CONSTRUCTION Wahkeena Morneault.pdf
PDF 416 KB Posted
- Attached to
- Rock structure restoration Federal contract opportunity
- Solicitation number
- AG-046W-S-11-0016
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachments.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION PAGE OF PAGES
(THIS IS NOT AN ORDER) THIS RFQ x IS IS NOT A SMALL BUSINESS SET- ASIDE 1 65
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING
AG-046W-S-11-0016 05/10/2011 UNDER BDSA REG. 2
AND/OR DMS REG. 1
5a. ISSUED BY 6. DELIVER BY (Date) Mt Hood National Forest 16400 Champion Way Sandy, OR 97055
See Section F
5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER x OTHER (See Schedule)
AREA CODE NUMBER 9. DESTINATION
Judy Shelby Technical Contact: Michael Morneault
668-1601 352-1231
a. NAME OF CONSIGNEE
8. TO:
a. NAME b. COMPANY b. STREET ADDRESS
c. STREET ADDRESS c. CITY
d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5A ON OR
BEFORE CLOSE OF BUSINESS
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5A.
This request does not commit the Government to pay any costs incurred in the preparation of the
May 27, 2011 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT
PRICE
AMOUNT
(a) (b) (c) (d) (e) (f)
Rock Structures Restoration at Wahkeena Picnic Ground and Eagle Creek Group Camp Ground
Tax Identification Number
DUNS Number
Are You Registered in the Central Contractors Register
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
12. DISCOUNT FOR PROMPT PAYMENT NUMBER PERCENTAGE
NOTE: Additional provisions and representations x are are not attached.
13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF
a. NAME OF QUOTER SIGN QUOTATION QUOTATION
b. STREET ADDRESS 16. SIGNER
a. NAME (Type or print) b. TELEPHONE
c. COUNTY AREA CODE
d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER
NSN 7540-01-152-8084
Previous edition not usable
18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
CONSTRUCTION RFQ SOL NO AG-046W-S-11-0016
UNIT Columbia River Gorge national Scenic Area PROJ NAME Wahkeena and Eagle Creek Stonework Restoration
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
METHOD
OF MEAS.
PAY
UNIT
EST.
QTY.
PRICE
TOTAL
PRICE
*0001
Wahkeena PG – Picnic Shelter Fireplace Renovation
LSQ
LS
*0002
Wahkeena PG West Picnic Site Stove
Wahkeena PG – Middle Picnic Site Stove Reconstruction
Whakeena PG – East Picnic Stove Reconstruction
Eagle Creek Overlook Campground Construct Fire Rings
AQ
EA
Campground Rebuild Fire Rings
Campground – Rebuild Fire Ring
TOTAL – ALL ITEMS
XXXXXX
* Base Bid Items Other Items will be awarded upon availability of funds
Designated Method of Measurement:
LSQ – Lump Sum Quantity; AQ – Actual Quantity
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Scope of Contract
Contractor shall provide labor, material, supplies and incidentals to restore stone fireplaces at:
1. Wahkeena Day Use Area –
a) Picnic Shelter – Clean and refurbish Fireplace
b) Reconstruct, whole or partially, 3 picnic site masonry stoves
2. Eagle Creek Overlook
a) Construct and/or build fire rings
Project Location
Wahkeena Day Use Area
From Portland: Take Interstate 84 eastbound to Exit 28; proceed east along the Historic Columbia River Highway (HCRH) to the Project Site
From Hood River: Take I-84 west bound to Exit 35; proceed west on the HCRH approximately three miles to the Project Site.
Eagle Creek Overlook
From Portland: Take I-84 east bound to Exit 41; proceed down the off ramp to the stop sign; turn left and proceed to the Project Site
From Hood River: Take I-84 west bound to exit 40; leave and go under the interstate and head east bound to MP 41; follow directions from Portland.
Price Range
Less than $25,000 for Base Bid Between $25,000 and $100,000 for Base bid plus optional items.
AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
http://www.arnet.gov/far/�
SECTION F--DELIVERIES OR PERFORMANCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/
52.242-14 Suspension of Work (APR 1984)
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
WORK SCHEDULE
a) Construction activity shall be limited to the hours between 7 am. And 6 pm, Monday through Friday, unless other hours are approved in writing by the CO. The Contractor shall conduct activities so that interference with the public shall be kept at a minimum. The project site shall be open to the public access and free of hazards on weekends. Any activities requiring closure to the public shall be scheduled with the COR at least 7 days in advance.
b) The Contractor shall use measures and precautions necessary to warn and protect the public and Government personnel during work at the project site. Such actions include, but are not limited to, furnishing and maintaining barricades and signs around the work site and roping off the area.
