FP-14 Standard Specifications For Construction of Roads and Bridges on Federal Highway Projects

View the file

Other files for this federal contract opportunity

Other files attached to Fiberglass Reinforced Polymer Trail Bridge Kit, newest first.
File Type Posted
Amendment_002~AG-046W-S-17-0004.pdf PDF
Amendment_001_AG-046W-S-17-0004.pdf PDF
Bridge_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

FP-14

U.S. Department of Transportation Federal Highway Administration Federal Lands Highway

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects

FP-14

UNITED STATES DEPARTMENT OF TRANSPORTATION

Federal Highway Administration

PREFACE

These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Federal Highway Administration. These specifications are cited as "FP-14" indicating "Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and Metric units of measure.

When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Federal Highway Administration are also governed by the following regulations:

●Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1; and
●Transportation Acquisition Regulation (TAR), Title 48, Code of Federal Regulations, Chapter 12.

The FAR and TAR regulations are not included in the FP-14. A complete copy of the FAR is available from the Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.

U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure.

METRIC TO U.S. CUSTOMARY CONVERSION FACTORS (approximate)

Symbol
When You Know
Multiply By
To Find
Symbol

LENGTH

µm
micrometers
3.9 × 10-5
inches
in
mm
millimeters
0.039
inches
in
m
meters
3.28
feet
ft
m
meters
1.09
yards
yd
km
kilometers
0.621
miles
mi

AREA

mm2
square millimeters
0.0016
square inches
in2
m2
square meters
10.764
square feet
ft2
m2
square meters
1.195
square yards
yd2
ha
hectares
2.47
acres
ac
km2
square kilometers
0.386
square miles
mi2

VOLUME

mL
milliliters
0.034
fluid ounces
fl oz
L
liters
0.264
gallons
gal
m3
cubic meters
35.31
cubic feet
ft3
m3
cubic meters
1.308
cubic yards
yd3

MASS

g
grams
0.035
ounces
oz
kg
kilograms
2.2046
pounds
lb
Mg
megagrams
1.1023
short tons
T
(or "t")
(or "metric ton")

(2000 lb)

TEMPERATURE (exact)

°C
Celsius

temperature

1.8C +32
Fahrenheit

temperature °F

ILLUMINATION

lx
lux
0.0929
foot-candles
fc
cd/m2
candela/m2
0.2919
foot-Lamberts
fl

MISCELLANEOUS

J
joule
0.7376
foot·poundforce
ft·lbf
N
newtons
0.225
poundforce
lbf
kPa
kilopascals
0.145
Poundforce

per square inch lbf/in2

TABLE OF CONTENTS

DIVISION 100 GENERAL REQUIREMENTS1
Section 101. — TERMS, FORMAT, AND DEFINITIONS2
Section 102. — BID, AWARD, AND EXECUTION OF CONTRACT11
Section 103. — SCOPE OF WORK14
Section 104. — CONTROL OF WORK16
Section 105. — CONTROL OF MATERIAL22
Section 106. — ACCEPTANCE OF WORK25
Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC36
Section 108. — PROSECUTION AND PROGRESS41
Section 109. — MEASUREMENT AND PAYMENT45
DIVISION 150 PROJECT REQUIREMENTS57
Section 151. — MOBILIZATION58
Section 152. — CONSTRUCTION SURVEY AND STAKING59
Section 153. — CONTRACTOR QUALITY CONTROL66
Section 154. — CONTRACTOR SAMPLING AND TESTING70
Section 155. — SCHEDULES FOR CONSTRUCTION CONTRACTS72
Section 156. — PUBLIC TRAFFIC81
Section 157. — SOIL EROSION AND SEDIMENT CONTROL85
Section 158. — WATERING FOR DUST CONTROL91
DIVISION 200 EARTHWORK93
Section 201. — CLEARING AND GRUBBING94
Section 202. — ADDITIONAL CLEARING AND GRUBBING96
Section 203. — REMOVAL OF STRUCTURES AND OBSTRUCTIONS98
Section 204. — EXCAVATION AND EMBANKMENT102
Section 205. — ROCK BLASTING114
Section 206. — RESERVED123
Section 207. — EARTHWORK GEOSYNTHETICS124

Section 208. — STRUCTURE EXCAVATION AND BACKFILL

FOR SELECTED MAJOR STRUCTURES128
Section 209. — STRUCTURE EXCAVATION AND BACKFILL133
Section 210. — RESERVED138
Section 211. — ROADWAY OBLITERATION139
Section 212. — LINEAR GRADING141
Section 213. — SUBGRADE STABILIZATION143
DIVISION 250 SLOPE REINFORCEMENT AND RETAINING WALLS149
Section 251. — RIPRAP150

Section 252. — ROCKERY, SPECIAL ROCK EMBANKMENT,

AND ROCK BUTTRESS153
Section 253. — GABIONS AND REVET MATTRESSES158
Section 254. — RESERVED161
Section 255. — MECHANICALLY-STABLILIZED EARTH WALLS162
Section 256. — PERMANENT GROUND ANCHORS168
Section 257. — CONTRACTOR-DESIGNED RETAINING WALLS176
Section 258. — REINFORCED CONCRETE RETAINING WALLS180
Section 259. — SOIL NAIL RETAINING WALLS182
Section 260. — ROCK BOLTS AND DOWELS192
Section 261. — REINFORCED SOIL SLOPES200
DIVISION 300 AGGREGATE AND BASE COURSES203
Section 301. — UNTREATED AGGREGATE COURSES204
Section 302. — MINOR CRUSHED AGGREGATE212
Section 303. — ROAD RECONDITIONING215
Section 304. — FULL DEPTH RECLAMATION218
Section 305. — FULL DEPTH RECLAMATION WITH CEMENT221
Section 306. — FULL DEPTH RECLAMATION WITH ASPHALT227
Section 307. — RESERVED237
Section 308. — RESERVED237
Section 309. — EMULSIFIED ASPHALT-TREATED BASE COURSE238
Section 310. — COLD IN-PLACE RECYCLED ASPHALT BASE COURSE243
Section 311. — STABILIZED AGGREGATE SURFACE COURSE252
Section 312. — DUST PALLIATIVE258
Section 313. — AGGREGATE-TOPSOIL COURSE260
Section 314. — STOCKPILED AGGREGATES262
DIVISION 400 ASPHALT PAVEMENTS AND SURFACE TREATMENTS265

