Solicitation.pdf

PDF 163 KB Posted

Attached to
36 Foot Dry Vans Federal contract opportunity
Solicitation number
AG-03R6-S-14-0062
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

Specifications Provisions and Clauses.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-03R6-S-14-0062

Dry Vans for NRFK

SERVICES AND PRICES

Schedule of Items

Item No. Description Quantity Unit Price Total Price

1 Dry Vans 2

2 Shipping 1

Total Price

Required Submittals:

Price Sheet with Address, Phone Number, Contact Information, Duns Number and Tax Identification Number Specification Sheet with drawings if available.

Certs and Reps

E-Mail Proposals

(a) Definition. "Facsimile Proposal," as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.

(b) Definition. “E-Mail Proposal,” as used in this provision, means a proposal, revision, or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via e-mail.

(c) Offerors may submit facsimile proposals or e-mail proposals as responses to this solicitation. Fax to 406.329.3876 or email to tlmitchell@fs.fed.us. Send an email to the preceding email to get an assurance your fax was received or call 406.329.1009.

Response Date is July 15, 2014.

Specifications must be met or filled with equivalent replacements.

SPECIFICATIONS

Two (2) each 36’ long Dry Vans at the Aerial Fire Depot in Missoula, Montana. Requirements for the dry vans are as follows:

Type of Rear Frame – Swing Type of Suspension- Spring Quality of Axels - Two Axels

GEOMETRIC DIMENSIONS include:

Serial Plate - U.S. Certification Plate Overall Height – 13’6” Front Inside Height = 110.3”

Rear Inside Height = 110.8” Overall Length – 36’0” Overall Width – 102.36” Upper Coupler Height – 47” King Pin Location – 36.00” Support Gear Location – 97.50” c/c to Kingpin Type of Bogie – Slide “B” Bogie modified for walk ramp installation Locking Mechanism – 4-Pin non-air assist.

ROOF requirements:

Amount of Wedge - .50” Roof Bows – Galvanized 1”Deep Anti-Snag Roof Bows on 24” Centers Bonded to roof sheet Roof Sheets - .040” 1 piece aluminum.

FRONT requirements:

Front Corner – 6” Radius Front Corner sheet - .050” Aluminum, Front sheets - .050” Aluminum Front Uprights – (6) 16 gauge. Steel hat section 2.50” deep x 5” wide Hose Couplers (Glad-hands) – Tramec Control & Supply Front Vents – Front Vent without access system Document Holder Standard – Trucklite #97859 document holder located on roadside front.

FRONT VENT requirements:

1- LOUVERED VENT

Front Vent Screen – None Location of Front Vent- Upper Roadside.

SIDE Requirements:

Side sheet material - .050” Aluminum Side sheet texture – Flat Bottom Rail Rivets - .38” Heavy-duty aluminum rivets Side Upright Locations – 24” centers w/ 12” from front to support gear Side Upright Type – 1.25” “A” slot single punched logistics hat section

UNDERSTRUCTURE requirements:

Upper Coupler – 3.50” upper coupler floor butted coupler Main beam Plate - .31” 1-Piece Approach Plate - .19 with roll-lip turn-up Support Gear – Fast Gear Support Gear Handle Location – Roadside Sand Shoes – 10” x 10” with Rubber cushion foot that eliminates 50% of shock forces that are transferred into the cross members, floor and bottom rails Support Gear Bracing – Install K-Bracing between legs with fore and aft bracing Tire Carrier – Single rack tire carrier on curbside Cross members Ahead of SIG – Steel hat section on 8” centers (50,000 PSI) Cross members Over SIG – 4” Steel “I” beam on 12” centers (80,000 PSI) (Pre Wax Coated) Bay Area Cross members – 4 “ Steel “I” beam on 12” centers (80,000 PSI) (Pre Wax Coated) URG Cross members – 4” Steel “I” beam on 12”centers (80,000 PSI) (Pre Wax Coated) Extra Cross members – at Rear Table – 2 Amount of Extra Spacing Cross members – 8” C/C Last 4’ of trailer.

SUSPENSION (SPRING RIDE) requirements:

Type of Spring Suspension – Binkley Duralite with standard hangers Axle Centers – 49” Springs – 3 Leaf Spring.