SECTION G--CONTRACT ADMINISTRATION DATA
AGAR 452.215-73 Post Award Conference (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled and held within 14 days after the date of contract award. The conference will be held at:
USDA Mt Hood National Forest Headquarters 16400 Champion Way Sandy Oregon 97055.
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause contained elsewhere in the contract.
DESCRIPTION
DELIVERY
QUANTITY
AND
DATE
LOCATION
ESTIMATED
VALUE
New Stone
More than 100
cu. ft. available
As needed
Columbia Gorge (Herman Creek Work center)
Fire Brick
9”x 4 1/2”x 2 ½” Approximately 200 bricks
Columbia Gorge (Herman Creek Work Center)
Concrete Footing for West Stove at Wehkeena
$300.00
Schedule of Values
Before the first request for progress payment, the Contractor shall submit to the Contracting Officer a Schedule of Values allocated to the various portions of the work. The Contractor shall break out each lump sum bid by Section with costs (labor, materials and equipment). The Schedule of Values shall be prepared in such form and supported by such data to substantiate its accuracy. The contracting Officer shall use this schedule as the basis for progress payments.
SECTION H--SPECIAL CONTRACT REQUIREMENTS
FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Not applicable
(b) Weather conditions Normal, hot in summers, cool in Fall and Spring, cold in Winter; rain at any time.
(c) Transportation facilities: Wahkeena Day Use Area is accessible via Historic Columbia River Highway.
Eagle Creek Day Use Area is accessible by I-84, Exit 41. See Project Location.
Utilities
Utility
Rate to be Charged
Restrictions
Comments
Water
None
Reasonable Use
Potable water only, do not use creek for any operations
Sanitation
None
Reasonable Use
Public Restroom, Keep Clean
The contractor shall at its expense and in a manner satisfactory to the Contracting Officer install and maintain all necessary temporary connections and distribution lines. The Contractor shall conserve any utilities furnished without charge. Before final acceptance of the work by the Government, the Contractor shall remove all temporary connections, distribution line and appurtenances.
The Contracting Officer will inform the Contractor at the Pre-work Conference which sanitary facilities will be available. The Contractor shall be prudent I their use of the facilities and shall not discharge any detrimental material down the drains.
Eagle Creek Overlook is a reservation campground. Work shall proceed as to minimize noise and other disruptions to campers. Work area shall be maintained in a safe manner.
Product Substitution
Any modification of designs, materials, products or equipment occurring because of a substitution proposed by the Contractor will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitution will not affect the Contractor’s responsibility for each substitution. The Contractor may formally request substitutions after award of the contract has been made. No approvals will be made prior to award.
Submittals, Shop Drawings, Material Certifications and Testing Reports
Does the acquisition require the submission of shop drawings, submittals, material certifications or testing reports?
Yes X
No
If yes do the drawings need to be reproducible:
Yes No _X__
SUBMITTALS
The following shall be submitted on this project:
Title Referenced By Clause Number or Specification Section Time of Government Approval after Submittal, Days Fire stoves: Layout of Stones 04425 5 days
(INSERT APPLICABLE TITLE, REFERENCE, AND TIME)
SHOP DRAWINGS
The following shop drawings shall be submitted on this project:
Title Referenced By Specification No.
Time of Government Approval after Submittal
Metal Cover 05500 5 Days Grill 05500 5 days
(INSERT APPLICABLE TITLE, REFERENCE, AND TIME)
MATERIAL CERTIFICATIONS AND TESTING REPORTS
The following material certifications and/or testing reports shall be submitted on this project:
Title Referenced By Specification No.
