Jim_Cr_Bridge_Drawings.pdf
PDF 11 MB Posted
- Attached to
- Jim Creek Bridge Replacement Federal contract opportunity
- Solicitation number
- AG-03R6-S-16-0015
About this file
Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LC_10_D1_01FNF-LNF-HNF-LCNFFoodOrder.docx | DOCX document | |
| 2016012803R6S160015FinalJimCrBidgeReplacement.pdf | ||
| Jim_Creek__888-3.15_FSSS_2_25_14.pdf | ||
| DOLHighwayLakeCountyMT80.pdf | ||
| Jim_cr_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REGION ONEREGION ONE
CQ = Contract Quantity; AQ= Actual Quantity; LSQ = Lump Sum Quantity
ITEM NO. ITEM DESCRIPTION
MEASUREMENT
JIM CREEK
BRIDGE
NO. 888-3.15
METHOD UNIT
15101 MOBILIZATION
LSQ Lump Sum
15713 SOIL EROSION AND POLLUTION CONTROL
LSQ Lump Sum
15730 DEWATERING
LSQ Lump Sum
20304
REMOVE AND DISPOSE EXISTING TIMBER BRIDGE. SALVAGE TIMBER
STRINGERS AND CURBS
AQ
Each 1
20806 STRUCTURE EXCAVATION
LSQ Lump Sum
25101
PLACED RIPRAP, CLASS 3 MACHINE PLACED (CONTRACTOR
FURNISHED)
CQ
Cubic Yard 150
27201 GEOCELL ABUTMENT STABILIZATION
CQ Square Yard
31.1
30809A
CRUSHED AGGREGATE, SURFACING (CONTRACTOR FURNISHED) CQ
Cubic Yard 45
30809B
CRUSHED AGGREGATE, BASE (CONTRACTOR FURNISHED) CQ
Cubic Yard 55
40401 MINOR HOT MIX ASPHALT CONCRETE
CQ
Ton 22
55301
PRECAST PRESTRESSED CONCRETE STRUCTURAL MEMBERS,
BULB-TEE BEAMS
AQ
Each 3
553A01A
PRECAST CONCRETE MEMBER, GRADE BEAM AQ
Each 2
553A01B
PRECAST CONCRETE MEMBER, WINGWALL AQ
Each 4
60201 18" DIA. CORRUGATED STEEL PIPE
AQ
Linear Foot 36
62201
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB AQ
Hour 8
62202
EQUIPMENT RENTAL, LARGE DUMP TRUCK AQ
Hour 8
62503
SEEDING, DRY METHOD, WITH MULCH LSQ Lump Sum
63305 WOOD POSTS
AQ
Linear Foot 36
63306 OBJECT MARKERS
AQ
Each 4
CONTROL POINT TABLE
CENTERLINE POINTS
REGION ONE
STA 0+80 to STA 1+75
STA 3+45 to STA 4+40
STA 1+75 to BRIDGE
BRIDGE to STA 3+45
1 1
1 1
REGION ONE
STA 1+75
STA 3+45
U
G
T
UGT
G
T
U G
T
U G
T
U G
T
UGT
UGT
REGION ONE
SCALE IN FEET
0 15 30
J I M
C R E E K
1 1
J I M
C R E E K
REGION ONE
SCALE IN FEET
0 10 20
I M
C R E E K
SCALE IN FEET
0 10 20
REGION ONE
During riprap placement the Contractor must isolate work zones from flowing or standing water to prevent turbid water and sediments from being discharged into streams or other drainages that flow directly into the stream. Divert flowing water around the work zone. Address riprap placement in the Dewatering and Sediment Control Plan. See
DEWATERING AND SOIL EROSION CONTROL notes on Sheet 8.
I M
C R E E K
REGION ONE
SECTION ALONG C/L BEARING:
ABUTMENT NO. 1
SECTION ALONG C/L BEARING:
ABUTMENT NO. 2
UPSTREAM
END
DOWNSTREAM
END
UPSTREAM
END
DOWNSTREAM
END
SCALE IN FEET
0 10 20
C
A
C
C
A
A
A
SECTION A - A
B
B
B
A
SECTION B - B
SECTION C - C
C C
C
ELEVATION
1/4
ELEVATION
A A B B
SECTION B - BSECTION A -A
SECTION C - C
C C
D D
SECTION D - D
ELEVATION
PLAN
ELEVATION
SECTION
A
A
SECTION A - A
SECTION B - B
A
A
B B
1/4
PLAN VIEW
NFSR 888 MP 3.15
ROAD CROSS SECTIONS
JIM CREEK