WALKRAMP DETAIL (REAR) requirements:

Type of Ramp – Todco, 16’ Grate style Rollaramp #39330-6144 or equal Ramp Carrier – With Fully-Enclosed (W/Top) Carrier Lift Assist Rear Frame Walk ramp Prep.

UNDERSTRUCTURE; LOWER RUNNING requirements:

Brake Size 16.5” X 7” Axle Type – Meritor TN .50” wall axle with tapered spindle and HM series bearings (22,500#) Hub/Wheel and Drum – Hub Piloted universal 10 stud hub with outboard cast drum Hub/Wheel Vendor – standard Tire Size – 295/75R22.5 Tire Brand – R195 F (G) Rim/Disc Wheel Size – 22.5” X 8.25” Wheel Type- Hub piloted steel disc wheel with 5 hand holes Wheel/Rim Vendor – standard, Brake Lining – Meritor MA212, Anti-lock Brakes – Wabco 2s/1M Easy Stop, Brake Actuators – Haldex (Anchorlok) 3030 gold seal 2.5” stroke, Brake Valves – Sealco, Air Tank Drain Valve – Manual, Brake Adjusters – Meritor Automatic 5.50” Wheel Lubricant – Kendall EEL, Grease Wheel Seals – Stemco Guardian, Hubcaps – Aluminium with window without pipe plug Mudflaps - smooth black plastic, Mudflap Mounting Position – On Undercarriage Axle Package – Bare Axle, Brake Shoe Type – Meritor “Q” (Standard), Axle Spindle Nuts – Pro-Torq Spindle Nut—Tapered.

REAR OPTIONS (SWING) requirements:

Rear Frame Material – Rear post carbon steel comb type for swing doors Rear Frame Header – Narrow rear header with rain deflector for swing doors Buck Plate – Carbon steel Rear Impact Guard – Carbon steel welded vertical channels and horizontal tube Access System – Install handhold on roadside rear door and rear impact guard to have intermediate channel Type of Rear Door - .75” Plymetal swing with Tri-seal gasket and aluminum cover sheet Lock Rods – 1 per Rear Door Hinges per Door – 4 per Rear Door Rear Door Cam – without Rear Vent Screen – Aluminum Screen, Rear Vent Locations – Lower rear curbside Rear bumpers – Rubber bumpers at rear corners License Plate Installation – Carbon steel license plate bracket Rear Door Holdback

INTERIOR LINING AND FLOOR requirements:

Front Lining – .019” Premium Galvalume lining (or better) overlaid on .25” Plywood (SSL) Side lining -.019 (or better) Preimium Galvalume lining. (80000#) (SSL) Rear Door Lining – .019” Galvalume Ceiling Lining – No Ceiling Lining Type of Floor – 1.25” Aluminum heavy-duty dry cargo floor without nailing strips Top Floor Rating is – 14,000# With 4” Stl C/M 12” C/C. INTERIOR; FLOOR:

Threshold Plate – 12 gauge Steel Threshold x 3” deep Floor Welding – Not welded CARGO requirements: Qty of Rows of Logistics Track – 3 Rows

FIRST ROW OF LOGISTICS TRACK:

Type of Track – “Ell Track overlaid on lining Track length - Full length each side Track Material or Finish – Galvanized steel Track Height- 24” Floor to Centerline.

SECOND ROW OF LOGISTICS TRACK:

Track Length – Full length each side, Track Height – 48” Floor toe centerline.

THIRD ROW OF LOGISTICS TRACK:

Track Length- Full length each side Track Height – 72” Floor to centerline

SPECIAL INTERIOR AND LIGHTS:

Wiring Harness – Long Life Lighting System installed thru cross members Electrical Connection – Phillips 7-Way connector without circuit breakers with solid pins and 28 pin push on connector and nylon box Electrical Connector location. – Offset to roadside and overlaid on front Type of Clearance lights – Grote Model #21 “LED” rectangular 45 degree Front Top Rail Lights – 1 –each side at 45 degrees Side Bottom Lights – 1 Each Side Side Bottom Light Locations – 1 at rear Rear Header Light Locations – 5-Center cluster of 3 and 1 each side outboard corner Buck plate Light Type – Grote Model # 40 “LED” flange mounted Buck plate lights Quantity and Location – 2 Each side Midship Turn Signal – Grote 6” oval combination including clearance light Midship Turn Signal Location – Located roadside and curbside at center of trailer Midship Turn signal Position – Attach to cross member flush with bottom rail Rear Gusset Lamp - Grate Model #21 “LED” rectangular Rear ABS Lamp - Grote model #35 “LED” rectangular