Concrete 03001 Mortar & Grout 04065
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html
52.209-6 Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (MAY 2008) (Applicable if contract exceeds $30,000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003) 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (FEB 1988) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) (Applicable if contract exceeds $10,000) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-26 Equal Opportunity (MAR 2007) (Applicable if contract exceeds $10,000) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) (Applicable if contract exceeds $10,000) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) (Applicable if contract exceeds
$10,000) 52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (DEC
2007) 52.223-5 Pollution Prevention and Right-to-Know Information (AUG 2003) 52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual) 52.223-18 Contractor Policy to ban Text Messaging while driving (Sep 2010) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) http://www.usda.gov/procurement/policy/agar.html�
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) (Applicable if contract exceeds $30,000) 52.228-11 Pledges of Assets (FEB 1992) (Applicable if contract exceeds $30,000) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) (Applicable if contract exceeds $30,000) 52.228-14 Irrevocable Letter of Credit (DEC 1999) (Applicable if contract exceeds $30,000) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-18 Availability of Funds (APR 1984)
52.232-23 Assignment of Claims (JAN 1986) 52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration (OCT 2003) 52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR
1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)
Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)
Alternate II (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (MAR 2009) 52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV 1996)
(Applicable if contract is over $30,000) 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.204-7 Central Contractor Registration (APR 2008)
(a) Definitions. As used in this clause—
“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.
“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.
“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.
“Registered in the CCR database” means that—
(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and
(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.
(b)
(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.
(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.
(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number—
(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.
The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.
(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.
Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.
http://fedgov.dnb.com/webform�
(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.
(g)
(1)
(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:
(A) Change the name in the CCR database;
(B) Comply with the requirements of Subpart 42.12 of the FAR;
(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.
(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.
(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.
(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961-5757.
http://www.ccr.gov/�
FAR 52.225-9 Buy American Act-Construction Materials (Sept 2010)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate ``none'']
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
FAR 52.228-13 Alternative Payment Protections (JUL 2000) (Applicable to Contracts >$30,000 but < $150,000)
(a) The Contractor shall submit one of the following payment protections:
Payment Bond or irrevocable letter of credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 15 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
Order of Precedence--Construction
Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:
(1) The Schedule (excluding the specifications)
(2) Representations and Other Instructions
(3) Contract Clauses
(4) Other Documents, Exhibits, and Attachments
(5) The Specifications
(6) Drawings
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
General Decision Number: OR100052 02/25/2011 OR52 Page 21 - 28
Exhibit 01310 – Description of Work and Measurement and Payment Page 29 - 30
Exhibit 01350 – Special Procedures Page 31 - 32
Exhibit 01400 – Quality Requirements Page 33
Exhibit 01600 – Product Requirements Page 34
Exhibit 01738 – Selective Demolition Page 35 - 36
Exhibit 01740 – Cleaning Page 37
Exhibit 03001 – Concrete Page 38 - 40
Exhibit 04065 – Mortar and Grout Page 41 - 43
Exhibit 04425 – Field Stone Page 44 - 46
Exhibit 05500 – Metal Fabrications Page 47 - 49
Experience Questionaire Page 50 - 52
Exhibit 1 – 12 See separate Attachment
General Decision Number: OR100052 02/25/2011 OR52
Superseded General Decision Number: OR20080052
State: Oregon
Construction Type: Building
County: Hood River County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 03/12/2010 1 04/23/2010 2 05/14/2010 3 06/04/2010 4 07/02/2010 5 08/06/2010 6 08/27/2010 7 10/22/2010 8 11/26/2010 9 12/31/2010 10 01/21/2011 11 01/28/2011 12 02/25/2011
BROR0001-019 06/01/2010
Rates Fringes
BRICKLAYER.......................$ 32.89 17.43
TILE FINISHER....................$ 22.01 11.72
TILE SETTER......................$ 28.90 15.26
CARP0001-032 06/01/2007
Carpenters:
Including Metal stud installation and form work..$ 27.56 13.30
CARP9001-004 06/20/2007
Acoustical Ceiling Installer
& Drywall Hanger.................$ 27.95 13.52
ELEC0048-024 01/01/2011
ELECTRICIAN
Low voltage wiring for alarms......................$ 26.95 12.35 + 3% Low voltage wiring for computers...................$ 18.65 12.35 + 3%
* ENGI0701-027 01/01/2011
Power equipment operators:
GROUP 1.....................$ 37.27 12.35
GROUP 1A....................$ 39.13 12.35
GROUP 1B....................$ 41.00 12.35
GROUP 2.....................$ 35.64 12.35
GROUP 3.....................$ 34.65 12.35
GROUP 4.....................$ 33.71 12.35
GROUP 5.....................$ 32.60 12.35
GROUP 6.....................$ 29.61 12.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley
Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Bulldozer: Over 120,000 lbs and above;
Bulldozer: D-10, D-11 and similar type; Loader: 120,000 lbs and above; Excavator: over 130,000 lbs and above
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons
(and less than 150 feet boom); Bulldozer: over 70,000 lbs up to and including 120,000; Loader: 60,000 lbs and less than 120,000 lbs; Excavator: over 80,000 lbs through 130,000 lbs
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/BACKHOE-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments; BLADE:
Blade operator; Tractor operator with boom attachment;
DRILLING: Churm Drill and Earth Boring Machine Operator;
Directional Drill Operator over 20,000 lbs pullback; CRANE:
Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; Asphalt Paver; Mechanic; Bulldozer:
over 20,000 lbs and more than 100 horse and up to 70,000 lbs; Loader: 25,000 lbs and less than 60,000 lbs; Screed;
Excavator: over 20,000 lbs through 80,000 lbs.
