0263 Bid Abstract 031510.pdf

PDF 101 KB Posted

Attached to
RECOVERY KMRD Road Storage North Federal contract opportunity
Solicitation number
AG-0489-S-10-0263
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Northwest

About this file

Bid Abstract

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY KMRD Road Storage North, newest first.
File Type Posted
AG-0489-S-10-0263_kmrd-rd-north_amend1.pdf PDF
AG-0489-S-10-0263_kmrd-rd_north.pdf PDF
AG-0489-S-10-0263_kmrd-rd-north_sectionj.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID ABSTRACT - FORMAL Project Name:

Issuing Office:

EROC Northwest Gov't Estimate: Base Bid $988,400 16400 Champion Way Option 1 $140,935 Sandy, OR 97055 Option 2 $87,255

Option 3 $251,585 Total $1,468,175

Bidder #1 Supplier Certs Bidder #2 Supplier Certs Anderson Environmen Ketchikan Ready Mix

Contracting, LLC 4418 North Tongass H 705 Colorado Street Ketchikan, AK 99901 Kelso, WA

Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Unit Price Total Amount

1.1 204(04) Unclassified Borrow, Compaction CY CY 500 $21.50 $10,750.00 $15.00 $7,500.00

1.2* 204(29) Endhaul CY CY 35 $21.50 $752.50 $15.00 $525.00

1.3 303(01) Roadway Reconditioning MILE MILE 23.19 $4,035.90 $93,592.52 $2,350.00 $54,496.50

1.4* 571(06) Furnish and Install Treated Structural LUMP SUM LUMP SUM 1 $53,696.50 $53,696.50 $68,000.00 $68,000.00 1.5* 571(06) Furnish and Install Treated Structural LUMP SUM LUMP SUM 1 $53,696.50 $53,696.50 $68,000.00 $68,000.00 1.6* 571(06) Furnish and Install Treated Structural LUMP SUM LUMP SUM 1 $53,696.50 $53,696.50 $68,000.00 $68,000.00 1.7* 571(06) Furnish and Install Treated Structural LUMP SUM LUMP SUM 1 $53,696.50 $53,696.50 $68,000.00 $68,000.00 1.8* 573(01) Minor Bridge Repair Margaret Bay LUMP SUM LUMP SUM 1 $15,216.00 $15,216.00 $17,000.00 $17,000.00 1.9* 802(01) Road Storage with drivable (pickup) MILE MILE 32.02 $4,358.80 $139,568.78 $3,400.00 $108,868.00

1.10* 802(02) Road Storage with OHV waterbars MILE MILE 12.34 $4,358.80 $53,787.59 $2,100.00 $25,914.00

1.11 802(03) Road Storage with removed structures MILE MILE 13.88 $5,300.50 $73,570.94 $6,600.00 $91,608.00

1.12 807(2) Medium Sized Crawler Excavator with HOUR HOUR 120 $161.40 $19,368.00 $100.00 $12,000.00

1.13 833(1_24) 24 Inch Culvert Pipe, Contractor LF LF 72 $53.80 $3,873.60 $60.00 $4,320.00

1.14 833(1_36) 36 Inch Culvert Pipe, Contractor LF LF 520 $75.30 $39,156.00 $100.00 $52,000.00

1.15 833(1_48) 48 Inch Culvert Pipe, Contractor LF LF 164 $91.50 $15,006.00 $200.00 $32,800.00

1.16* 151(01) Mobilization Margaret Bay LS LS 1 $62,068.90 $62,068.90 $28,000.00 $28,000.00 1.17* 151(01) Mobilization SW Neets LS LS 1 $59,916.40 $59,916.40 $14,000.00 $14,000.00 1.18* 151(01) Mobilization Fire Cove LS LS 1 $59,916.40 $59,916.40 $21,000.00 $21,000.00

$861,329.63 $742,031.50

Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Unit Price Total Amount

2.1 303(01) Roadway Reconditioning MILE MILE 11.07 4601 $50,933.07 2350 $26,014.50

2.2 802(01) Road Storage with drivable MILE MILE 1.37 3497.8 $4,791.99 3400 $4,658.00

2.3 802(02) Road Storage with OHV waterbars MILE MILE 3.43 3497.8 $11,997.45 2100 $7,203.00

2.4 802(03) Road Storage with removed structures MILE MILE 3.78 5300.5 $20,035.89 6600 $24,948.00

2.5 807(2) Medium Sized Crawler Excavator HOUR HOUR 20 161.4 $3,228.00 100 $2,000.00

2.6* 151(01) Mobilization Shrimp Bay LS LS 1 10009.1 $10,009.10 14000 $14,000.00 $100,995.50 $78,823.50

Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Unit Price Total Amount $0.00 $0.00

MILE MILE 7.61 4009 $30,508.49 2350 $17,883.50

$0.00

MILE MILE 0.87 2690.6 $2,340.82 2100 $1,827.00

$0.00

3.3 MILE MILE 0.57 7964.3 $4,539.65 6600 $3,762.00

$0.00

3.4 HOUR HOUR 20 161.4 $3,228.00 100 $2,000.00

$0.00

LF LF 30 75.3 $2,259.00 100 $3,000.00

3.6 861(01) Resurface Bridge Surface SF SF 960 8.8 $8,448.00 7.5 $7,200.00

3.7* 151(01) Mobilization Klu Bay LS LS 1 15067.5 $15,067.50 7000 $7,000.00 $66,391.46 $42,672.50

Item Description Pay Unit UOM Est. Qty Unit Price Total Amount Unit Price Total Amount

4.1* 571(06) Furnish and Install Treated Structural Timber, 40’ Glue Laminated Bridge, Wood curbs, Sills and Backwalls Road 8000000 MP 38.828

Lump Sum Lump Sum 1

53696.5 $53,696.50 68000 $68,000.00

4.2* 571(06) Furnish and Install Treated Structural Timber, 40’ Glue Laminated Bridge, Wood curbs, Sills and Backwalls Road 8000000 MP 40.515

Lump Sum Lump Sum 1

53696.5 $53,696.50 68000 $68,000.00

4.3* 571(06) Furnish and Install Treated Structural Timber, 40’ Glue Laminated Bridge, Wood curbs, Sills and Backwalls Road 8000000 MP 40.542

Lump Sum Lump Sum 1

53696.5 $53,696.50 68000 $68,000.00

4.4 802(02) Road Storage with OHV waterbars Mile Mile 2.49 4358.8 $10,853.41 2100 $5,229.00

4.5 807(2) Medium Sized Crawler Excavator with Operator

Hour Hour 20

161.4 $3,228.00 100 $2,000.00

4.6 833(1_36) 36 Inch Culvert Pipe, Contractor Furnish & Install

LF LF 32

75.3 $2,409.60 100 $3,200.00

4.7* 151(01) Mobilization Bluff Lake LS LS 1 16897.1 $16,897.10 7000 $7,000.00 $194,477.61 $221,429.00

833(1_36) 36 Inch Culvert Pipe, Contractor Furnish & Install

3.1 802(01) Road Storage with drivable (pickup) waterbars

3.2 802(02) Road Storage with OHV waterbars

807(2) Medium Sized Crawler Excavator with Operator

TOTAL BID AMOUNT - BASE BID PLUS OPTIONS $1,223,194.20 $1,084,956.50

3.5

Solicitation No. AG-0489-S-10-0263

Bid Opening Date: 3/29/2010 2:00 PM

Recovery KMRD Road Storage NORTH

TOTAL BASE BID

BASE BID

802(03) Road Storage with removed structures

OPTION 1 - ITEMS

OPTION 2 - ITEMS

OPTION 3 - BLUFF ITEMS

OPTION 1 - ITEMS

OPTION 2 - ITEMS

BASE BID BASE BID

TOTAL BLUFF BID

TOTAL SHRIMP BAY BID

TOTAL KLU BAY BID

OPTION 2 - KLU BAY ITEMS

OPTION 1 - SHRIMP BAY ITEMS

OPTION 3 - ITEMS

BID ABSTRACT - FORMAL

Issuing Office:

EROC Northwest 16400 Champion Way Sandy, OR 97055

Bidder #2 Supplier Certs Bidder #4 Supplier Certs Bidder #5 Supplier Certs Bidder #6 Supplier Certs Bidder #5 Supplier Certs Channel Construction Rec'd in time? S&S General Contracto Southeast RoadBuilde TM Construction Bicknell PO Box 33359 PO Box 1440 HC 60 Box 4800 PO Box 1626 PO Box 33517 Juneau, AK 99803 Sitka, AK 99835 Haines, AK 99827 Sitka, AK 99835 Juneau, AK 99803

Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount $19.29 $9,645.00 $22.00 $11,000.00 $25.00 $12,500.00 $12.00 $6,000.00 $17.00 $8,500.00 $19.29 $675.15 $20.00 $700.00 $50.00 $1,750.00 $6.00 $210.00 $12.00 $420.00

$3,518.90 $81,603.29 $3,000.00 $69,570.00 $3,500.00 $81,165.00 $2,500.00 $57,975.00 $6,500.00 $150,735.00 $66,550.00 $66,550.00 $55,000.00 $55,000.00 $75,000.00 $75,000.00 $70,000.00 $70,000.00 $78,500.00 $78,500.00 $66,550.00 $66,550.00 $55,000.00 $55,000.00 $75,000.00 $75,000.00 $70,000.00 $70,000.00 $78,500.00 $78,500.00 $66,550.00 $66,550.00 $55,000.00 $55,000.00 $75,000.00 $75,000.00 $70,000.00 $70,000.00 $78,500.00 $78,500.00 $66,550.00 $66,550.00 $55,000.00 $55,000.00 $75,000.00 $75,000.00 $70,000.00 $70,000.00 $78,500.00 $78,500.00 $12,650.00 $12,650.00 $12,000.00 $12,000.00 $9,000.00 $9,000.00 $11,500.00 $11,500.00 $18,000.00 $18,000.00

$3,989.70 $127,750.19 $6,000.00 $192,120.00 $4,000.00 $128,080.00 $3,500.00 $112,070.00 $7,000.00 $224,140.00 $3,989.70 $49,232.90 $5,000.00 $61,700.00 $4,000.00 $49,360.00 $3,000.00 $37,020.00 $16,000.00 $197,440.00 $5,188.70 $72,019.16 $6,000.00 $83,280.00 $4,000.00 $55,520.00 $4,500.00 $62,460.00 $8,400.00 $116,592.00

$165.00 $19,800.00 $165.00 $19,800.00 $150.00 $18,000.00 $140.00 $16,800.00 $125.00 $15,000.00 $49.50 $3,564.00 $85.00 $6,120.00 $65.00 $4,680.00 $54.00 $3,888.00 $115.00 $8,280.00 $71.50 $37,180.00 $90.00 $46,800.00 $95.00 $49,400.00 $97.00 $50,440.00 $175.00 $91,000.00 $82.50 $13,530.00 $100.00 $16,400.00 $125.00 $20,500.00 $115.00 $18,860.00 $175.00 $28,700.00

$45,600.00 $45,600.00 $20,000.00 $20,000.00 $60,000.00 $60,000.00 $50,000.00 $50,000.00 $98,000.00 $98,000.00 $37,000.00 $37,000.00 $20,000.00 $20,000.00 $60,000.00 $60,000.00 $50,000.00 $50,000.00 $98,000.00 $98,000.00 $37,000.00 $37,000.00 $20,000.00 $20,000.00 $60,000.00 $60,000.00 $50,000.00 $50,000.00 $98,000.00 $98,000.00

$813,449.69 $799,490.00 $909,955.00 $807,223.00 $1,466,807.00

OPTION 1 - ITEMS OPTION 1 - ITEMS

Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount

4026 $44,567.82 3200 $35,424.00 3500 $38,745.00 2500 $27,675.00 6500 $71,955.00

2955.7 $4,049.31 3000 $4,110.00 4000 $5,480.00 3500 $4,795.00 7000 $9,590.00

2955.7 $10,138.05 3500 $12,005.00 4000 $13,720.00 3000 $10,290.00 16000 $54,880.00

4944.5 $18,690.21 5000 $18,900.00 4000 $15,120.00 4500 $17,010.00 8400 $31,752.00

165 $3,300.00 165 $3,300.00 150 $3,000.00 140 $2,800.00 125 $2,500.00 8800 $8,800.00 15000 $15,000.00 15000 $15,000.00 15000 $15,000.00 25000 $25,000.00

$89,545.39 $88,739.00 $91,065.00 $77,570.00 $195,677.00

Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount $0.00 $0.00 $0.00 $0.00 $0.00

3600.3 $27,398.28 3000 $22,830.00 4000 $30,440.00 3500 $26,635.00 7000 $53,270.00 $0.00 $0.00 $0.00 $0.00 $0.00

2275.9 $1,980.03 4000 $3,480.00 4000 $3,480.00 3000 $2,610.00 16000 $13,920.00 $0.00 $0.00 $0.00 $0.00 $0.00

7498.7 $4,274.26 6000 $3,420.00 4000 $2,280.00 4500 $2,565.00 8400 $4,788.00 $0.00 $0.00 $0.00 $0.00 $0.00

165 $3,300.00 165 $3,300.00 150 $3,000.00 140 $2,800.00 125 $2,500.00 $0.00 $0.00 $0.00 $0.00 $0.00

71.5 $2,145.00 100 $3,000.00 95 $2,850.00 97 $2,910.00 175 $5,250.00

13.2 $12,672.00 7 $6,720.00 12.5 $12,000.00 12 $11,520.00 14 $13,440.00

6050 $6,050.00 20000 $20,000.00 15000 $15,000.00 15000 $15,000.00 25000 $25,000.00 $57,819.58 $62,750.00 $69,050.00 $64,040.00 $118,168.00

Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount

66550 $66,550.00 61000 $61,000.00 75000 $75,000.00 70000 $70,000.00 78500 $78,500.00

66550 $66,550.00 61000 $61,000.00 75000 $75,000.00 70000 $70,000.00 78500 $78,500.00

66550 $66,550.00 61000 $61,000.00 75000 $75,000.00 70000 $70,000.00 78500 $78,500.00

3781.8 $9,416.68 2500 $6,225.00 4000 $9,960.00 3000 $7,470.00 16000 $39,840.00

165 $3,300.00 165 $3,300.00 150 $3,000.00 140 $2,800.00 125 $2,500.00

71.5 $2,288.00 90 $2,880.00 95 $3,040.00 97 $3,104.00 175 $5,600.00 23100 $23,100.00 20000 $20,000.00 15000 $15,000.00 20000 $20,000.00 25000 $25,000.00

$237,754.68 $215,405.00 $256,000.00 $243,374.00 $308,440.00

Recovery KMRD Road Storage NORTH

Bid Opening Date: 3/29/2010 2:00 PM PST

$1,192,207.00 $2,089,092.00$1,198,569.34 $1,166,384.00 $1,326,070.00

OPTION 3 - ITEMS

OPTION 1 - ITEMS

OPTION 2 - ITEMS

BASE BID

OPTION 3 - ITEMS

BASE BID

OPTION 2 - ITEMS

OPTION 3 - ITEMS

BASE BID

OPTION 1 - ITEMS

OPTION 2 - ITEMS

OPTION 3 - ITEMS

BASE BID

OPTION 1 - ITEMS

OPTION 2 - ITEMS

OPTION 3 - ITEMS

BASE BID

OPTION 2 - ITEMS

mailto:Dlreforestation_domingo@yahoo.com� mailto:Dlreforestation_domingo@yahoo.com�

Sheet1

File details come from the government source that posted it. Updated .