coarse granular backfill meeting subsection 703.03 into the expanded cells with equipment appropriate for the site conditions such as a backhoe or a front-end loader. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls.

Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. A front-end loader may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material. Compact the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell until visible deformation of the infill ceases. Make at least three complete passes. Grade the surface to be ½ inch above the top of the cells. Ensure that the cell walls are not exposed after fine grading is completed.

Use the geocell manufacturer’s specific recommendations for backfilling if they are more stringent than stated above.

Measurement

260.07 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment will be based on the contract unit price of geocell material placed and accepted. This will be exclusive of wastage and material placed outside the neat lines SHOWN ON THE PLANS.

Payment

260.08 Basis. The accepted quantities will be paid for at the contract unit price for the PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.

The cost for furnishing and placing the Coarse Granular Backfill required for geocell infill is incidental to this pay item and no separate payment will be made.

The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.

Payment will be made under:

Pay Item

Pay Unit

260 (01) Geocell abutment stabilization, __inch depth

Square Yard

Section 726 - Geocell Furnish geocell panels consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.). which are connected in series at off-set, full-depth ultrasonic seams, aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill materials can be placed.

Ensure that the polyethylene material used to fabricate the geocell sections is treated to resist ultraviolet degradation and that it conforms to the following:

(a) Density ………………………… 0.935-0.965 g/cm3 per ASTM D1505

(b) Environmental Stress

Crack Resistance (ESCR) ……… 2000 hour per ASTM D1693 Use strips with a sheet thickness, of 1.27 mm -5% +10% (50 mil -5% +10%) tested per ASTM D5199. Thickness shall be determined in the flat, before any surface texturing or other surface disruption.

Ensure that cell seam strength is uniform over the full depth of the cell. Test short-term peel strength per U.S. Army Corps of Engineers Technical Report GL-86-19, Appendix A. Provide a minimum seam peel strength of 2000 N (450 lb) for the 203 mm (8.0 in) depth cell.

Test seam hang-strength for a period of 30 days minimum at room temperature. Room temperature is defined in ASTM E41. Use test samples made by welding two 102 mm (4 in) wide polyethylene strips together. Ensure that a test sample consisting of two carbon black stabilized strips supports a 72.5 kg (160 lb) load for the test period and that a test sample consisting of carbon black stabilized strip and a HALS stabilized strip supports a 63.5 kg (140 lb) load for the test period.

Furnish the CO with a certificate signed by a legally authorized official from the company that manufactured the geocell. Ensure that the certificate attests that the geocell meets the chemical, physical, material and manufacturing requirements stated in the specification. When requested by the CO, furnish a sample of the geocell from each lot for verification testing.

During shipment and storage, wrap the geocell in heavy-duty protective covering. Protect the geocell from mud, soil, dust, debris and sunlight prior to installation.

The following products meet this specification:

GEOWEB manufactured by Presto Products Company, P.O. Box 2399, Appleton, WI 54913-2399, telephone 920-738-1222.

TERRACELL manufactured by Webtec, Inc., P.O. Box 19729, Charlotte, NC 28219, telephone 704- 398-0954.

Table of Contents

11Table of Contents

Preface 101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations.

101.04 Definitions.

102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract 103 - Scope of Work Deletions 104 - Control of Work Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources.

105.02(a) Government-provided sources.

105.05 Use of Material Found in the Work.

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims.

107.06 Contractor’s Responsibility for Work.

107.09 Legal Relationship of the Parties.

107.10 Environmental Protection.

108 - Prosecution and Progress 108 Delete.

109 - Measurement and Payment 109 Deletions

109.02 Measurement Terms and Definitions.

155 - Schedules for Construction Contracts 155 Delete.

203 – Removal of Structures and Obstructions 203.03 Salvaging Material.