Section 401. — ASPHALT CONCRETE PAVEMENT BY GYRATORY

MIX DESIGN METHOD 266

Section 402. — ASPHALT CONCRETE PAVEMENT BY HVEEM OR

MARSHALL MIX DESIGN METHOD294
Section 403. — ASPHALT CONCRETE309
Section 404. — RESERVED313
Section 405. — OPEN-GRADED ASPHALT FRICTION COURSE314
Section 406. — FOG SEAL321
Section 407. — CHIP SEAL324
Section 408. — RESERVED332
Section 409. — MICRO SURFACING333
Section 410. — SLURRY SEAL339
Section 411. — ASPHALT PRIME COAT344
Section 412. — ASPHALT TACK COAT346
Section 413. — ASPHALT PAVEMENT MILLING348
Section 414. — ASPHALT PAVEMENT CRACK SEALING AND FILLING350
Section 415. — PAVING GEOTEXTILES353
Section 416. — RESERVED355
Section 417. — RESERVED355
Section 418. — ASPHALT CONCRETE PAVEMENT PATCHING356
DIVISION 500 RIGID PAVEMENTS359
Section 501. — MINOR CONCRETE PAVEMENT360
Section 502. — CONCRETE PAVEMENT RESTORATION370
DIVISION 550 BRIDGE CONSTRUCTION381
Section 551. — DRIVEN PILES382
Section 552. — STRUCTURAL CONCRETE395
Section 553. — PRESTRESSED CONCRETE419
Section 554. — REINFORCING STEEL433
Section 555. — STEEL STRUCTURES436
Section 556. — BRIDGE RAILING453
Section 557. — TIMBER STRUCTURES456
Section 558. — DAMPPROOFING461
Section 559. — WATERPROOFING462
Section 560. — REMOVAL OF CONCRETE BY HYDRODEMOLITION467
Section 561. — STRUCTURAL CONCRETE INJECTION AND CRACK REPAIR470
Section 562. — TEMPORARY WORKS474
Section 563. — PAINTING479
Section 564. — BEARING DEVICES488
Section 565. — DRILLED SHAFTS491
Section 566. — SHOTCRETE502
Section 567. — MICROPILES511
Section 568. — HIGH PERFORMANCE CONCRETE519
Section 569. — CONCRETE OVERLAYS FOR BRIDGE DECKS528
DIVISION 600 INCIDENTAL CONSTRUCTION543
Section 601. — MINOR CONCRETE STRUCTURES544
Section 602. — CULVERTS AND DRAINS547
Section 603. — STRUCTURAL PLATE STRUCTURES550
Section 604. — MANHOLES, INLETS, AND CATCH BASINS552

Section 605. — UNDERDRAINS, SHEET DRAINS, AND

PAVEMENT EDGE DRAINS555
Section 606. — CORRUGATED METAL SPILLWAYS560

Section 607. — CLEANING, RELAYING, AND REPAIRING EXISTING

DRAINAGE STRUCTURES561
Section 608. — PAVED WATERWAYS562
Section 609. — CURB AND GUTTER566
Section 610. — HORIZONTAL DRAINS571
Section 611. — WATER SYSTEMS573
Section 612. — SANITARY SEWER SYSTEMS575
Section 613. — SIMULATED STONE MASONRY SURFACE577
Section 614. — LEAN CONCRETE BACKFILL580
Section 615. — SIDEWALKS, PADS, AND PAVED MEDIANS582
Section 616. — SLOPE PAVING585
Section 617. — GUARDRAIL588
Section 618. — CONCRETE BARRIERS AND PRECAST GUARDWALLS592
Section 619. — FENCES, GATES, CATTLE GUARDS AND BOLLARD POSTS595
Section 620. — STONE MASONRY601
Section 621. — MONUMENTS AND MARKERS608
Section 622. — RENTAL EQUIPMENT609
Section 623. — GENERAL LABOR610
Section 624. — TOPSOIL611
Section 625. — TURF ESTABLISHMENT613
Section 626. — PLANTS, TREES, SHRUBS, VINES, AND GROUNDCOVERS616
Section 627. — SOD620
Section 628. — RESERVED622

Section 629. — ROLLED EROSION CONTROL PRODUCTS AND

CELLULAR CONFINEMENT SYSTEMS623
Section 630. — RESERVED626
Section 631. — RESERVED626
Section 632. — RESERVED626
Section 633. — PERMANENT TRAFFIC CONTROL627
Section 634. — PERMANENT PAVEMENT MARKINGS630
Section 635. — TEMPORARY TRAFFIC CONTROL634

Section 636. — TRAFFIC SIGNAL, TRAFFIC COUNTER, LIGHTING,

AND ELECTRICAL SYSTEMS640
Section 637. — FACILITIES AND SERVICES644
DIVISION 700 MATERIAL649
Section 701. — CEMENT650
701.01 Hydraulic Cement650
701.02 Masonry and Mortar Cement650
Section 702. — ASPHALT MATERIAL651
702.01 Asphalt Binder651

702.03 Material for Dampproofing and Waterproofing Concrete and

Masonry Surfaces651
702.04 Asphalt Mastic653
702.05 Antistrip Additive653
702.06 Mineral Fiber653
Section 703. — AGGREGATE654
703.01 Fine Aggregate for Concrete654
703.02 Coarse Aggregate for Concrete654
703.03 Granular Backfill655
703.04 Reserved.655
703.05 Subbase, Base, and Surface Course Aggregate655
703.06 Crushed Aggregate657
703.07 Asphalt Concrete Aggregate657
703.08 Open-Graded Asphalt Friction Course Aggregate659
703.09 Chip Seal Aggregate660
703.10 Slurry Seal and Micro Surfacing Aggregate660
703.11 Reserved661
703.12 Blotter661
703.13 Aggregate for Aggregate-Topsoil Course661
703.14 Sand662
703.15 Aggregate for Lean Concrete Backfill662
703.16 Shotcrete Aggregate662
703.17 Granular Rock Backdrain663
Section 704. — SOIL664
704.01 Foundation Fill664
704.02 Bedding Material664
704.03 Backfill Material664
704.04 Structural Backfill664
704.05 Topping664
704.06 Unclassified Borrow665
704.07 Select Borrow665
704.08 Select Granular Backfill665
Section 705. — ROCK667
705.01 Gabion and Revet Mattress Rock667
705.02 Riprap667
705.03 Rock for Masonry Structures669
705.04 Rock for Special Rock Embankment669
705.05 Rock for Buttresses669
705.06 Rock for Rockeries670
Section 706. — CONCRETE PIPE671
706.01 Non-Reinforced Concrete Pipe671
706.02 Reinforced Concrete Pipe671
706.03 Perforated Concrete Pipe671
706.04 Reinforced Arch-Shaped Concrete Pipe671
706.05 Reinforced Elliptically-Shaped Concrete Pipe671
706.06 Reinforced D-Load Concrete Pipe671
706.07 Precast Reinforced Concrete Box Sections671
706.08 Gaskets for Concrete Pipe671
706.09 Supplemental Concrete Pipe Ties671
Section 707. — METAL PIPE672
707.01 Ductile Iron Culvert Pipe672
707.02 Metallic-Coated Corrugated Steel Pipe672
707.03 Aluminum-Alloy Corrugated Pipe672
707.04 Asphalt-Coated Pipe672
707.05 Steel Structural Plate Structures672
707.06 Aluminum-Alloy Structural Plate Structures672
707.07 Asphalt-Coated Structural Plate Structures672
707.08 Polymer-Coated Steel Pipe672
707.09 Reserved672
707.10 Slotted Drain Pipe673
707.11 Metallic-Coated Spiral Rib Pipe673
707.12 Aluminum-Alloy Spiral Rib Pipe673
707.13 Concrete-Lined Corrugated Steel Pipe673
707.14 Invert-Paved Corrugated Steel Pipe673
707.15 Cast Iron Soil Pipe and Fittings673
707.16 Seamless Copper Water Tube and Fittings673
707.17 Gaskets for Metal Pipe673
707.18 Gaskets for Ductile Iron Pipe673
Section 708. — PLASTIC PIPE674
708.01 Smooth Wall Polyethylene Pipe674
708.02 Corrugated Polyethylene Pipe674
708.03 Profile Wall (Ribbed) Polyethylene Pipe674
708.04 Corrugated Polyethylene Drainage Tubing674
708.05 Smooth Wall Polyvinyl Chloride (PVC) Pipe674
708.06 Profile Wall (Ribbed) Polyvinyl Chloride Pipe675
708.07 Acrylonitrile-Butadiene-Styrene (ABS) Pipe675
708.08 Gaskets for Plastic Pipe675
Section 709. — REINFORCING STEEL AND WIRE ROPE676
709.01 Reinforcing Steel676
709.02 Prestressing Steel677
Section 710. — FENCE AND GUARDRAIL678
710.01 Barbed Wire678
710.02 Woven Wire678
710.03 Chain Link Fence678
710.04 Fence Posts and Bollards678
710.05 Fence Gates678
710.06 Rail Elements678
710.07 Guardrail Posts679
710.08 Guardrail Blocks679
710.09 Guardrail Nuts, Bolts, and Cables679
710.10 Guardrail Hardware679
710.11 Temporary Plastic Fence680
Section 711. — CONCRETE CURING MATERIAL AND ADMIXTURES681
711.01 Curing Material681
711.02 Air-Entraining Admixtures681
711.03 Chemical Admixtures681
711.04 Latex Emulsion681
711.05 Concrete Coloring Agents681
Section 712. — JOINT MATERIAL682
712.01 Sealants, Fillers, and Seals682
712.02 Mortar683
Section 713. — ROADSIDE IMPROVEMENT MATERIAL684
713.01 Topsoil684
713.02 Agricultural Limestone684
713.03 Fertilizer684
713.04 Seed685
713.05 Mulch685
713.06 Plant Material687
713.07 Cellular Confinement Systems688
713.08 Miscellaneous Planting Material689
713.09 Sod689
713.10 Pegs for Sod689
713.11 Tackifiers690
713.12 Fiber Rolls and Socks690
713.13 Gravel Bags691
713.14 Sandbags691
713.15 Temporary Culvert Pipe691
713.16 Silt Fence691
713.17 Temporary Rolled Erosion Control Products692
713.18 Turf Reinforcement Mats695
713.19 Sediment Filter Bags696
713.20 Prefabricated Filter Insert696
713.21 Floating Turbidity Curtains696
Section 714. — GEOSYNTHETIC MATERIAL698
714.01 Geotextile698
714.02 Geocomposite Drain699
714.03 Stabilization Geogrid700
714.04 Reinforcement Geotextile and Geogrid701
714.05 Geomembrane703
Section 715. — PILING704
715.01 Untreated Timber Piles.704
715.02 Treated Timber Piles.704
715.03 Concrete Piles.704
715.04 Steel Shells.705
715.05 Steel Pipes.705
715.06 Steel H-Piles.706
715.07 Sheet Piles.706
715.08 Pile Shoes.706
715.09 Splices.706
Section 716. — MATERIAL FOR TIMBER STRUCTURES707
716.01 Untreated Structural Timber and Lumber707
716.02 Hardware707
716.03 Treated Structural Timber and Lumber707
716.04 Structural Glued Laminated Timber707
Section 717. — STRUCTURAL METAL708
717.01 Structural Steel708
717.02 Steel Forgings709
717.03 Pins and Rollers709
717.04 Castings709
717.05 Welded Stud Shear Connectors710
717.06 Steel Pipe710
717.07 Galvanized Coatings710
717.08 Sheet Lead710
717.09 Steel Grid Floors710
717.10 Bearings710
717.11 Polytetrafluoroethylene (PTFE) Surfaces for Bearings710
717.12 Aluminum Alloy for Bridge Rail711
717.13 Aluminum Bolt Heads and Nuts711
717.14 Aluminum Welding Wire712
Section 718. — TRAFFIC SIGNING AND MARKING MATERIAL713
718.01 Retroreflective Sheeting713
718.02 Reserved713
718.03 Panels713
718.04 Sign Posts714
718.05 Object Marker and Delineator Posts715
718.06 Hardware715
718.07 Legends and Borders715
718.08 Delineator and Object Marker Retroreflectors715
718.09 Solventborne Traffic Paint716
718.10 Waterborne Traffic Paint716
718.11 Epoxy Markings718
718.12 Thermoplastic Markings719
718.13 Preformed Pavement Marking Tape719
718.14 Glass Beads719
718.15 Pavement Markers719
718.16 Temporary Pavement Markings719
718.17 Epoxy Resin Adhesives720
Section 719. — PAINT721
719.01 General721
719.02 Paint for Timber Structures722
719.03 Paint for Masonry Block Structures722
719.04 Paint for Steel Structures722
719.05 Paint for Concrete Structures.722
719.06 Paint for Aluminum Structures.722
719.07 Paint for Other Metal Structures.722
719.08 Penetrating Stain723
719.09 Mineral Spirits (Petroleum Spirits)723

Section 720. — STRUCTURAL WALL AND STABILIZED

EMBANKMENT MATERIAL724
720.01 Mechanically-Stabilized Earth Wall Material724
720.02 Gabion and Revet Mattress Material725
Section 721. — ELECTRICAL AND ILLUMINATION MATERIAL726
721.01 Electrical Material726
721.02 Lighting Material727
Section 722. — ANCHOR MATERIAL730
722.01 Anchorage Devices730
722.02 Anchor Tendons730
722.03 Rock Bolts731
722.04 Soil Nails732
Section 723. — RESERVED733
Section 724. — RESERVED733
Section 725. — MISCELLANEOUS MATERIAL734
725.01 Water734
725.02 Calcium Chloride, Magnesium Chloride, and Lignosulfonate734
725.03 Lime734
725.04 Pozzolans735
725.05 Mineral Filler735
725.06 Concrete Building Brick735
725.07 Concrete Masonry Units735
725.08 Paving Brick735
725.09 Precast Concrete Units and Accessories735
725.10 Frames, Grates, Covers, and Ladder Rungs736
725.11 Corrugated Metal Units736
725.12 Plastic Lining736
725.13 Grout736
725.14 Polymer Concrete and Mortar737
725.15 Color Coating737
725.16 Slurry (Drilling Fluids)738
725.17 Reinforcing Fibers738
725.18 Epoxy Resin Adhesives738

xiv

DIVISION 100 GENERAL REQUIREMENTS

Section 101. — TERMS, FORMAT, AND DEFINITIONS

101.01 Meaning of Terms. These specifications are generally written in the imperative mood. In sentences using the imperative mood, the subject, "the Contractor", is implied. Also implied in this language are "shall", "shall be", or similar words and phrases. In material specifications, the subject may also be the supplier, fabricator, or manufacturer supplying material, products, or equipment for use on the project.

Wherever "directed", "required", "prescribed", or "ordered" are used, the "direction", "requirement", "prescription", or "order" of the Contracting Officer is intended. Wherever something is to be "submitted", "submitting to", the Contracting Officer is intended. Similarly, wherever "approved", "acceptable", "suitable", "satisfactory", or similar words are used, the words mean "approved by", "acceptable to", or "satisfactory to" the Contracting Officer.

The word "will" generally pertains to decisions or actions of the Contracting Officer.

101.02 Specifications Format. These specifications are divided into 10 Divisions.

Division 100 consists of general contract requirements for which no direct payment is made. The requirements contained in Division 100 are applicable to all contracts.

Division 150 consists of project contract requirements that are applicable to all contracts. Work under Division 150 is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Divisions 200 through 600 consist of construction contract requirements for specific items of work. Work under these Divisions is paid for directly or indirectly according to Subsection 109.05 and the Section ordering the work. When there is no pay item in the bid schedule, no direct payment is made.

Division 700 contains the material requirements for Divisions 150 through 600. No direct payment is made in Division 700. Payment for material is included as part of the work required in Divisions 150 through 600.

The first three digits of the pay item number in the bid schedule identify the Section under which the work is performed.

101.03 Abbreviations. Whenever these abbreviations are used in the contract, they represent the following:

(a) Acronyms.

AASHTO — American Association of State Highway and Transportation Officials ACI — American Concrete Institute AGC — Associated General Contractors of America AISC — American Institute of Steel Construction AITC — American Institute of Timber Construction ANSI — American National Standards Institute APWA — American Public Works Association ARTBA — American Road and Transportation Builders Association ASME — American Society of Mechanical Engineers ASTM — ASTM International ATSSA — American Traffic Safety Services Association AWPA — American Wood Protection Association AWS — American Welding Society AWWA — American Water Works Association BMP — Best Management Practice CFR — Code of Federal Regulations CO — Contracting Officer and authorized representatives CRSI — Concrete Reinforcing Steel Institute EPA — Environmental Protection Agency FAR — Federal Acquisition Regulations (48 CFR Chapter 1) FHWA — Federal Highway Administration FICA — Federal Insurance Contributions Act FLH — Federal Lands Highway FSS — Federal Specifications and Standards FED-STD — Federal Standards FUTA — Federal Unemployment Tax Act ISO — International Organization for Standardization ISSA — International Slurry Surfacing Association JMF — Job-Mix Formula MASH — Manual for Assessing Safety Hardware MPI — Master Painters Institute MSDS — Material Safety Data Sheet MUTCD — Manual on Uniform Traffic Control Devices for Streets and Highways NCHRP — National Cooperative Highway Research Program NEMA — National Electrical Manufacturers Association NIST — National Institute of Standards and Technology OSHA — Occupational Safety and Health Administration PCI — Precast/Prestressed Concrete Institute PVC — Polyvinyl Chloride PTI — PostTensioning Institute SEP — Sand Equivalent Passing SF — Standard Form SI — International System of Units SSPC — The Society for Protective Coatings SWPPP — Storm Water Pollution Prevention Plan TAR — Transportation Acquisition Regulations (48 CFR Chapter 12) UL — Underwriter's Laboratory U.S. — United States of America USC — United States Code

(b) U.S. Customary unit abbreviations and symbols.

°F—degree Fahrenheittemperature
ft—feetlength
ft2—square feetarea
ft3—cubic feetvolume
in—incheslength
in2—square inchesarea
in3—cubic inchesvolume
lb—poundmass
mi—milelength
oz—ouncesmass
psi—pounds per square inchpressure
T—ton (2000 lb)mass
yd—yardslength
yd2—square yardsarea
yd3—cubic yardsvolume
s—secondtime
°—degreeplane angle
'—minuteplane angle
"—secondplane angle

(c) Metric unit abbreviations and symbols.

A—ampereelectric current
cd—candelaluminous intensity
°C—degree Celsiustemperature
d—daytime
g—grammass
H—Henryinductance
ha—hectarearea
Hz—hertz (s-1)frequency
J—joule (N•m)energy
K—kelvintemperature
kg—kilogrammass
L—litervolume
lx—luxilluminance
m—meterlength
mm—millimeterlength
m2—square meterarea
m3—cubic metervolume
min—minutetime
N—newton (kg•m/s2)force
Pa—pascal (N/m2)pressure
t—metric tonmass
V—volt (W/A)electric potential
W—watt (J/s)power
Ω—ohm V/Aelectric resistance

(d) Metric prefix symbols.

E—exa1018
P—peta1015
T—tera1012
G—giga109
M—mega106
k—kilo103
c—centi10-2
m—milli10-3
µ—micro10-6
n—nano10-9
p—pico10-12
f—femto10-15
a—atto10-18

(e) Slope notation (vertical : horizontal). For slopes flatter than 1V:1H, express the slope as the ratio of one unit vertical to a number of units horizontal. For slopes steeper than 1V:1H, express the slope as the ratio of a number of units vertical to one unit horizontal.

101.04 Definitions. The following definitions apply to this contract:

Award — The written acceptance of a bid by the CO.

Backfill — Material used to replace or the act of replacing material removed during construction. Material placed or the act of placing material adjacent to structures.

Base — The layer or layers of material placed on a subbase or subgrade to support a surface course.

Bid — A written offer by a bidder to perform work at a quoted price.

Bidder — An individual or legal entity submitting a bid.

Bid Guarantee — A form of security assuring that the bidder will not withdraw a bid within the period specified for acceptance and will execute a written contract and furnish required bonds.

Bid Schedule — The prepared schedule included with the bid forms, containing the estimated quantities of pay items for which unit bid prices are invited.

Bridge — A structure more than 20 feet (6 meters) long, including supports, spanning and providing passage over a depression, waterway, railroad, highway, or other obstruction.

Clear Zone — The portion of the roadside, including the shoulder, available for the safe use by an errant vehicle in which the driver may regain control of the vehicle.

Commercial Certification — See Subsection 106.03.

Construction Limits — The limits on each side of the project that establish the area disturbed by construction operations and beyond which no disturbance is permitted. Typically the construction limits are the same as the clearing limits, except when additional clearing is required.

Contract — The written agreement between the Government and the Contractor setting forth the obligations of the parties for the performance of and payment for the prescribed work.

Contracting Officer (CO) — An official of the Government with the authority to enter into, administer, and terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the CO acting within the limits of their authority as delegated by the CO.

Contract Modification — A written change in the terms of the contract. Contract modifications are of the following forms:

(a) Administrative change. A unilateral contract change, in writing, that does not affect the substantive rights of the parties (such as a change in the paying office or the appropriation data).

(b) Change order. A written order, signed by the CO, directing the Contractor to make a change that FAR Clause 52.243-4 Changes authorizes the CO to order without the Contractor's consent.

(c) Supplemental agreement. A contract modification that is accomplished by the signature of the CO (unilateral contract modification) or by the signature of the CO and the Contractor (bilateral contract modification).

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work.

Contract Time — The specified time allowed for completion of contract work.

Crashworthy — A highway feature that has been successfully crash tested under MASH or the NCHRP Report 350, Recommended Procedures for the Safety Performance Evaluation of Highway Features, or accepted through analysis by FHWA based on similarity to other crashworthy features.

Cross-Section — A vertical section of the ground or structure at right angles to the centerline or baseline of the roadway or other work.

Culvert — A structure, not classified as a bridge, that provides an opening under the roadway.

Day — A calendar day beginning and ending at midnight.

Density — Mass per unit volume of material. Specific gravity multiplied by the density of water.

Detour — A temporary rerouting of public traffic onto alternate existing roadways to avoid the work or part of the work.

Diversion — Defined as follows:

(a) A temporary rerouting of public traffic onto a temporary alignment within the project limits to bypass the work or a portion of the work.

(b) A temporary rerouting of water into a temporary channel or through a system of structures within the project limits to maintain water flow through or around the project.

Drawings — Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Federal Land Management Agencies — Federal agencies including the National Park Service, U.S. Forest Service, U.S. Fish & Wildlife Service, U.S. Army Corps of Engineers, Bureau of Land Management, and Bureau of Reclamation.

Government — The Government of the United States of America.

Highway, Street, or Road — A general term denoting a public way for purposes of vehicular travel, including the entire area within the right-of-way.

Lane Mile (Lane Kilometer) — An area of pavement one mile (kilometer) long and one lane wide; not including turn lanes, turnouts, parking area lanes, or other auxiliary lanes.

Layer — See "lift".

Lift — Defined as follows:

(a) When placing and compacting soils, aggregates, or pavement; a lift is a single, continuous layer of material that receives the same compactive effort throughout during a single work operation.

(b) When installing culvert pipe less than or equal to 48 inches (1200 millimeter) in diameter; the backfill material placed on both sides of the pipe is considered to be contained in the same lift when the material is placed to the same elevation on both sides of the culvert, the compactive effort applied to one side of the culvert is the same as that applied to the other, and the compactive effort is applied to both sides of the pipe in a continuous operation.

Material — Substances specified or necessary to satisfactorily complete the contract work.

Measurement — The process of identifying the dimensions, quantity, or capacity of a pay item. See Section 109 for measurement methods, terms, and definitions.

Notice to Proceed — Written notice to the Contractor to begin the contract work.

Pavement Structure — The combination of subbase, base, paving geotextiles, and surface courses placed on a subgrade to support and distribute the traffic load to the roadbed.

Pay Item — A specific item of work for which a unit and price is provided in the contract.

Payment Bond — The security executed by the Contractor and surety or sureties and furnished to the CO to ensure payments as required by law to persons supplying labor or material according to the contract.

Performance Bond — The security executed by the Contractor and surety or sureties furnished to the CO to guarantee completion of the contract work.

Plans — The contract plans furnished by the Government showing the location, type, dimensions, and details of the work.

Production Certification — See Subsection 106.03.

Professional Engineer — Engineers holding valid state licenses permitting them to offer engineering services directly to the public. Engineers that are experienced in the work for which they are responsible, take legal responsibility for their engineering designs, and are bound by a code of ethics to protect the public health.

Profile Grade — The trace of a vertical plane intersecting a particular surface of the proposed road construction located according to the plans, usually along the longitudinal centerline of the roadbed. Profile grade means either elevation or gradient of the trace according to the context.

Project — The specific section of the highway or other property on which construction is to be performed under the contract.

Right-of-Way — Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Roadbed — The graded portion of a highway prepared as a foundation for the pavement structure and shoulders.

Roadside — The area between the outside shoulder edge and the right-of-way limits. The area between roadways of a divided highway may also be considered roadside.

Roadway — In general, the portion of a highway, including shoulders, for vehicular use. A divided highway has two or more roadways. In construction specifications, the portion of a highway within the construction limits.

Roadway Prism — The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance along the centerline of the roadway.

Roller Pass— One trip of a roller in one direction over one spot.

Shoulder — A portion of the roadway contiguous with the traveled way that accommodates pedestrians, bicycles, stopped vehicles, and emergency use; as well as for lateral support of the subbase, base, and surface courses.

Sieve — See AASHTO M 92.

Solicitation — The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Special Contract Requirements (SCR) — Additions and revisions to the standard specifications applicable to an individual project.

Specifications — The written requirements for performing work.

Standard Forms (SF) — Numbered forms issued by the General Services Administration for use as contract documents.

Standard Specifications — The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects approved for general application and repetitive use.

Station — A precise location along a survey line.

Structures — Bridges, culverts, catch basins, drop inlets, retaining walls, cribbing, manholes, endwalls, buildings, sewers, service pipes, underdrains, foundation drains, and other constructed features that may be encountered in the work.

Subbase — The layer or layers of material placed on a subgrade to support a base.

Subcontract — The written agreement between the Contractor and an individual or legal entity prescribing the performance of a specific portion of the work.

Subcontractor — An individual or legal entity with which the Contractor sublets part of the work. This includes subcontractors in all tiers.

Subgrade — The top surface of a roadbed upon which the pavement structure, shoulders, and curbs are constructed.

Substantial Completion — The point at which the project is complete such that it can be safely and effectively used by the public without further delays, disruption, or other impediments. For conventional bridge and highway work, the point at which bridge deck, parapet, pavement structure, shoulder, drainage, sidewalk, major demolition, roadway obliteration, permanent signing and markings, traffic barrier, safety appurtenance, utility, and lighting work is complete.

Substructure — Components of a bridge below the bearings of simple and continuous spans, skewbacks of arches, and tops of footings of rigid frames including backwalls, wingwalls, and wing protection railings.

Suitable Material — Rock or earth material that will provide stable foundations, embankments, or roadbeds, and is free of organic matter, muck, frozen lumps, roots, sod, or other deleterious material. Suitable material may require drying or adding water, root picking, and other methods of manipulation before use. Suitable material includes the classifications of material for which the project was designed.

Superintendent — The Contractor's onsite representative who has authority to act for the Contractor and is responsible for directing and supervising construction operations on behalf of the Contractor.

Superstructure — The entire bridge, except the substructure.

Surety — An individual or corporation legally liable for the debt, default, or failure of a Contractor to satisfy a contract obligation.

Surface Course — The top layer or layers of a pavement structure designed to accommodate the traffic load and resist skidding, traffic abrasion, and weathering.

Target Value — A number established as a center for operating a given process. Once established, adjustments should be made in the process as necessary to maintain a central tendency about the target value. Test results obtained from a well-controlled process should cluster closely around the established target value and the mean of the test results should be equal to or nearly equal to the established target value.

Traveled Way — The portion of the roadway designated for the movement of vehicles, exclusive of shoulders.

Unsuitable Material — Material not capable of creating stable foundations, embankments, or roadbeds. Unsuitable material includes muck, sod, or soils with high organic contents.

Work — The furnishing of labor, material, equipment, and other incidentals necessary to complete the project according to the contract.

Section 101 Section 101

Section 102. — BID, AWARD, AND

EXECUTION OF CONTRACT

102.01 Acquisition Regulations. Bid, award, and execution of the contract is governed by the FAR and TAR.

102.02 Preparation of Bids. Follow the requirements of FAR Clause 52.214-18 Preparation of Bids Construction.

Execute and submit required standard forms, bid schedules, and solicitation provisions contained in the solicitation as part of the bid.

Complete SF 1442, Solicitation, Offer, and Award, and sign as follows:

(a) Individuals. Sign your individual signature. For individuals doing business as a firm, follow the individual signature with the individual's typed, stamped, or printed name and the words, "an individual doing business as (name of firm) ".

(b) Limited liability partnerships and partnerships. Submit a list of partners having authority to bind the partnership. One of the listed partners must sign on behalf of the partnership.

(c) Corporations. Sign in the corporate name, followed by the word "by" and the signature and title of the person authorized to sign. Submit evidence from the corporation that the person signing has authority to bind the corporation.

(d) Joint ventures. Submit a copy of the Joint Venture agreement. Sign the SF 1442 according to the Joint Venture agreement.

(e) Limited liability company. Sign in the company name, followed by the word "by" and the signature of the person authorized to sign. Submit evidence that the individual executing the document has authority to bind the company.

(f) Agents. When an agent signs, other than as stated in Subsection 102.02(a) through (e), furnish satisfactory evidence that the agent has authority to bind the bidder.

Insert a numeric unit bid price for each pay item for which a quantity appears in the bid schedule. Multiply the unit bid price by the quantity for each pay item and show the amount bid. When mathematical checks made by the Government show a mistake in the amount bid, the corrected unit price extension governs.

When the words "lump sum" appear as a unit bid price, insert an amount bid for each lump sum pay item.

When the words "contingent sum" or "fixed rate" appears as a unit bid price, include the Government inserted amount bid for the pay item in the total bid amount.

Total the amounts bid for each pay item and show the total bid amount.

The quantities listed in the bid schedule are approximate, unless designated as a contract quantity, and are used for the comparison of bids. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. The scheduled quantities may be increased, decreased, or deleted. Bid schedule quantities are considered the original contract quantities.

102.03 Bid Guarantee. Follow the requirements of FAR Clause 52.2281 Bid Guarantee.

(a) General. Submit the bid guarantee on SF 24, Bid Bond. If the bid guarantee is other than a corporate or individual surety, sign the SF 24 as the principal and make a statement on the form pledging the security. Make checks or money orders payable to the agency issuing the solicitation.

(b) Power of attorney. A corporate surety shall submit a current power of attorney for the signing agent or attorney-in-fact with each SF 24.

(c) Evidence of guarantee assistance. A surety that has a guarantee of assistance from the Small Business Administration (SBA) shall submit a copy of SBA Form 990, Surety Bond Guarantee Agreement with each SF 24. In addition, submit a power of attorney for the surety representative identified in the agreement.

102.04 Individual Surety. Follow the requirements of FAR Clause 52.228-11 Pledges of Assets.

Complete and date the SF 28, Affidavit of Individual Surety after the solicitation date. The individual surety shall personally sign the SF 28. Bidders cannot serve as their own surety. See FAR 28.203 Acceptability of Individual Sureties.

After reviewing the SF 28, the surety may be requested to submit further documentation with respect to its assets, debts, or encumbrances. The information may be required to be furnished under oath. Failure of the surety to respond with the requested documentation within 7 days of receipt of the request is cause for rejection of the surety.

Any material misstatement by the surety, overstatement of assets (either as to ownership or value), or understatement of liabilities is cause for rejection of the surety. Substitution of individual sureties to support a bid bond after the bid opening will not be permitted.

Furnish documentary evidence as to the ownership and value of the assets pledged in support of the bond and details of the security interest in the assets by the individual sureties for the apparent low bidder within 14 days after the opening of bids. Failure to submit evidence within the time required will be grounds for declaring the surety unacceptable.

In addition the CO may, after reviewing the SF 28 and documentary information on the security interest and the assets pledged; request the surety to submit further information and documents with respect to the documents submitted. The CO may require such information to be furnished under oath. Failure of the surety to accept such mail or failure of the surety to respond with the requested information or documents within 7 days of receipt of the request; will be cause for rejection of the surety.

These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.

102.05 Public Opening of Bids. Bids will be publicly opened at the time specified in the SF 1442, Solicitation, Offer, and Award. Their contents will be made public information. The Government reserves the right to reject bids as set forth in the FAR, Part 14.

102.06 Performance and Payment Bonds. Follow the requirements of FAR Clause 52.228-15 Performance and Payment Bonds – Construction.

Use SF 25, Performance Bond and SF 25A, Payment Bond for submitting the bonds.

The requirements contained in Subsections 102.03 and 102.04 relating to power of attorney, evidence of guarantee assistance, and individual sureties also apply to performance and payment bonds.

Submit the documentary evidence for individual sureties at the same time as the Affidavit of Individual Surety and security interest in assets pledged. A Contractor submitting an unacceptable individual surety in satisfaction of a performance or payment bond before the issuance of the Notice to Proceed will be permitted one opportunity to substitute an acceptable surety or sureties within 7 days of receipt of notification that the surety is unacceptable.

The Government's right to direct the substitution of sureties to ensure the continuing acceptability of the bonds during the performance of the Contract according to FAR Clause 52.228-2 Additional Bond Security is not restricted.

These requirements are in addition to the requirements in FAR Subpart 28.203, except where in conflict with the requirements in the FAR, in which case the FAR controls.

Section 102 Section 102

Section 103. — SCOPE OF WORK

103.01 Intent of Contract. The intent of the contract is to provide for the construction and completion of the work described. The precise details of performing the work are not described, except as considered essential for the successful completion of the work. Furnish labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

103.02 Disputes. Follow the requirements of FAR Clause 52.2331 Disputes (Alternate I).

When requesting a CO's decision on an interpretation of contract terms for the recovery of increased costs; quantify the amount and certify the amount if required by FAR Clause 52.233-1 Disputes (Alternate I). Include an explanation of the interpretation of contract terms, the contract clause under which the claim is made, supporting documentation, and adequate cost data to support the amount claimed.

103.03 Value Engineering. Follow the requirements of FAR Clause 52.2483 Value Engineering Construction.

Before undertaking significant expenditures, submit a written description of the value engineering change proposal (VECP) concept. Within 14 days the CO will inform the Contractor as to whether the concept appears to be viable or if the concept is unacceptable. If the CO indicates that the concept appears to be viable, prepare and submit the formal VECP proposal.

103.04 Contractor Records. Upon request, provide records related to the contract to the Government for up to 3 years after final payment or for longer periods as provided by law.

Include a provision in subcontracts at all tiers giving the Government the same rights as provided above with respect to the subcontractor's records.

103.05 Partnering. To facilitate this contract, the CO offers to participate in a formal partnership with the Contractor. This partnership draws on the strengths of each organization to identify and achieve reciprocal goals. Partnering strives to resolve problems in a timely, professional, and non-adversarial manner. If problems result in disputes, partnering encourages, but does not require, alternative dispute resolution instead of the formal claim process. The objective is effective and efficient contract performance to achieve a quality project within budget and on schedule.

Acceptance of this partnering offer by the Contractor is optional, and the partnership is bilateral.

If the partnering offer is accepted, mutually agree with the CO on the level of organizational involvement and the need for a professional to facilitate the partnering process. Engage the facilitator and other resources for key Contractor representatives and the CO to attend a partnership development and teambuilding workshop usually between the time of award and the Notice to Proceed. Hold additional progress meetings upon mutual agreement.

The direct cost of partnering facilities, professional facilitation, copying fees, and other miscellaneous costs directly related to partnering meetings will be shared by the Contractor and Government. Secure and pay for facilities, professional fees, and miscellaneous requirements. Submit invoices to the CO. The Government will reimburse the Contractor for 50 percent of the agreed costs incurred for the partnering process. The Government’s share will not exceed $5,000.

Each party is responsible for making and paying for its own travel, lodging, and meal arrangements. No time extension for the completion of the project will be made for the use of partnering.

Section 103 Section 103

Section 104. — CONTROL OF WORK

104.01 Authority of the Contracting Officer (CO). The CO may delegate authority to representatives to decide on acceptability of work, progress of work, suspension of work, interpretation of the contract, and acceptable fulfillment of the contract. The term "CO" includes authorized representatives of the CO, including inspectors, acting within the limits of their authority as delegated by the CO.

104.02 Authority of Inspectors. Inspectors are authorized to inspect work including the preparation, fabrication, or manufacture of material for the project. The inspector is not authorized to alter or waive contract requirements, issue instruction contrary to the contract, act as foreman for the Contractor, or direct the Contractor's operations. The inspector has authority to identify non-conforming work until the issue can be referred to and decided by the CO. The inspector may take necessary action to prevent imminent and substantial risk of death or injury including stopping work.

104.03 Specifications and Drawings. Follow the requirements of FAR Clause 52.236-21 Specifications and Drawings for Construction.

(a) General. Review and submit documents required to construct the work for accuracy, completeness, and compliance with the contract for approval by the CO. Documents submitted without evidence of Contractor approval may be returned for resubmission. Time for approval starts over when documents are returned for revision or if additional information is requested by the CO. Do not perform work related to submitted documents or drawings before approval of the CO. Obtain written approval before changing or deviating from the approved drawings.

(1) Documents other than drawings. Documents other than drawings include descriptive literature, illustrations, schedules, performance and test data, and similar material submitted by the Contractor to certify or explain, in detail, specific portions of the work required by the contract. Unless otherwise indicated in the contract, submit 3 paper copies and an electronic copy for review. Allow 14 days for approval by the CO unless otherwise specified.

(2) Drawings. Drawings include:

(a) Layouts that show the relative position (vertical and horizontal as appropriate) of work to be performed;

(b) Fabrication details for manufactured items and assemblies;

(c) Installation and erection procedures;

(d) Details of post-tensioning and other systems;

(e) Detailed trench and excavation procedures that conform to OSHA requirements;

(f) Traffic control implementation drawings; and

(g) Methods for performing work near existing structures or other areas to be protected.

Show drawing dimensions in the same units as shown in the plans. Limit drawings to a maximum size of 24 by 36 inches (610 by 920 millimeters). Include on each drawing and calculation sheet, the project number, name, and other identification as shown in the contract.

Submit 3 paper sets of drawings, an electronic set of the drawings, and supporting calculations. Drawings will be reviewed in the order they are received. Allow 40 days for CO approval of railroad structure drawings and 30 days for approval of other drawings. Submit additional specific drawings for unique situations to clarify layout, construction details, or method when requested by the CO.

(b) Specific requirements for concrete and miscellaneous structures.

(1) Submit drawings for the following:

(a) Site-specific layouts for all wall types and gabion installations;

(b) Gabion and revet mattress details and installation procedures;

(c) Forms and falsework for cast-in-place non-bridge concrete structures and retaining walls less than or equal to 6 feet (1.8 meters) in height;

(d) Fabrication drawings for bridge railings and parapets;

(e) Fabrication drawings for prestressed members;

(f) Fabrication and installation drawings for expansion joint assemblies;

(g) Fabrication drawings for bearing assemblies;

(h) Construction joint location and concrete deck placement sequences not according to the plans;

(i) Erection diagrams for Soil-Corrugated Metal Structure interaction systems (multi-plate structures);

(j) Structural steel fabrication drawings;

(k) Utility hangar details;

(l) Fabrication and installation drawings for precast items; and

(m) Site-specific layouts for rockeries.

(2) Submit drawings that bear the seal and signature of a professional engineer proficient in the pertinent design field for the following:

(a) Forms and falsework for cast-in-place concrete structures greater than 6 feet (1.8 meters) in height;

(b) Shoring systems and cofferdams greater than 6 feet (1.8 meters) in height;

(c) Shoring systems that support traffic loadings;

(d) Bridge concrete forms, including deck forms; except for railings, parapets, and components less than 6 feet (1.8 meters) in height;

(e) Containment structures for bridge work;

(f) Girder…