EXTERIOR FINISH:

Front Finish - Pre-painted white aluminum Side Finish – Pre-painted white aluminum Rear Frame Finish – white Rear Door Finish - Pre-painted white aluminum

SPECIAL FINISH:

Paint Undercarriage – Gray Chassis Color Paint wheels- White Enamel Conspicuity Treatment location – 3M Front Finish – Pre-Painted white aluminum Side Finish – Pre-painted white aluminum Rear Frame Finish – white Handhold on roadside door Tire carrier (1) single curbside Spare tire for trailer

Required delivery: 30-120 days after award

Deliver to:

Northern Rockies Fire Cache 5765 West Broadway Missoula, MT 59808

(406) 329-4949

CONTRACT CLAUSES

FAR 52.212-4 Contract Terms and Conditions - Commercial Items (MAY 2014)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights--

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Government-wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice. (1) The Contractor shall submit an original invoice attached to the electronic invoice to the IPP system designated in the contract to receive invoices. An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, contract line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to be notified in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer – System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer - Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected contract line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by

33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause.

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) System for Award Management (SAM).

(1) Unless exempted by an addendum to this contract, the Contractor is responsible during performance and through final payment of any contract for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete.

Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(2) (i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in FAR Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the SAM database; (B) comply with the requirements of Subpart 42.12; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (t)(2)(i) of this clause, or fails to perform the agreement at paragraph (t)(2)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(3) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM database. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the "Suspension of payment" paragraph of the EFT clause of this contract.

(4) Offerors and Contractors may obtain information on registration and annual confirmation requirements via CCR accessed through http://www.acquisition.gov or by calling 1-888-227-2423 or 269-961-5757.

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statue and specifically authorized under applicable agency regulations and procedures.

FAR 52.204-13 System for Award Management Maintenance (JUL 2013)

(a) Definitions. As used in this clause—

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal contractors.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart 32.11) for the same concern.

“Registered in the System for Award Management (SAM) database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the

DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see Subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the

Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record “Active”.

“System for Award Management (SAM)” means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR Subpart 4.14; and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c) (1) (i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor’s SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the DUNS number is maintained with Dun & Bradstreet throughout the life of the contract. The Contractor shall communicate any change to the DUNS number to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the DUNS number does not necessarily require a novation be accomplished. Dun & Bradstreet may be contacted

(i) Via the internet at http://fedgov.dnb.com/webform or if the contractor does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States;

or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(d) Contractors may obtain additional information on registration and annual confirmation requirements at http://www.acquisition.gov.

AGAR 452.209-71 Assurance Regarding Felony Conviction or Tax Delinquent Status for

Corporate Applicants (FEB 2012) Alternate I (FEB 2012)

(a) This award is subject to the provisions contained in sections 433 and 434 of the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, as amended and/or subsequently enacted, regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434, amended and/or subsequently enacted.

FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013)

(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.

(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.

(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.

FAR 52.236-7 Permits and Responsibilities (NOV 1991)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence.

The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract.

Warranty

Warranty

The Contractor shall guarantee the Dry Vans and all parts furnished by him against defective material and workmanship for a period of one (1) year from the date of acceptance, or what ever the length of the manufacture warranty . The Government will except the longer of the two warranties. The Contractor shall furnish the required parts as soon as notified and determine warranty adjustment after receipt of the failed components.

The Contractor shall be the source for warranty work regardless of the make of the component.

Contract Time

AGAR 452.211-75 Effective Period of the Contract (FEB 1988)

The effective period of this contract is from Date of Award through 120 days after award.

Invoice Processing Platform (IPP)

The Forest Service is utilizing the Invoice Processing Platform (IPP) for the electronic submission and tracking of contracts/purchase orders, invoices, and payment information. IPP is a secure Government-wide, Web-based invoice processing service. Visit http://www.ipp.gov to learn more.

Upon award of a contract, Contractors must enroll at https://www.ipp.gov/vendors/enrollment-vendors.htm. Contractors shall submit all invoices electronically via IPP. Paper copies of invoices will no longer be accepted.

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations

– http://www.usda.gov/procurement/policy/agar.html.