GROUP 5: TRACKHOE/BACKHOE-HYDRAULIC: up to and including 20,000 lbs.; Open wheeled type; DRILLING: Churm Drill and
Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; Concrete Pumper; Concrete
Paver; forlkift over 5 ton; Bulldozer: 20,000 lbs or less, or 100 horse or less; Loader: ruber tired type, less than
25,000 lbs; Roller
GROUP 6: LOADERS: (less than 1 cu yd.); Oiler; Crane oiler;
forklift; Broom; Roller (Non-Asphalt)
IRON0029-013 07/01/2010
IRONWORKER (Reinforcing and
Structural)......................$ 33.12 17.40
LABO0001-030 06/01/2008
Laborers: (Mason Tender-Cement/Concrete)..........$ 25.75 11.25
LABO0001-031 06/01/2008
Laborers: (Mason Tender-Brick)...$ 25.75 11.25
LABO0003-017 06/01/2010
Laborers:
GROUP 1.....................$ 25.25 12.07
GROUP 4.....................$ 26.80 12.07
GROUP 5.....................$ 21.99 12.07
LABORER CLASSIFICATIONS
GROUP 1: Form-Stripping
GROUP 4: Grade Checker, Pipelayer
GROUP 5: Flagger
PAIN0055-025 07/01/2009
PAINTER
BRUSH, ROLLER AND SPRAY.....$ 19.59 7.24
PAIN0055-026 08/01/2010
DRYWALL FINISHER/TAPER...........$ 31.76 11.68
PLAS0555-006 06/01/2009
CEMENT MASON/CONCRETE FINISHER...$ 28.87 15.59
PLUM0290-008 04/01/2010
Plumbers and Pipefitters.........$ 35.69 21.04
SHEE0016-016 07/01/2009
Sheet Metal Worker Excluding Metal Roof........$ 34.42 16.92
SUOR2009-036 11/09/2009
ELECTRICIAN......................$ 27.06 7.63
LABORER: Common or General......$ 25.21 4.78
SHEETMETAL WORKER (Metal Roof
Installation Only)...............$ 23.65 6.33
SPRINKLER FITTER (Fire Sprinklers)......................$ 25.00 8.29
TEAM0037-008 06/01/2009
Truck drivers:
GROUP 1.....................$ 26.90 12.75
GROUP 2.....................$ 27.02 12.75
GROUP 3.....................$ 27.15 12.75
GROUP 4.....................$ 27.41 12.75
GROUP 5.....................$ 27.63 12.75
GROUP 6.....................$ 27.79 12.75
GROUP 7.....................$ 27.99 12.75
TRUCK DRIVERS CLASSIFICATIONS
GROUP 1: Dump trucks, side, end and bottom dumps: up to and including 10 cu. yds.
GROUP 2: Dump trcuks/articulated dumps 6 cu to 10 cu.;
GROUP 3: Dump trucks, side, end and bottom dumps: over 10
cu. yds. and including 30 cu. yds., includes articulated dump trucks
GROUP 4: Dump trucks, side, end and bottom dumps: over 30 cu.
yds. and including 50 cu. yds. and includes articulated
GROUP 5: Dump trucks, side, end and bottom dumps: over 50
cu. yds. and including 60 cu. yds. and includes articulated
GROUP 6: Dump trucks, side, end and bottom dumps: over 60
cu. yds. and including 80 cu. yds. and includes articulated
GROUP 7: Dump trucks, side, end and bottom dumps: over 80
cu. yds. and including 100 cu. yds., includes articulated
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction
Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considersrelevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board
(formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
SECTION 01310
PART 1 – GENERAL
DESCRIPTION OF WORK AND MEASUREMENT AND PAYMENT
1.01 DESCRIPTION OF WORK
A. Wahkeena Picnic Ground:
1. Clean fire area and repoint mortar joints
2. Fabricate and install metal cover
3. Rebuild, in whole or in part, 3 picnic site stoves B. Eagle Creek Overlook Reservation Campground: Construct and/or Restore the designated fire rings to their original configuration or the plan in this contract.
1.02 DEFINITIONS
A. Repoint
1. Leaving stones in place
2. Cleaning joints of old mortar and/or cement
3. Installing new mortar as needed on all joints B. Remortar
1. Complete disassembly of rock structure
2. Cleaning off rock surfaces of old mortar/cement and other foreign materials
3. Rebuild structure using new mortar C. Foreign Materials
1. Dirt
2. Leaves and other organic matter
3. Moss
1.03 WORK RESTRICTIONS
A. Public Access
1. Treat the public in a courteous manner. Report any interference to the CO officer.
2. Wahkeena: Public access to the site will be maintained throughout the contract.
3. Eagle Reservation Campground
a. The public does not normally have vehicle access to the site.
b. The public does have pedestrian access.
c. The gate will be kept close and locked during work hours.
B. Site Access: All sites are accessible on foot. All sites are behind locked gates, Contractor may check out a Forest Service key at:
Columbia River gorge National Scenic area 902 Wasco St, Suite 200 Hood River, OR 97031 541.308.1700USDA Forest Service Project Specifications January, 2011
Januaury, 2011 Wahkeena/Eagle Creek Stonework Restoration CSI Spec- 01310 Page 2 of 3
Final payment will not be made until the key has been returned to the government.
C. Use of Site:
1. Limited to areas indicated.
2. Protect existing landscaping from damage.
3. Maintain protected access and egress.
D. Limit use of premises to allow:
1. Government occupancy.
2. Work by Government and work authorized by the government.
3. Use of premises by public.
1.04 MEASUREMENT AND PAYMENT
A. Measurement
1. Mobilization will not be measured as a separate item
2. Wahkeena - Picnic Shelter Fireplace
a. Cleaning of Fire shelf and chimney exterior of all foreign materials
b. Filling-in of chimney cavity
c. Installation of Fire Brick lining
d. Fabrication and installation of Metal Cover
3. Wahkeena – Picnic Site Fire Stoves
a. All Work at middle and east stoves, including:
i. Repointing and/or remortaring of stones
ii. Fabrication and installation of Plate Grills
b. All work at west stove
i. Disassembly of existing stove
ii. Reconstruction of new stove on government built base
iii. Construction of new stove including grill
iv. Grading old site to blend into surroundings
v. Fabrication and installation of Plate Grill
4. Eagle Creek CG:
a. Disassembly, in part or total, of designated fire rings
b. Construction of concrete or gravel base
c. Remortaring of stones in original positions and orientation
d. Fabrication and installation of Plate Grills
e. Fire Ring 14 has an existing grill and will be measured separately B. Payment:
1. Lump Sum: The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "All." Estimated quantities of lump sum work shown in the contract are approximate.
2. Each: The quantity is the actual number of units completed and accepted.
Januaury, 2011 Wahkeena/Eagle Creek Stonework Restoration CSI Spec- 01310 Page 2 of 3
SECTION 01350
1.PART 1 – GENERAL
SPECIAL PRODCEDURES
1.01 SUMMARY
A. Section Includes:
1. Restoration procedures.
2. Alteration procedures.
3. Hazardous materials procedures.
B. Related Sections:
1. Section 01738 - Selective Demolition.
2. Section 04425 - Field Stone.
1.02 REFERENCES
A. 29 CFR 1926.1101. OSHA Occupational Exposure to Asbestos, Construction Industry Standard.
B. U.S. Environmental Protection Agency National Emissions Standards for Hazardous Air Pollutants
(NESHAPS). (Code of Federal Regulations Title 40, Part 61, Subparts A and M.)
1.03 PREPARATION
A. Determine type and quality of existing elements by inspection and/or necessary testing, and by existing workmanship as a minimum standard.
B. Cut, move or remove elements as necessary for access to restoration work; replace and restore at completion.
1.04 RESTORATION PROCEDURES
A. Existing Stone:
1. General: The fireplace, stoves, and fire rings must match the original to the greatest degree practicable.
2. Document existing structure with black and white photography, each elevation.
a. Provide a archival quality (“Gold”) CD for each structure containing:
b. Before and after photographs for all four sides and the top.
i. The side shots will be perpendicular to the surface.
ii. Details shots as ordered by CO
c. Identify each shoot with name of the structure and the orientation
3. Provide white marking paint of sufficient durability for this Project. Marking paint shall be removable and shall degrade within one year.
4. Method of marking shall be approved by the C.O. prior to prosecution of work. All stones with exposed surfaces shall be marked before removal.
5. Provide test area for marking paint test and review by the C.O.USDA Forest Service Project Specifications
January, 2011 Wahkeena/Eagle Cr Stonework Restoration CSI Spec- 01350 Page 1of 2
6. Placement drawing
a. Before demolition commences, set up a coordinate system with a baseline. Submit to the C.O. for approval.
b. Before removing a stone, record its identification number, grid location, size, orientation and shape on a measured drawing.
c. If more than one drawing is used, all the drawings shall have the same scale. Use a common architectural scale.
d. In lieu of the above, the Contractor may make a direct tracing of the structure using plastic sheeting. Record the identification number on the tracing.
7. Mark each stone unit to be removed indicating orientation.
8. Remove and clean each stone of mortar and store in a protected secure location.
9. Arrange storage of units so they may be readily retrieved for re-installation.
10. Reinstallation: Specified under Section 04425.
B. Existing Metal Elements:
1. Carefully remove items, record locations relative to the grid on the drawing.
2. Deliver items to shop, for restoration and repair.
3. Restoration, repair and reinstallation: Specified under Section 05900.
1.05 ALTERATION PROCEDURES
A. New Materials: Match existing products and work for patching and extending elements.
B. Remove unsuitable material, such as decayed wood, corroded metal, and deteriorated masonry and concrete.
Replace with specified new products.
1.06 REPAIR OF SURFACES
A. Patch or replace portions of existing surfaces to remain which are damaged, lifted, or discolored.
B. Repair substrate as necessary, before patching finish.
C. Finish patches to provide a uniform finish and texture over entire plane. When finish cannot be matched, refinish entire plane to nearest intersections.
1.07 HAZARDOUS MATERIAL
A. If undocumented hazardous materials are observed or suspected in the project area, proceed under contract clause Differing Site Conditions, immediately stop Work and notify the C.O.
Januaury, 2011 Wahkeena/Eagle Creek Stonework Restoration CSI Spec- 01310 Page 2 of 2
SECTION 01400
QUALITY REQUIREMENTS
1.01 SUMMARY
A. Section Includes:
1. Quality assurance.
2. Field samples.
1.02 QUALITY ASSURANCE
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with the applicable instructions of indicated manufacturers.
1.03 FIELD SAMPLES
A. Provide a cured mortar sample to verify it matches existing mortars.
Januaury, 2011 Wahkeena/Eagle Creek Stonework Restoration CSI Spec- 01400 Page 1 of 1
SECTION 01600
PRODUCT REQUIREMENTS
1.01 SUMMARY
A. Section Includes:
1. Product options.
2. Product delivery, storage and handling.
B. Related Sections:
1. Section 01100 - Summary.
1.02 PRODUCTS
A. Use interchangeable components of the same manufacturer for similar components.
1.03 DELIVERY, STORAGE AND HANDLING
A. Transport, handle, store and protect products in accordance with manufacturer's instructions.
B. Arrange deliveries in accordance with construction schedules; coordinate to avoid conflict with Work and site conditions.
C. Deliver products in undamaged condition in manufacturer's original containers or packaging with identifying labels intact and legible.
D. Inspect shipments to assure compliance with Contract Documents and reviewed submittals, and that products are undamaged.
E. Prevent soiling or damage to products or packaging.
F. Interior Storage: Maintain required temperature and humidity ranges. Verify that Owner furnished storage meets product manufacturer's requirements.
G. Exterior Storage: Store materials above ground to prevent soiling, and/or moisture infiltration. Cover materials with waterproof breathable sheet coverings; provide adequate ventilation.
H.…
This is the start of the file's text. The full file is on GovTribe.