203.05 Disposing of Material.

260 - Geocell Abutment Stabilization 552 - Structural Concrete

552.02 Add the following:

553.03 Composition (Concrete Mix Design).

552.08 Delivery.

553.09 Quality Control of Mix.

552.11 Handling and Placing Concrete.

552.12 Construction Joints.

552.18 Loads on New Concrete Structures.

555 - Steel Structures

555.18 Welding.

555.19 Erection.

571 - Prefabricated Bridges 726 - Geocell

Preface

Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

· Exact time and location of spill including a description of the area involved.

· Containment procedures.

· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

203 – Removal of Structures and Obstructions

203.03 Salvaging Material.

Delete this subsection and add the following:

Salvage, with reasonable care, all material designated to be salvaged. Unless shown on the plans, salvage all large diameter logs (greater than 12 inches in diameter), and place them in the channel as directed. Collect as much hardware as possible during removal operations or after burning in accordance with subsection 203.05(b), and remove hardware from the project in accordance with subsection 203.05(a). Salvage existing concrete aprons, where they exist. Where the concrete is unsupported and easily broken, break the material into smaller chunks (12 – 24 inches on a side) and maneuver material into the most stable position possible; bury or cover visible concrete as much as possible, in accordance with subsection 203.05(c)

203.05 Disposing of Material.

Delete this subsection and add the following:

Dispose of debris and unsuitable and excess material as follows:

(a) Remove from project. Recycle or dispose of all collected hardware from log bridge removal operations at all sites, and remove all dimensioned (sawn) lumber from wilderness sites by packing or flying it out. Remove materials off National Forest System Lands. Recycle materials wherever possible. Furnish a statement documenting the nature and quantity of material processed or sold for recycling or disposal.

(b) Burn. Where shown on plans, burn railing, posts, and planking.. Coordinate burning operations with the District Fire Management Organization. Obtain necessary burning permits. Furnish a copy of the burning permits before burning begins.

Burn using high intensity burning processes that produce few emissions. Examples include incinerators, high stacking, or pit and ditch burning with forced air supplements. Provide a competent watchperson during the burning operations.

When burning is complete, extinguish the fire so no smoldering debris remains. Dispose of unburned material according to (a) above.

(c) Bury. Cover the salvaged concrete aprons with boulders that are available on-site. Maneuver boulders to cover visible concrete as much as possible. Boulders can be placed up to one foot in front of the concrete apron adjacent to the stream; align boulders with the natural bank/edge of water to prevent constriction of the flow under the bridge.

Section 260 - Geocell Abutment Stabilization

Description

260.01 Work. Construct geocell abutment stabilization at each abutment using Presto Geoweb Cellular Confinement System, Webtec TerraCell, or approved equal in accordance with the plans and manufacturers recommendations.

Materials

260.02 Requirements. Ensure that material conforms to specifications in the following subsections:

Coarse Granular Backfill

703.03

Geocell

Geotextile, Type IV (A,B,C,D,E, or F)

714.01

Construction

260.03 General. Perform the work specified in Section 206. Use ditches, grading or similar methods to prevent surface runoff that may occur during inclement weather from ponding in the foundation excavation.

260.04 Geotextile Installation. Place the geotextile according to Section 221 or AS SHOWN ON THE DRAWINGS. Ensure that the surface upon which the geotextile is to be placed is uniform and is reasonably smooth and free of obstructions, depressions, and debris that could damage the geotextile. Have the surface approved by the CO prior to placing geotextile.

Lay the geotextile without tension, stress, wrinkles or creases. Sew or overlap adjacent strips a minimum of 12” at joints. Insert securing pins through both strips of overlapped geotextile at minimum intervals of 3 feet, but no closer than 2 inches to each edge, to prevent the geotextile from being displaced.

Have the installed geotextile approved by the CO prior to setting the geocells.

260.05 Geocell Installation. Place the geocell sections directly on the prepared subgrade. Expand the geocell sections into position at the grades and lines AS SHOWN ON THE DRAWINGS. Hold the expanded geocell sections with suitable “stretcher frames”, steel stakes driven inside selected outer cell walls, or other similar methods as allowed by the geocell manufacturer prior to filling. Ensure that the individual cells have been expanded to the minimum dimensions required by the manufacturer. If necessary field cut sections as per the manufacturer’s recommendations to the lines SHOWN ON THE PLANS.

Connect geocell panels in accordance with the manufacturer’s recommendations.

260.07 Infill Placement. Furnish the CO with the manufacturer’s specific recommendations for backfilling prior to placement of the geocells.

Place coarse granular backfill meeting subsection 703.03 into the expanded cells with equipment appropriate for the site conditions such as a backhoe or a front-end loader. Do not drop infill material more than 3 feet to avoid damage or displacement of the cell walls.

Overfill the geocell cells and level to a minimum of 2 inches above the top of the cell walls. A front-end loader may be used to place the infill provided that it only traffics above geocell sections that have been filled and covered with the minimum 2 inches of additional material. Compact the infill material with a vibratory plate compacter. Operate compaction equipment over the full width of the geocell until visible deformation of the infill ceases. Make at least three complete passes. Grade the surface to be ½ inch above the top of the cells . Ensure that the cell walls are not exposed after fine grading is completed.

Use the geocell manufacturer’s specific recommendations for backfilling if they are more stringent than stated above.

Measurement

260.07 Method. Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF ITEMS.

Payment will be based on the contract unit price of geocell material placed and accepted. This will be exclusive of wastage and material placed outside the neat lines SHOWN ON THE PLANS.

Payment

260.08 Basis. The accepted quantities will be paid for at the contract unit price for the PAY ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.

The cost for furnishing and placing the Coarse Granular Backfill required for geocell infill is incidental to this pay item and no separate payment will be made.

The cost for furnishing and placing geotextile for the geocell installation is incidental to this pay item and no separate payment will be made.

Payment will be made under:

Pay Item

Pay Unit

260 (01) Geocell abutment stabilization, __inch depth

Square Yard

552 - Structural Concrete 552.02_nat_us_06_20_2007

Material

552.02 Add the following:

Anchor bolts 717.01

Dowels 717.17

Epoxy resin adhesives 725.21

High strength non-shrink grout 701.02

Mortar 701.02

Portland cement 701.01

Sealants, fillers, seal, and sleeves 712.01

Construction Requirements

553.03 Composition (Concrete Mix Design).

Delete Tables 552-1, 2, and 3 and replace with the following:

Table 552-1

Composition of Concrete

Class of Concrete
Minimum Cement Content

(pound per cubic yard)

Maximum W/C Ratio
Slump (1)

(inches) Maximum Nominal Coarse Aggregate

Size (5) (inches)

A
611
0.49
2 to 4
1½
A(AE)
611
0.44
1 to 4
1½
B
517
0.58
2 to 4
2½
B(AE)
517
0.58
2 to 4
2½
C
658
0.49
2 to 4
¾
C(AE)
658
0.44
1 to 3
¾
D(AE)(2)
611
0.40
1 to 3
1½
E(AE)(3)
611
0.40
4 to 6 (4)
¾
P (Prestressed)
658
0.44
0 to 4
1
P(AE)
658
0.44
0 to 4
1
Seal
658
0.54
4 to 8
1½

(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.

(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.

(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.

(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.

(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.

(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.

Table 552-2

Minimum Air Content for Air Entrained Concrete

Nominal Maximum

Aggregate Size (1) As Delivered Minimum Air Content (2) (3) (%)

2½ inch
3.5
2 inch
3.5
1½ inch
4.0
1 inch
4.5
¾ inch
4.5
½ inch
5.5

(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.

(2) These air contents apply to the total mix. When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.

(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %

Table 552-3

Required Average Compressive Strength (1) Specified Compressive Strength (f’c)

(psi) Required Average Compressive Strength (f’cr)

(psi)

Less than 3000
f’c + 1000
3000 to 5000
f’c + 1200
Over 5000
1.10f’c + 700

(1) Use this table when there is not enough data available to establish a standard deviation

Delete the first paragraph after Table 552-2 and replace with the following:

Submit written concrete mix designs for approval at least 30 calendar days before production.

Add the following under the list of items to be included in the mix design submittal:

(y) Evaluation of potential aggregate reactivity

552.08 Delivery.

(a) Truck mixer/agitator.

Add the following:

Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.

553.09 Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.

552.11 Handling and Placing Concrete.

Add the following after the forth paragraph:

Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.

552.12 Construction Joints.

Add the following at the end of the first paragraph:

Provide form cleanout ports at construction joints.

552.18 Loads on New Concrete Structures.

Add the following paragraph:

Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.

555 - Steel Structures

555.18_nat_us_07_03_2007

Construction Requirements

555.18 Welding.

Add the following at the start of the first sentence.

"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... "

Delete the first paragraph of this section and replace with the following:.

555.19 Erection. Construction temporary supports for erection in accordance with Section 562.

Add the following section:

571 - Prefabricated Bridges

Description

571.01 This work consists of designing, fabricating, delivering, and installing a prefabricated timber trail bridge superstructures. Delivery includes helicopter transport of components to project sites and may include the use of a helicopter to set primary structural members, as large equipment access is not allowed.

Materials

571.02 Requirements. Furnish materials that meet the requirements specified in the following sections:

Bridge Railing
556
Structural Metal
717
Reinforcing Steel
554
Steel Structures
555
Structural Concrete
552
Timber Structures
557
Material for Timber Structures
716

Concrete compressive strength, structural steel tensile strength, finish and designation, timber species, grade, and treatment, and other material specifications shall be as required or if not listed in the contract documents, take them from the manufacturer’s drawings, and have them approved by the CO prior to fabrication.

Construction Requirements

571.03 Design Requirements. For required design standards, as well as use the most recent AASHTO “Standard Specifications for Highway Bridges”.

When design of the structure is required, submit plans and calculations signed by a professional engineer registered in the state where the bridge will initially be located or in the state where the fabricator’s offices are located.

Use durable materials to allow transportation and installation without using specialized construction equipment. Design bridges to allow transportation by helicopter or pack animals and complete construction by manual labor. Use design techniques and fabrication methods to minimize field installation difficulties. Fabricate primary components from timber.

571.04 Design Drawings. Submit design drawings, calculations, and/or shop drawings at least 30 days in advance of the start of fabrication to allow time for review and correction of any changes and approval by the CO. Include plan, elevation, and section views of the timber bridge superstructure, dimensions of all components, welding and connection details, and general and specific notes regarding design and construction.

571.05 General. Perform excavation, backfill, and embankment work under Sections 204 and 209.

Dispose of all debris resulting from operations in accordance with Section 203 or as shown on the plans..

571.06 Performance. Notify the CO at least 7 days before delivering the bridge and after approval of the Aviation Schedule.

Install prefabricated primary superstructure components immediately upon delivery to the project site. Support and stack all minor components not immediately installed to prevent damage. Furnish and install blocking to support all components at least 12 inches above the ground.

Furnish all tools, devices, special equipment, and material needed for installation in well-marked watertight containers suitable for long-term, outdoor storage.

571.07 Abutments and Approaches. Construct required abutments, bearings, and caps according to Division 550. Construct approaches, including excavation, backfill, and geotexiles, according to sections 204 and 209.

571.08 Contractor-Furnished Prefabricated Bridge Superstructure.

(a) Furnish the following items for approval 21 days prior to fabrication of the bridge components:

(1) Complete design calculations, including all assumptions and references to design standards. Calculations are to be completed by or under the direct supervision of a Professional Engineer registered in the state where the bridge will be located or the primary structural components fabricated. Supply calculations in a calculation book, complete with an index. Stamp the front cover of the calculation book using the seal of the professional engineer who performed or otherwise directly supervised and reviewed the calculations, as licensed in the state where the bridge will be located or the primary structural components fabricated.

(2) Complete installation instructions and shop drawings. Provide drawings that are black line, of reproducible quality, on ANSI sheet size D (24 inches by 36 inches) and that are stamped by a Professional Engineer registered in the state where the bridge will be located or the primary structural components fabricated. Furnish the same information in an approved electronic format (Portable data format, .pdf)

(b) Furnish the following items for approval 14 days prior to delivery of the bridge components:

(1) Supplier or inspection agency certification of wood species and grade of all timber and a conformance certificate for all sawn and glued laminated members.

(2) Certification of structural steel, fasteners, and hardware.

(3) Certification of galvanizing process used.

(4) Steel fabricator certification that steel fabrication and quality control meet the requirements of the AISC Code of Standard Practice; and that all welding meets the requirements of ANSI/AASHTO/AWS D 1.5 Bridge Welding Code.

(5) A complete list of all bridge components, hardware, and fasteners.

Tag each major component of the bridge superstructure with the same project identification number in a location that is clearly visible, both when stacked in storage and erected at the site. Ensure that each bridge is packaged separately and clearly identified to avoid misdelivery.

Assemble the bridge superstructure prior to delivery to assure proper fit-up of all components. Notify the CO of the assembly 7 days before assembly.

571.09 Acceptance. Furnish a production certification for timber, including glued-laminated lumber, structural steel, and fabricated steel. Furnish a certification for all fasteners, hardware, and the galvanizing processes.

Measurement

571.10 Measure the Section 571 items listed in the bid schedule according to Subsection 109.02.

Payment

571.11 The accepted quantities, measured as provided in Subsection 109.02 and above, will be paid at the contract price per unit of measurement for the Section 571 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.

Section 726 - Geocell Furnish geocell panels consisting of sheet strips fabricated from high-density polyethylene (H.D.P.E.). which are connected in series at off-set, full-depth ultrasonic seams, aligned perpendicular to the longitudinal axis of the strips. When expanded, the interconnected strips form the walls of a flexible, three-dimensional cellular confinement structure into which the specified infill materials can be placed.

Ensure that the polyethylene material used to fabricate the geocell sections is treated to resist ultraviolet degradation and that it conforms to the following:

(a) Density ………………………… 0.935-0.965 g/cm3 per ASTM D1505

(b) Environmental Stress

Crack Resistance (ESCR) ……… 2000 hour per ASTM D1693 Use strips with a sheet thickness, of 1.27 mm -5% +10% (50 mil -5% +10%) tested per ASTM D5199. Thickness shall be determined in the flat, before any surface texturing or other surface disruption.

Ensure that cell seam strength is uniform over the full depth of the cell. Test short-term peel strength per U.S. Army Corps of Engineers Technical Report GL-86-19, Appendix A. Provide a minimum seam peel strength of 2000 N (450 lb) for the 203 mm (8.0 in) depth cell.

Test seam hang-strength for a period of 30 days minimum at room temperature. Room temperature is defined in ASTM E41. Use test samples made by welding two 102 mm (4 in) wide polyethylene strips together. Ensure that a test sample consisting of two carbon black stabilized strips supports a 72.5 kg (160 lb) load for the test period and that a test sample consisting of carbon black stabilized strip and a HALS stabilized strip supports a 63.5 kg (140 lb) load for the test period.

Furnish the CO with a certificate signed by a legally authorized official from the company that manufactured the geocell. Ensure that the certificate attests that the geocell meets the chemical, physical, material and manufacturing requirements stated in the specification. When requested by the CO, furnish a sample of the geocell from each lot for verification testing.

During shipment and storage, wrap the geocell in heavy-duty protective covering. Protect the geocell from mud, soil, dust, debris and sunlight prior to installation.

The following products meet this specification:

GEOWEB manufactured by Presto Products Company, P.O. Box 2399, Appleton, WI 54913-2399, telephone 920-738-1222.

TERRACELL manufactured by Webtec, Inc., P.O. Box 19729, Charlotte, NC 28219, telephone 704- 398-0954.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998) This contract…

This is the start of the file's text. The full file is on GovTribe.