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive

Orders - Commercial Items (MAY 2014)

(a) The Contractor shall comply with the following Federal Acquisition Regulations (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest after Award (AUG 1996) (31 U.S.C 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer shall check as appropriate.]

(1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEPT 2006), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

(2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

(3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUNE 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

(4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (JUL 2010) (Pub. L. 111-5).

(6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

(7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

(8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) (31 U.S.C. 6101 note).

(9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013) (41 U.S.C. 2313).

(10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).

(11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

(12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JAN 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

(13) [Reserved]

(14) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

(ii) Alternate I (NOV 2011).

(iii) Alternate II (NOV 2011).

(15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (JUNE 2003) (15 U.S.C. 644).

(ii) Alternate I (OCT 1995) of 52.219-7.

(iii) Alternate II (MAR 2004) of 52.219-7.

(16) 52.219-8, Utilization of Small Business Concerns (MAY 2014) (15 U.S.C. 637 (d)(2) and (3)).

(17) (i) 52.219-9, Small Business Subcontracting Plan (JUL 2013) (15 U.S.C. 637(d)(4)).

(ii) Alternate I (OCT 2001) of 52.219-9.

(iii) Alternate II (OCT 2001) of 52.219-9.

(iv) Alternate III (JUL 2010) of 52.219-9.

(18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

(19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

(20) 52.219-16, Liquidated Damages—Subcontracting Plan (JAN 1999) (15 U.S.C.

637(d)(4)(F)(i)).

(21) (i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (OCT 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

(ii) Alternate I (JUNE 2003) of 52.219-23.

(22) 52.219-25, Small Disadvantaged Business Participation Program--Disadvantaged Status and Reporting (JUL 2013) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

(23) 52.219-26, Small Disadvantaged Business Participation Program--Incentive Subcontracting (OCT 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

(24) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657 f).

(25) 52.219-28, Post Award Small Business Program Rerepresentation (JUL 2013) (15 U.S.C. 632(a)(2)).

(26) 52.219-29 Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns (JUL 2013) (15 U.S.C. 637(m)).

(27) 52.219-30 Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (JUL 2013) (15 U.S.C. 637(m)).

(28) 52.222-3, Convict Labor (JUNE 2003) (E.O. 11755).

(29) 52.222-19, Child Labor - Cooperation with Authorities and Remedies (JAN 2014) (E.O. 13126).

(30) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).

(31) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(32) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

(33) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C.

793).

(34) 52.222-37, Employment Reports on Veterans (SEP 2010) (38 U.S.C. 4212).

(35) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act

(DEC 2010) (E.E. 13496).

(36) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

(37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)) (Not applicable to the acquisition of commercially available off-the-shelf items.)

(ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

(38) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

(39)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (DEC 2007) (E.O. 13423).

(ii) Alternate I (DEC 2007) of 52.223-16.

(40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving

(AUG 2011) (E.O. 13513).

(41) 52.225-1, Buy American - Supplies (MAY 2014) (41 U.S.C. chapter 83).

(42)(i) 52.225-3, Buy American - Free Trade Agreements - Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).

(ii) Alternate I (MAY 2014) of 52.225-3.

(iii) Alternate II (MAY 2014) of 52.225-3.

(iv) Alternate III (MAY 2014) of 52.225-3.

(43) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

(44) 52.225-13, Restrictions on Certain Foreign Purchases (JUNE 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

(45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42. U.S.C.

5150).

(47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42. U.S.C. 5150).

(48) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f).

(49) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C.

4505, 10 U.S.C. 2307(f)).

(50) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management

(JUL 2013) (31 U.S.C. 3332).

(51) 52.232-34, Payment by Electronic Funds Transfer--Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

(52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

(53) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

(54) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

(ii) Alternate I (APR 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, which the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

(1) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

(2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C.

206 and 41 U.S.C. chapter 67).

(3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards – Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

(4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

(5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).

(6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (MAY 2014) (41 U.S.C. chapter 67).

(7) 52.222-17, Nondisplacement of Q qualified Workers (MAY 2014) (E.O. 13495).

(8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

(9) 52.237-11, Accepting and Dispensing of $1 Coin (SEPT 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records-- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) or (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause -

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (MAY 2014) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

Flow down required in accordance with paragraph (1) of FAR clause 52.222-17.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 2010) (29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C.

chapter 67).

(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(x) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (MAY 2014) (41 U.S.C. chapter 67).

(xi) 52.222-53, Exemption from Application…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .