1SageExhibA EstQty.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Recovery-Sage Creek Culvert Replacement Federal contract opportunity
Solicitation number
AG-0489-S-10-0271
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Exhibit A - Estimate of Quanties

View the file

Other files for this federal contract opportunity

Other files attached to Recovery-Sage Creek Culvert Replacement, newest first.
File Type Posted
2Sage DOL Wage Rates.doc DOC document
1Sage Fire Protect-Supp Rqts.doc DOC document
1SageExhibB 2of2.pdf PDF
1Sage SolicitationPkg.doc DOC document
1Sage Plans Drwgs.pdf PDF
1Sage ARRA Signs.pdf PDF
1Sage SF-1442.pdf PDF
1Sage Kr PerformData Sheet.doc DOC document
1SageExhibB 1of2.pdf PDF
1Sage DOL Wage Rates.doc DOC document
1Sage TechSpecs.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SAGE CREEK CULVERT REPLACEMENT

Estimate of Quantities

Pay ItemDescriptionQuantityMethod of MeasureRemarks
151MobilizationALLLSIncludes mobilization for all work items. ARRA sign fabrication and installation shall be considered indirect to this pay item. All equipment used on this project shall be cleaned and certified to be weed free prior to entering the National Forest.
157ASoil Erosion ControlALLLSContractor shall provide a written soil and erosion control plan to the CO for approval prior to initiating construction.
157BSoil Erosion Control (dewatering, bypass pumping, etc)ALLLSContractor shall provide a written dewatering plan to the CO for approval prior to initiating construction.
201Clearing and Grubbing, disposal method fALLLSReference FSSS 203.05
203Remove Existing Culvert, disposal method AALLLS
204Excavation and BackfillALLLSCompaction method B, tolerance C. Excavation and backfill for all work outside of the immediate vicinity of the structure (see page 3 of 5 of the plans). Backfill may be obtained onsite. Excess excavation shall be disposed of at location staked by the C.O.. Disposed material shall be shaped and compacted by tracked equipment as agreed to by the C.O..
208Excavation/Backfill for StructureALLLSReference FP-03, Section 208.13. Structural Backfill may be obtained onsite.
602Culvert Installation, Type Multiplate Steel Bottomless Arch Culvert, 168" span, 72" rise, 82' lengthALLLSWork to include Material, Labor, End Bevels, Footings, Stemwalls, Bedding Material, Surface Course Material (Grading D) and riprap. Surface Course, Bedding and Riprap shall be provided by a commercial source. Arch lengths are as follows: 82' top length, 88' bottom length, 90' footing length.
635TemporaryTraffic ControlALLLSContractor shall provide a written traffic control plan to the CO for approval prior to initiating construction.
648Install Streambed Simulation MaterialALLLSReference Sheets 3 and 5 of 5. Channel rock is incidental to this pay item.